Plan Review Details - Permit 21090768
Plan Review Stops For Permit 21090768
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2021-11-04 Cont ID  
Sent By rmcdouga Date 2021-11-04 Time 14:06 Rev Time 0.00
Received By rmcdouga Date 2021-11-04 Time 14:06 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2021-10-22 Cont ID  
Sent By fgiaquin Date 2021-10-22 Time 21:51 Rev Time 0.00
Received By fgiaquin Date 2021-10-22 Time 20:55 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status P Date 2021-10-15 Cont ID  
Sent By lcrespo Date 2021-10-15 Time 07:40 Rev Time 0.00
Received By lcrespo Date 2021-10-15 Time 07:40 Sent To  
Notes
2021-10-15 07:41:0210/15/21 REVIEWED FOR CODE COMPLIANCE (GAS)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS, OR THEIR REPRESENTATIVES
 FROM THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL,
 STATE, AND NATIONAL CODES AND STANDARDS IN EFFECT AT
 THE TIME OF PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK
 OF EVERY ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2021-12-15 Cont ID  
Sent By vbroglia Date 2021-12-15 Time 11:29 Rev Time 0.00
Received By vbroglia Date 2021-11-04 Time 15:42 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2021-11-04 Cont ID  
Sent By rmcdouga Date 2021-11-04 Time 14:06 Rev Time 0.00
Received By rmcdouga Date 2021-09-28 Time 11:54 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status N Date 2021-10-15 Cont ID  
Sent By lcrespo Date 2021-10-15 Time 07:41 Rev Time 0.00
Received By lcrespo Date 2021-10-15 Time 07:41 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2021-11-04 Cont ID  
Sent By rmcdouga Date 2021-11-04 Time 11:13 Rev Time 0.00
Received By rmcdouga Date 2021-11-04 Time 11:13 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2021-12-15 Cont ID  
Sent By vbroglia Date 2021-12-15 Time 11:19 Rev Time 0.00
Received By vbroglia Date 2021-12-15 Time 11:19 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2021-10-06 Cont ID  
Sent By rthermid Date 2021-10-06 Time   Rev Time  
Received By rthermid Date 2021-10-06 Time   Sent To I
Notes
2021-10-06 09:57:10ON THE SUBMITTED SURVEY, PROVIDE THE SETBACKS OF THE
 GENERATOR FROM ALL PROPERTY LINES, PER THE CITY ZONING
 CODE, MECHANICAL EQUIPMENT CANNOT ENCROACH MORE THAN 4
 FEET INTO A REQUIRED SETBACK.
  
 RAFAELA THERMIDOR, ASSOCIATE PLANNER
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved