Plan Review Stops For Permit 21090547 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
5 |
Status |
P |
Date |
2021-11-30 |
|
|
Cont ID |
|
Sent By |
jbrooks |
Date |
2021-11-30 |
Time |
13:02 |
Rev Time |
0.00 |
Received By |
jbrooks |
Date |
2021-11-30 |
Time |
08:04 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
4 |
Status |
F |
Date |
2021-11-23 |
|
|
Cont ID |
|
Sent By |
jbrooks |
Date |
2021-11-23 |
Time |
14:32 |
Rev Time |
0.00 |
Received By |
jbrooks |
Date |
2021-11-23 |
Time |
07:54 |
Sent To |
|
|
Notes |
2021-11-23 14:32:58 | JONATHAN BROOKS JR. | | BUILDING PLANS EXAMINER | | WORK HOURS: MONDAY - FRIDAY 7:00 AM TO 3:00 PM | | PHONE (561) 805-6656 | | EMAIL: [email protected] | | | | 1ST REVIEW: FBC 2020 7TH EDITION | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | FBC B = FBC BUILDING | | FBC R = FBC RESIDENTIAL | | FBC EB = FBC EXISTING BUILDING | | FBC A = FBC ACCESSIBILITY | | FBC EC = FBC ENERGY CONSERVATION | | WPB A = CITY OF WEST PALM BEACH AMENMENTS TO THE FBC | | RESULTS: DENIED | | ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT | | TO RESUBMIT, YOU CAN EITHER DROP OFF YOUR SUBMITTAL AT | | CITY HALL, OR EMAIL [email protected] AND REQUEST | | THAT IT BE CONVERTED TO PROJECTDOX. | | | | 1. FBC R 301 FAC9N-3 FLORIDA STATE PRODUCT APPROVAL | | FL5374-R6 IS INCOMPLETE, PROVIDE THE FOLLOWING | | ADDITIONAL INFORMATION: EVALUATION REPORT PAGES 1-7 TO | | INCLUDE LIMITATIONS PAGE(S). THE EVALUATION REPORTS CAN | | BE PRINTED FROM THE SUMMARY OF PRODUCTS LOCATED AT THE | | BOTTOM OF THE COVER PAGE. | | | | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMEMTS. | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
F |
Date |
2021-11-17 |
|
|
Cont ID |
|
Sent By |
jbrooks |
Date |
2021-11-17 |
Time |
11:46 |
Rev Time |
0.00 |
Received By |
jbrooks |
Date |
2021-11-17 |
Time |
07:51 |
Sent To |
|
|
Notes |
2021-11-17 11:47:00 | JONATHAN BROOKS JR. | | BUILDING PLANS EXAMINER | | WORK HOURS: MONDAY - FRIDAY 7:00 AM TO 3:00 PM | | PHONE (561) 805-6656 | | EMAIL: [email protected] | | | | 1ST REVIEW: FBC 2020 7TH EDITION | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | FBC B = FBC BUILDING | | FBC R = FBC RESIDENTIAL | | FBC EB = FBC EXISTING BUILDING | | FBC A = FBC ACCESSIBILITY | | FBC EC = FBC ENERGY CONSERVATION | | WPB A = CITY OF WEST PALM BEACH AMENMENTS TO THE FBC | | RESULTS: DENIED | | ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT | | TO RESUBMIT, YOU CAN EITHER DROP OFF YOUR SUBMITTAL AT | | CITY HALL, OR EMAIL [email protected] AND REQUEST | | THAT IT BE CONVERTED TO PROJECTDOX. | | | | 1. FBC R 301 FAC9N-3. PROVIDE A COMPLETE SET OF 2020 | | CODE VERSION PRODUCT APPROVALS/NOA'S FOR THE PROPOSED | | HIP & RIDGE METAL TO BE USED. (FL5374-R6). SECOND | | REQUEST. | | | | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMEMTS. | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
F |
Date |
2021-11-05 |
|
|
Cont ID |
|
Sent By |
jbrooks |
Date |
2021-11-05 |
Time |
13:30 |
Rev Time |
0.00 |
Received By |
jbrooks |
Date |
2021-11-05 |
Time |
08:33 |
Sent To |
|
|
Notes |
2021-11-05 13:31:05 | JONATHAN BROOKS JR. | | BUILDING PLANS EXAMINER | | WORK HOURS: MONDAY - FRIDAY 7:00 AM TO 3:00 PM | | PHONE (561) 805-6656 | | EMAIL: [email protected] | | | | 1ST REVIEW: FBC 2020 7TH EDITION | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | FBC B = FBC BUILDING | | FBC R = FBC RESIDENTIAL | | FBC EB = FBC EXISTING BUILDING | | FBC A = FBC ACCESSIBILITY | | FBC EC = FBC ENERGY CONSERVATION | | WPB A = CITY OF WEST PALM BEACH AMENMENTS TO THE FBC | | RESULTS: DENIED | | ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT | | TO RESUBMIT, YOU CAN EITHER DROP OFF YOUR SUBMITTAL AT | | CITY HALL, OR EMAIL [email protected] AND REQUEST | | THAT IT BE CONVERTED TO PROJECTDOX. | | | | 1. FBC R 301 FAC9N-3. PROVIDE A COMPLETE SET OF 2020 | | CODE VERSION PRODUCT APPROVALS/NOA'S FOR THE PROPOSED | | HIP & RIDGE METAL TO BE USED. | | 2. FBC R 301 FAC9N-3. PROVIDE A COMPLETE SET OF 2020 | | CODE VERSION PRODUCT APPROVALS/NOA'S FOR THE PROPOSED | | HIP & RIDGE TILE ADHESIVE TO BE USED. | | | | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMEMTS. | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2021-09-16 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2021-09-16 |
Time |
16:49 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2021-09-16 |
Time |
14:18 |
Sent To |
|
|
Notes |
2021-09-16 16:49:50 | 1ST REVIEW FBC-2020 RES. BUILDING. | | PERMIT- 21090547 | | 9/16/21 | | | | CODES IN EFFECT: | | FBC RES- FLORIDA RESIDENTIAL BUILDING CODE 7TH EDITION | | 2020 | | FBC EX- FLORIDA EXISTING BUILDING CODE 7TH EDITION 2020 | | FS- FLORIDA STATUTES | | FAC- FLORIDA ADMINISTRATIVE CODE | | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC | | | | PLAN REVIEW RESULTS: DENIED. | | | | 1) THE MIAMI-DADE NOA 18-0919.07 FOR THE FLAT ROOF | | CONTAINED WITH THE CALCULATIONS MUST BE PROPERLY NAMED | | AND SUBMITTED AS A SEPARATE DOCUMENT. THE NOA SUBMITTAL | | SHALL INCLUDE THE COVER PAGE, PAGES 2-7, THE SELECTED | | SYSTEM PAGE 21, AND THE LIMITATIONS OF USE PAGE 27- FAC | | RULE 9N-3 & SECTION 107.2.1 WPB. | | | | 2) PLEASE ADD THE SLOPE OF THE TILE ROOF ON THE SKETCH. | | A COMPLETE REVIEW OF THE TILE ROOF CANNOT BE COMPLETED | | WITHOUT THE ROOF SLOPE INFORMATION- R905.3, FAC RULE | | 9N-3, AND SECTION 107.2.1 WPB. | | | | 3) MIAMI-DADE NOA #21-0107.04 TILE: PLEASE MARKUP | | TABLES 4, 5, 6 & 7 TO SHOW THE FASTENER TYPE, DECK | | PLYWOOD THICKNESS, AND ADHESIVE SYSTEM (IF APPLICABLE). | | PLEASE NOTE THAT INSTALLATIONS USING ADHESIVE REQUIRE | | SUBMITTAL OF A CURRENT MIAMI-DADE NOA OR FL. PRODUCT | | APPROVAL- FAC RULE 9N-3, AND SECTION 107.2.1 WPB. | | PLEASE NOTE THAT THE APPLICABLE DETAILS ON THE ADHESIVE | | PRODUCT APPROVAL OR NOA MUST BE MARKED OR HIGHLIGHTED. | | | | 4) MIAMI-DADE NOA #17-0614.22 UNDERLAYMENT: PLEASE | | CIRCLE OR HIGHLIGHT PRODUCT SELECTION ON PAGE 2, THE | | INSTALLATION PROCEDURE AND DECK TYPE ON PAGE 4, AND THE | | APPLICABLE GENERAL LIMITATIONS ON PAGE 5. 6, 7 & 8. | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | RE-SUBMITTAL FORM. | | | | CHRISTOPHER L. COLE | | BUILDING PLANS EXAMINER | | 401 CLEMATIS STREET | | WEST PALM BEACH FL 33401 | | 561-805-6719 | | [email protected] | | |
|
|
Review Stop |
HIST |
HISTORICAL |
Rev No |
1 |
Status |
P |
Date |
2021-10-18 |
|
|
Cont ID |
|
Sent By |
amhamilt |
Date |
2021-10-18 |
Time |
14:33 |
Rev Time |
0.00 |
Received By |
amhamilt |
Date |
2021-10-18 |
Time |
14:33 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
6 |
Status |
N |
Date |
2021-12-08 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2021-12-08 |
Time |
13:12 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2021-12-07 |
Time |
15:20 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
5 |
Status |
N |
Date |
2021-11-30 |
|
|
Cont ID |
|
Sent By |
jbrooks |
Date |
2021-11-30 |
Time |
13:02 |
Rev Time |
0.00 |
Received By |
jbrooks |
Date |
2021-11-24 |
Time |
09:06 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
4 |
Status |
N |
Date |
2021-11-23 |
|
|
Cont ID |
|
Sent By |
jbrooks |
Date |
2021-11-23 |
Time |
14:33 |
Rev Time |
0.00 |
Received By |
jbrooks |
Date |
2021-11-22 |
Time |
07:08 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2021-11-17 |
|
|
Cont ID |
|
Sent By |
jbrooks |
Date |
2021-11-17 |
Time |
11:47 |
Rev Time |
0.00 |
Received By |
jbrooks |
Date |
2021-11-16 |
Time |
09:32 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2021-11-05 |
|
|
Cont ID |
|
Sent By |
jbrooks |
Date |
2021-11-05 |
Time |
13:31 |
Rev Time |
0.00 |
Received By |
jbrooks |
Date |
2021-11-04 |
Time |
07:58 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2021-10-19 |
|
|
Cont ID |
|
Sent By |
lmarchan |
Date |
2021-10-19 |
Time |
09:34 |
Rev Time |
0.00 |
Received By |
lmarchan |
Date |
2021-09-14 |
Time |
05:54 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
6 |
Status |
P |
Date |
2021-12-08 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2021-12-08 |
Time |
13:12 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2021-12-08 |
Time |
13:12 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
5 |
Status |
F |
Date |
2021-11-30 |
|
|
Cont ID |
|
Sent By |
jbrooks |
Date |
2021-11-30 |
Time |
13:02 |
Rev Time |
0.00 |
Received By |
jbrooks |
Date |
2021-11-30 |
Time |
08:04 |
Sent To |
|
|
Notes |
2021-11-30 13:03:01 | JONATHAN BROOKS JR. | | BUILDING PLANS EXAMINER | | WORK HOURS: MONDAY - FRIDAY 7:00 AM TO 3:00 PM | | PHONE (561) 805-6656 | | EMAIL: [email protected] | | | | 1ST REVIEW: FBC 2020 7TH EDITION | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | FBC B = FBC BUILDING | | FBC R = FBC RESIDENTIAL | | FBC EB = FBC EXISTING BUILDING | | FBC A = FBC ACCESSIBILITY | | FBC EC = FBC ENERGY CONSERVATION | | WPB A = CITY OF WEST PALM BEACH AMENMENTS TO THE FBC | | RESULTS: DENIED | | | | FS471, DOCUMENTS PREPARED BY AN ENGINEER AND SUBMITTED | | FOR PUBLIC RECORD ARE TO BE SIGNED, SEALED, DATED | | ORIGINALS. A SCAN OF A SIGNED PLAN IS NOT CONSIDERED AN | | ORIGINAL. | | EITHER EMAIL A DIGITALLY OR ELECTRONICALLY SIGNED PLAN | | TO ME, OR YOU CAN MAIL OR DROP OFF ONE ORIGINAL SIGNED | | AND SEALED PAPER ORIGINAL WITH A WET SIGNATURE TO: | | PETER VALENTI | | BUILDING PLANS EXAMINER II | | BUILDING DIVISION | | CITY OF WEST PALM BEACH | | 401 CLEMATIS STREET, 1ST FLOOR | | WEST PALM BEACH, FL 33401 | | FEEL FREE TO CONTACT ME IF YOU WISH TO DISCUSS, | | 561-805-6673. | | |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
4 |
Status |
F |
Date |
2021-11-23 |
|
|
Cont ID |
|
Sent By |
jbrooks |
Date |
2021-11-23 |
Time |
14:33 |
Rev Time |
0.00 |
Received By |
jbrooks |
Date |
2021-11-23 |
Time |
13:44 |
Sent To |
|
|
Notes |
2021-11-23 14:33:45 | JONATHAN BROOKS JR. | | BUILDING PLANS EXAMINER | | WORK HOURS: MONDAY - FRIDAY 7:00 AM TO 3:00 PM | | PHONE (561) 805-6656 | | EMAIL: [email protected] | | | | 1ST REVIEW: FBC 2020 7TH EDITION | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | FBC B = FBC BUILDING | | FBC R = FBC RESIDENTIAL | | FBC EB = FBC EXISTING BUILDING | | FBC A = FBC ACCESSIBILITY | | FBC EC = FBC ENERGY CONSERVATION | | WPB A = CITY OF WEST PALM BEACH AMENMENTS TO THE FBC | | RESULTS: DENIED | | | | FS471, DOCUMENTS PREPARED BY AN ENGINEER AND SUBMITTED | | FOR PUBLIC RECORD ARE TO BE SIGNED, SEALED, DATED | | ORIGINALS. A SCAN OF A SIGNED PLAN IS NOT CONSIDERED AN | | ORIGINAL. | | EITHER EMAIL A DIGITALLY OR ELECTRONICALLY SIGNED PLAN | | TO ME, OR YOU CAN MAIL OR DROP OFF ONE ORIGINAL SIGNED | | AND SEALED PAPER ORIGINAL WITH A WET SIGNATURE TO: | | PETER VALENTI | | BUILDING PLANS EXAMINER II | | BUILDING DIVISION | | CITY OF WEST PALM BEACH | | 401 CLEMATIS STREET, 1ST FLOOR | | WEST PALM BEACH, FL 33401 | | FEEL FREE TO CONTACT ME IF YOU WISH TO DISCUSS, | | 561-805-6673. | | |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
3 |
Status |
F |
Date |
2021-11-17 |
|
|
Cont ID |
|
Sent By |
jbrooks |
Date |
2021-11-17 |
Time |
11:47 |
Rev Time |
0.00 |
Received By |
jbrooks |
Date |
2021-11-17 |
Time |
07:51 |
Sent To |
|
|
Notes |
2021-11-17 11:48:21 | JONATHAN BROOKS JR. | | BUILDING PLANS EXAMINER | | WORK HOURS: MONDAY - FRIDAY 7:00 AM TO 3:00 PM | | PHONE (561) 805-6656 | | EMAIL: [email protected] | | | | 1ST REVIEW: FBC 2020 7TH EDITION | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | FBC B = FBC BUILDING | | FBC R = FBC RESIDENTIAL | | FBC EB = FBC EXISTING BUILDING | | FBC A = FBC ACCESSIBILITY | | FBC EC = FBC ENERGY CONSERVATION | | WPB A = CITY OF WEST PALM BEACH AMENMENTS TO THE FBC | | RESULTS: DENIED | | | | FS471, DOCUMENTS PREPARED BY AN ENGINEER AND SUBMITTED | | FOR PUBLIC RECORD ARE TO BE SIGNED, SEALED, DATED | | ORIGINALS. A SCAN OF A SIGNED PLAN IS NOT CONSIDERED AN | | ORIGINAL. | | EITHER EMAIL A DIGITALLY OR ELECTRONICALLY SIGNED PLAN | | TO ME, OR YOU CAN MAIL OR DROP OFF ONE ORIGINAL SIGNED | | AND SEALED PAPER ORIGINAL WITH A WET SIGNATURE TO: | | PETER VALENTI | | BUILDING PLANS EXAMINER II | | BUILDING DIVISION | | CITY OF WEST PALM BEACH | | 401 CLEMATIS STREET, 1ST FLOOR | | WEST PALM BEACH, FL 33401 | | FEEL FREE TO CONTACT ME IF YOU WISH TO DISCUSS, | | 561-805-6673. | | |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
2 |
Status |
F |
Date |
2021-11-05 |
|
|
Cont ID |
|
Sent By |
jbrooks |
Date |
2021-11-05 |
Time |
13:31 |
Rev Time |
0.00 |
Received By |
jbrooks |
Date |
2021-11-05 |
Time |
08:33 |
Sent To |
|
|
Notes |
2021-11-05 13:31:44 | JONATHAN BROOKS JR. | | BUILDING PLANS EXAMINER | | WORK HOURS: MONDAY - FRIDAY 7:00 AM TO 3:00 PM | | PHONE (561) 805-6656 | | EMAIL: [email protected] | | | | 1ST REVIEW: FBC 2020 7TH EDITION | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | FBC B = FBC BUILDING | | FBC R = FBC RESIDENTIAL | | FBC EB = FBC EXISTING BUILDING | | FBC A = FBC ACCESSIBILITY | | FBC EC = FBC ENERGY CONSERVATION | | WPB A = CITY OF WEST PALM BEACH AMENMENTS TO THE FBC | | RESULTS: DENIED | | | | FS471, DOCUMENTS PREPARED BY AN ENGINEER AND SUBMITTED | | FOR PUBLIC RECORD ARE TO BE SIGNED, SEALED, DATED | | ORIGINALS. A SCAN OF A SIGNED PLAN IS NOT CONSIDERED AN | | ORIGINAL. | | EITHER EMAIL A DIGITALLY OR ELECTRONICALLY SIGNED PLAN | | TO ME, OR YOU CAN MAIL OR DROP OFF ONE ORIGINAL SIGNED | | AND SEALED PAPER ORIGINAL WITH A WET SIGNATURE TO: | | PETER VALENTI | | BUILDING PLANS EXAMINER II | | BUILDING DIVISION | | CITY OF WEST PALM BEACH | | 401 CLEMATIS STREET, 1ST FLOOR | | WEST PALM BEACH, FL 33401 | | FEEL FREE TO CONTACT ME IF YOU WISH TO DISCUSS, | | 561-805-6673. | | |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
F |
Date |
2021-09-16 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2021-09-16 |
Time |
16:51 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2021-09-16 |
Time |
16:51 |
Sent To |
|
|
Notes |
2021-09-16 16:55:40 | SIGNATURE REVIEW | | PERMIT- 21090547 | | 9/16/21 | | | | 1) THE ENHANCED FASTENING CALCULATIONS ARE NOT | | DIGITALLY SIGNED AND SEALED. ELECTRONICALLY TRANSMITTED | | PLANS AND DOCUMENTS PREPARED BY A FL. REGISTERED | | ENGINEER SHALL BEAR THE ENGINEER'S DIGITAL SIGNATURE | | AND SEAL OF- FL. STATUTE 471.025 AND SECTION | | 61G15-23.005 FAC. | | FLORIDA BOARD OF PROFESSIONAL ENGINEERS GUIDELINES FOR | | ELECTRONIC OR DIGITALLY SIGNED AND SEALED PLANS AND | | DOCUMENTS. | | | | A DIGITAL SIGNATURE MUST BE UNIQUE TO THE PROFESSIONAL | | ENGINEER USING IT, OBTAINED FROM A THIRD-PARTY | | CERTIFICATION AUTHORITY, AND CAPABLE OF VERIFICATION. | | THE CERTIFICATION AUTHORITY WILL VET THE PE AND PROVIDE | | A PASSWORD-PROTECTED DIGITAL SIGNATURE FILE. (FBPE DOES | | NOT APPROVE OR PROVIDE A LIST OF AUTHORITIES.) | | YOU MAY NOT USE THE DIGITAL OPTION PROVIDED IN ADOBE | | ACROBAT, SINCE IT IS SELF-AUTHENTICATED AND DOES NOT | | USE A THIRD PARTY. | | YOUR DIGITAL SIGNATURE MUST BE LINKED TO THE DOCUMENT | | IN SUCH A WAY THAT ANY CHANGE INVALIDATES THE SIGNATURE | | AND DOCUMENT. | | | | 2) AS AN ALTERNATE TO PROVIDING ELECTRONICALLY | | TRANSMITTED DIGITALLY SIGNED AND SEALED CALCULATIONS, | | ORIGINAL SIGNED AND SEALED PAPER CALCULATIONS CAN BE | | DROPPED OFF OR MAILED TO THE WPB BUILDING DEPT. WITH A | | PLAN REVIEW REQUEST FORM. | | | | BUILDING DIVISION, FIRST FLOOR | | CITY OF WEST PALM BEACH | | 401 CLEMATIS ST | | WEST PALM BEACH, FL 33401 | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | RE-SUBMITTAL FORM. | | | | CHRISTOPHER L. COLE | | MECHANICAL/PLUMBING PLANS EXAMINER | | 401 CLEMATIS STREET | | WEST PALM BEACH FL 33401 | | 561-805-6719 | | [email protected] | | | | |
|
|