Plan Review Details - Permit 21090767
Plan Review Stops For Permit 21090767
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2021-10-22 Cont ID  
Sent By rmcdouga Date 2021-10-22 Time 10:41 Rev Time 0.00
Received By rmcdouga Date 2021-10-22 Time 10:41 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2021-10-13 Cont ID  
Sent By ppetty Date 2021-10-13 Time 13:40 Rev Time 0.00
Received By ppetty Date 2021-10-13 Time 13:40 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2021-11-01 Cont ID  
Sent By lcrespo Date 2021-11-01 Time 13:19 Rev Time 0.00
Received By lcrespo Date 2021-10-25 Time 11:16 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2021-10-22 Cont ID  
Sent By rmcdouga Date 2021-10-22 Time 10:41 Rev Time 0.00
Received By rmcdouga Date 2021-09-17 Time 10:31 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status P Date 2021-11-01 Cont ID  
Sent By lcrespo Date 2021-11-01 Time 13:22 Rev Time 0.00
Received By lcrespo Date 2021-11-01 Time 13:19 Sent To  
Notes
2021-11-01 13:23:1111/01/21 REVIEWED FOR CODE COMPLIANCE (PLUMBING/POOL)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS, OR THEIR REPRESENTATIVES
 FROM THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL,
 STATE, AND NATIONAL CODES AND STANDARDS IN EFFECT AT
 THE TIME OF PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK
 OF EVERY ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2021-10-04 Cont ID  
Sent By lcrespo Date 2021-10-04 Time 14:19 Rev Time 0.00
Received By lcrespo Date 2021-10-04 Time 14:19 Sent To  
Notes
2021-10-04 14:19:3810/04/21 1ST POOL PLUMBING REVIEW**DENIED** WITH
 COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME, AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. THE SUBMITTED TDH CALCULATIONS DO NOT APPEAR TO SHOW
 THE FRICTION LOSS THROUGH ALL THE SYSTEM COMPONENTS.
 THE CALCULATOR SHOWS THE PIPE, FITTINGS, VALVES FILTER,
 BUT THERE IS NO FRICTION LOSS ASSOCIATED WITH THESE
 HEAT PUMP AND SALT CHLORINATORS. WOULD YOU PLEASE
 CLARIFY PER THE WPB AMENDMENTS TO THE FBC SEC. 107.2.1
 INFORMATION ON CONSTRUCTION DOCUMENTS?
  
 2. INDICATE ON THE PUMP CURVE WHICH CURVE KEY IS FOR
 THE PUMP BEING INSTALLED ON THIS SYSTEM PER THE WPB
 AMEND. TO FBC SEC. 107.2.1.
  
 WHEN RESUBMITTING PLANS, PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY NECESSARY PAGES.
 A TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW
 COMMENT NUMBER, WITH A DESCRIPTION OF THE REVISION
 MADE, IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE
 THE CHANGES CAN BE FOUND WILL HELP EXPEDITE YOUR
 PERMIT. THANK YOU FOR YOUR ANTICIPATED COOPERATION.
  
 HTTPS://CODES.ICCSAFE.ORG/CODES/FLORIDA
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2021-11-01 Cont ID  
Sent By lcrespo Date 2021-11-01 Time 13:22 Rev Time 0.00
Received By lcrespo Date 2021-11-01 Time 13:22 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2021-10-22 Cont ID  
Sent By rmcdouga Date 2021-10-22 Time 10:41 Rev Time 0.00
Received By rmcdouga Date 2021-10-22 Time 10:41 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date   Cont ID  
Sent By awooten Date 2021-09-29 Time   Rev Time  
Received By   Date 2021-09-29 Time   Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved