Plan Review Stops For Permit 21090393 |
Review Stop |
AD |
ADDRESSING |
Rev No |
2 |
Status |
P |
Date |
2021-09-22 |
|
|
Cont ID |
|
Sent By |
cpuell |
Date |
2021-09-22 |
Time |
12:58 |
Rev Time |
0.00 |
Received By |
cpuell |
Date |
2021-09-22 |
Time |
12:58 |
Sent To |
|
|
Notes |
2021-09-22 12:58:29 | APPLICANT REACHED OUT CONFIRMED THAT THE WORK WAS TO BE | | DONE ON 871 VILLAGE BLVD # 601, UPDATED PERMIT |
|
|
Review Stop |
AD |
ADDRESSING |
Rev No |
1 |
Status |
F |
Date |
2021-09-16 |
|
|
Cont ID |
|
Sent By |
cpuell |
Date |
2021-09-16 |
Time |
15:45 |
Rev Time |
0.00 |
Received By |
cpuell |
Date |
2021-09-16 |
Time |
15:45 |
Sent To |
|
|
Notes |
2021-09-16 15:46:57 | THERE IS NO SUITE 601 ON 851 VILLAGE BLVD, SUITE 601 | | HAS AN ADDRESS OF 871 VILLAGE BLVD # 601, PLEASE | | CONFIRM TO [email protected] OR CALL 561-805-6659 |
|
|
Review Stop |
ASBESTOS |
CONFIRM RPT SENT TO PBC HEALTH |
Rev No |
4 |
Status |
F |
Date |
2022-04-27 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2022-04-27 |
Time |
12:44 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2022-04-27 |
Time |
12:44 |
Sent To |
|
|
Notes |
2022-04-27 12:45:04 | PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE | | CONTRACTOR, ON LETTERHEAD, STATING THAT THE | | INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM | | COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH | | COUNTY WILL BE FOLLOWED, AND THAT NOTIFICATION WILL BE | | GIVEN TIMELY. | | | | ADDITIONAL INFORMATION REGARDING ASBESTOS REQUIREMENTS | | CAN BE FOUND ON THEIR WEBSITE: | | | | HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE | | S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION- | | RENOVATION.HTML | | |
|
|
Review Stop |
ASBESTOS |
CONFIRM RPT SENT TO PBC HEALTH |
Rev No |
3 |
Status |
F |
Date |
2021-12-09 |
|
|
Cont ID |
|
Sent By |
lmarchan |
Date |
2021-12-09 |
Time |
07:57 |
Rev Time |
0.00 |
Received By |
lmarchan |
Date |
2021-12-09 |
Time |
07:57 |
Sent To |
|
|
Notes |
2021-12-09 07:57:40 | PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE | | CONTRACTOR, ON LETTERHEAD, STATING THAT THE | | INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM | | COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH | | COUNTY WILL BE FOLLOWED, AND THAT NOTIFICATION WILL BE | | GIVEN TIMELY. | | | | ADDITIONAL INFORMATION REGARDING ASBESTOS REQUIREMENTS | | CAN BE FOUND ON THEIR WEBSITE: | | | | HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE | | S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION- | | RENOVATION.HTML | | |
|
|
Review Stop |
ASBESTOS |
CONFIRM RPT SENT TO PBC HEALTH |
Rev No |
2 |
Status |
F |
Date |
2021-11-15 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2021-11-15 |
Time |
13:29 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2021-11-15 |
Time |
13:29 |
Sent To |
|
|
Notes |
2021-11-15 13:31:09 | PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE | | CONTRACTOR, ON LETTERHEAD, STATING THAT THE | | INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM | | COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH | | COUNTY WILL BE FOLLOWED, AND THAT NOTIFICATION WILL BE | | GIVEN TIMELY. | | | | ADDITIONAL INFORMATION REGARDING ASBESTOS REQUIREMENTS | | CAN BE FOUND ON THEIR WEBSITE: | | | | HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE | | S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION- | | RENOVATION.HTML | | |
|
|
Review Stop |
ASBESTOS |
CONFIRM RPT SENT TO PBC HEALTH |
Rev No |
1 |
Status |
F |
Date |
2021-10-20 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2021-10-20 |
Time |
14:32 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2021-10-20 |
Time |
14:32 |
Sent To |
|
|
Notes |
2021-10-20 14:32:38 | PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE | | CONTRACTOR, ON LETTERHEAD, STATING THAT THE | | INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM | | COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH | | COUNTY WILL BE FOLLOWED, AND THAT NOTIFICATION WILL BE | | GIVEN TIMELY. | | | | ADDITIONAL INFORMATION REGARDING ASBESTOS REQUIREMENTS | | CAN BE FOUND ON THEIR WEBSITE: | | | | HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE | | S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION- | | RENOVATION.HTML | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
P |
Date |
2022-04-27 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2022-04-27 |
Time |
12:42 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2022-04-27 |
Time |
12:42 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
P |
Date |
2021-11-15 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2021-11-15 |
Time |
13:27 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2021-11-15 |
Time |
13:27 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2021-10-20 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2021-10-20 |
Time |
14:51 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2021-10-20 |
Time |
14:32 |
Sent To |
|
|
Notes |
2021-10-20 14:38:13 | INTERIOR ALTERATION | | REVIEWED BY ROGER MCPHERSON | | 561-805-6716 | | [email protected] | | CODE USED FOR REVIEW - 2020 FBC WITH 2017 WPB CHAPTER 1 | | AMENDMENT | | | | CORRECTIONS NEEDED - | | 1) PLEASE SHOW THE BUILDING CONSTRUCTION TYPE - FBC | | 602.1 | | 2) ADDRESS SHOWN ON THE PLANS SHOULD MATCH THE ADDRESS | | SHOWN ON THE BUILDING PERMIT APPLICATION. | | |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
P |
Date |
2022-05-17 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2022-05-17 |
Time |
07:15 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2022-05-16 |
Time |
16:42 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2021-10-14 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2021-10-14 |
Time |
13:05 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2021-10-01 |
Time |
10:07 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E-LOWVOLT |
ELECTRICAL LOW VOLTAGE |
Rev No |
1 |
Status |
P |
Date |
2022-05-17 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2022-05-17 |
Time |
07:15 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2022-05-17 |
Time |
07:15 |
Sent To |
|
|
Notes |
2022-05-17 07:16:25 | VOICE DATA AND TV JLEAHY |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
3 |
Status |
P |
Date |
2022-04-26 |
|
|
Cont ID |
|
Sent By |
cwalker |
Date |
2022-04-26 |
Time |
|
Rev Time |
0.00 |
Received By |
cwalker |
Date |
|
Time |
|
Sent To |
|
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
2 |
Status |
P |
Date |
2021-11-12 |
|
|
Cont ID |
|
Sent By |
cwalker |
Date |
2021-11-12 |
Time |
|
Rev Time |
0.00 |
Received By |
cwalker |
Date |
|
Time |
|
Sent To |
|
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
1 |
Status |
P |
Date |
2021-10-06 |
|
|
Cont ID |
|
Sent By |
cwalker |
Date |
2021-10-06 |
Time |
|
Rev Time |
|
Received By |
cwalker |
Date |
|
Time |
|
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
4 |
Status |
N |
Date |
2022-05-17 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2022-05-17 |
Time |
07:34 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2022-04-25 |
Time |
07:54 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2021-12-09 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2021-12-09 |
Time |
10:23 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2021-12-08 |
Time |
11:13 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2021-11-17 |
|
|
Cont ID |
|
Sent By |
lcrespo |
Date |
2021-11-17 |
Time |
15:33 |
Rev Time |
0.00 |
Received By |
lcrespo |
Date |
2021-11-10 |
Time |
16:31 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2021-10-21 |
|
|
Cont ID |
|
Sent By |
lcrespo |
Date |
2021-10-21 |
Time |
08:10 |
Rev Time |
0.00 |
Received By |
lcrespo |
Date |
2021-10-05 |
Time |
08:15 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
2 |
Status |
P |
Date |
2021-11-12 |
|
|
Cont ID |
|
Sent By |
medwards |
Date |
2021-11-12 |
Time |
09:17 |
Rev Time |
0.00 |
Received By |
medwards |
Date |
2021-11-12 |
Time |
09:04 |
Sent To |
|
|
Notes |
2021-11-12 09:19:14 | APPROVED WITH PROVISO: | | THE SAUNA INSTALLATION INSTRUCTIONS SHALL BE PRESENTED | | AT THE JOB SITE TO THE INSPECTOR ONCE CHOSEN PER THE | | RESPONSE LETTER FROM THE DESIGNER. ME | | |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
1 |
Status |
F |
Date |
2021-10-21 |
|
|
Cont ID |
|
Sent By |
hmoser |
Date |
2021-10-06 |
Time |
13:39 |
Rev Time |
0.00 |
Received By |
hmoser |
Date |
2021-10-06 |
Time |
12:25 |
Sent To |
|
|
Notes |
2021-10-21 07:05:01 | PLAN DENIED | | PLEASE PROVIDE MANUFACTURE INSTALLATION INSTRUCTIONS ON | | SAUNA. | | SECTION 107 FBC 2020 | | PLAN REVIEW BY HAROLD MOSER | | [email protected] | | OFFICE 561-805-6732 | | FAX 561-805-6676 |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
3 |
Status |
P |
Date |
2022-04-27 |
|
|
Cont ID |
|
Sent By |
lcrespo |
Date |
2022-04-27 |
Time |
10:34 |
Rev Time |
0.00 |
Received By |
lcrespo |
Date |
2022-04-27 |
Time |
10:33 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
P |
Date |
2021-11-17 |
|
|
Cont ID |
|
Sent By |
lcrespo |
Date |
2021-11-17 |
Time |
15:33 |
Rev Time |
0.00 |
Received By |
lcrespo |
Date |
2021-11-17 |
Time |
10:12 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
F |
Date |
2021-10-21 |
|
|
Cont ID |
|
Sent By |
lcrespo |
Date |
2021-10-21 |
Time |
08:09 |
Rev Time |
0.00 |
Received By |
lcrespo |
Date |
2021-10-20 |
Time |
11:19 |
Sent To |
|
|
Notes |
2021-10-21 08:09:24 | 10/21/21 1ST PLUMBING REVIEW**DENIED** WITH COMMENTS | | | | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS | | TIME, AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE | | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. | | | | 1. ON SHEET A1.0 | | | | A. IN THE BREAK ROOM 111 AND THE GALLERY AREA 115 SHOWS | | A SINK, WOULD YOU PLEASE GIVE THE DIMESONS 30 INCHES BY | | 48 INCHES PER THE 2020 FBC ACC SEC. 305 CLEAR FLOOR OR | | GROUND SPACE. | | | | B. THERE IS AN ELEVATION OF THE BREAK ROOM 110 A-1, BUT | | THE ELEVATION SHOWS THE COUNTER TO AT THREE FEET INCHES | | MAXIMUM AND IT NEEDS TO BE AT 2 FEET 10 INCHES PER THE | | 2020 FBC ACC SEC. 606.3. | | | | C. THE SINK IN THE GALLERY SHOWS A CLEAR FLOOR SPACE | | BUT NO DETAIL FOR THE COUNTER HEIGHT; THIS SHOULD BE AT | | 34 INCHES MAXIMUM PER THE 2020 FBC ACC SEC. 606.3. | | WOULD YOU PLEASE PROVIDE DETAIL ON THIS PAGE OR GIVE A | | REFERENCE PER THE WPB AMENDMENTS TO THE FBC SEC. | | 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS. | | | | D. THERE IS A SAUNA IN ROOM 110, AND MECHANICAL IS | | REQUESTING MANUFACTURERS SPECIFICATION. PLEASE PROVIDE | | INFORMATION IF IT IS A STEAM UNIT AND NEEDS HOT WATER | | OR A DRAIN PER THE WPB AMENDMENTS TO THE FBC SEC | | 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS. | | | | | | 2. ON SHEET P01; | | | | A. IT SHOWS SANITARY ON THE FLOOR. WOULD YOU PLEASE | | SUBMIT A SLAB REPAIR DETAIL FOR REVIEW? SHOW THE WIDTH | | OF THE REPAIR, THE MINIMUM THICKNESS OF THE CONCRETE TO | | BE REPLACED, AND THE PSI OF THE CONCRETE. SHOW THE SIZE | | AND LENGTH OF THE DOWELS, THE MINIMUM EMBEDMENT DEPTH | | INTO THE EXISTING SLAB, AND THE SPACING OF THE DOWELS | | IN THE CENTER. THE REPAIR MAY ALSO INCLUDE TERMITE | | TREATMENT OF THE SOIL AND THE REQUIRED VAPOR BARRIER | | OVER THE EARTH. A COPY OF THE TERMITE CERTIFICATE SHALL | | BE ONSITE FOR A FINAL INSPECTION IF APPLICABLE. | | | | B. IT SHOWS A WASHING MACHINE THAT WILL REQUIRE A LINT | | TRAP; PLEASE SUPPLY DETAILS OR NOTES PER THE 2020 FBC | | SEC. 1003.6. A MODEL HLT-1176 IS USED A LOT IN OUR | | MUNICIPALITY, AND YOU ARE WELCOME TO USE THIS ONE OR | | ONE SIMILAR. HTTPS://STRIEMCO.COM/WP-CONTENT/UPLOADS/20 | | 20/03/6010-6025-001-01-HLT-HLB.PDF . | | | | C. THE SERVICE SINK (MOP SINK) SURROUNDING THE WALL | | SHALL BE A NON-ABSORBENT SURFACE IN ACCORDANCE WITH THE | | 2020 FBC BUILDING SEC. 1210.2.2 AND 2020 FBC SEC. P | | 310.3. WOULD YOU PLEASE MAKE A NOTE ON THIS SHEET? | | | | 3. ON SHEET P02; | | | | A. WOULD YOU PLEASE SHOW THE COLD WATER FOR THE | | RESTROOMS AND THE WATER FOUNTAIN PER THE WPB AMENDMENTS | | TO THE FBC SEC. 107.2.1 INFORMATION ON CONSTRUCTION | | DOCUMENTS. IF COLD WATER EXISTS, PLEASE SHOW AND LABEL | | IT. | | | | B. WOULD YOU PLEASE SHOW THE HAMMER ARRESTORS ON THE | | WASHING MACHINE PER THE 2020 FBC P 604.9. | | | | C. WOULD YOU PLEASE PUT A NOTE NEXT TO THE WATER HEATER | | FOR DETAIL ON SHEET P-4 PER THE WPB AMENDMENTS TO THE | | FBC SEC. 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS. | | | | D. THERE ARE HOT WATER LINES IN THE GROUND AND NOT IN | | CONDITION SPACE, SO THEY NEED TO BE INSULATED WITH A | | MINIMUM R-3 PER THE 2020 FBC SEC. RE 403.5.3. | | | | E. THE WATER LINES TO THE SINK IN THE GALLERY FOR THE | | RECIRCULATING MANIFOLD OF THE HOT WATER LINES SHALL BE | | SUPPLIED TO THE SOURCE; PLEASE REFER TO THE 2020 FBC | | ENERGY CODE TABLE C404.5.1. MAXIMUM ALLOWABLE PIPE | | LENGTH METHOD. | | | | F. RECIRCULATING SYSTEM, THE PIPING SHALL BE INSULATED | | IN ITS ENTIRETY, INCLUDING THE SUPPLY AND RETURN PIPING | | OF A CIRCULATING WITH A MIN 1-INCH-THICK PER C404.4 (A) | | INSULATION OF PIPING. | | | | G. ON A GENERAL NOTE, # 3 REFERS TO MIAMI DADE. WOULD | | YOU PLEASE DELETE PER THE WPB AMENDMENTS TO THE FBC | | SEC.107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS? | | | | H. WOULD YOU, PLEASE SHOW THE SOURCE LOCATION OF THE | | WATER SERVICE WITH A FULL OPEN VALVE AND A BACKFLOW | | DEVICE INTO THE BUILDING AS REQUIRED PER THE 2020 FBC | | SEC. 606.1 (2) LOCATION OF FULL-OPEN VALVES AND 608.1 | | GENERAL. | | | | 4. ON SHEET P04; | | | | A. FOR DETAIL P13, WOULD YOU PLEASE SHOW THE RELIEF | | LINE DUMPING NOT MORE THAN 6 INCHES ABOVE AND NOT LESS | | THAN TWO TIMES THE DISCHARGE PIPE DIAMETER ABOVE THE | | FLOOR OR FLOOD LEVEL RIM OF THE WASTE RECEPTOR OR INTO | | THE DRAIN PAN SERVING TANK PER THE 2020 FBC SEC P | | 504.6. | | | | WHEN RESUBMITTING PLANS, PLEASE INDICATE THE REVISION & | | REMOVE ANY VOIDED SHEETS & REPLACE ANY NECESSARY PAGES. | | A TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW | | COMMENT NUMBER, WITH A DESCRIPTION OF THE REVISION | | MADE, IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE | | THE CHANGES CAN BE FOUND, WILL HELP EXPEDITE YOUR | | PERMIT. THANK YOU FOR YOUR ANTICIPATED COOPERATION. | | | | HTTPS://CODES.ICCSAFE.ORG/CODES/FLORIDA | | | | LUIS A. CRESPO | | PLUMBING PLAN EXAMINER / INSPECTOR | | EMAIL: [email protected] OFFICE: 561 805-6720 | | |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
4 |
Status |
F |
Date |
2022-04-27 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2022-04-27 |
Time |
12:40 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2022-04-27 |
Time |
12:40 |
Sent To |
|
|
Notes |
2022-04-27 12:42:17 | SIGNATURE REVIEW | | | | DRAWINGS IN THE SIGNATURES FOLDER IN PROJECTDOX A-2.0, | | A-2.1, A-30, AD-1, E01, E02, E03, E04, FP01, FP02, M01, | | M02, M03, P01, P03 DO NOT SHOW AS DIGITALLY SIGNED IN | | ADOBE READER - | | | | SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE | | DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR | | ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW. (A | | CERTIFICATE-BASED DIGITAL SIGNATURE (OFTEN JUST CALLED | | A DIGITAL SIGNATURE) IS A SPECIFIC TYPE OF | | E-SIGNATURE).- OR - IF YOUR ARCHITECT OR ENGINEER DOES | | NOT HAVE AN ELECTRONIC OR DIGITAL SIGNATURE - YOU CAN | | DROP OFF THE ORIGINAL SIGNED AND SEALED | | DRAWINGS/DOCUMENTS TO THE FRONT DESK IN THE BUILDING | | DIVISION AT THE CITY HALL. | | | | REVIEWED BY ROGER MCPHERSON | | 561-805-6716 | | [email protected] | | |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
3 |
Status |
F |
Date |
2021-12-09 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2021-12-09 |
Time |
10:19 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2021-12-09 |
Time |
10:19 |
Sent To |
|
|
Notes |
2021-12-09 10:23:17 | SIGNATURE REVIEW | | | | DRAWINGS A-2.0, A-2.1, A-30, AD-1, E01, E02, E03, E04, | | FP01, FP02, M01, M02, M03, P01, P03 DO NOT SHOW AS | | DIGITALLY SIGNED IN ADOBE READER - | | | | SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE | | DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR | | ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW. (A | | CERTIFICATE-BASED DIGITAL SIGNATURE (OFTEN JUST CALLED | | A DIGITAL SIGNATURE) IS A SPECIFIC TYPE OF | | E-SIGNATURE).- OR - IF YOUR ARCHITECT OR ENGINEER DOES | | NOT HAVE AN ELECTRONIC OR DIGITAL SIGNATURE - YOU CAN | | DROP OFF THE ORIGINAL SIGNED AND SEALED | | DRAWINGS/DOCUMENTS TO THE FRONT DESK IN THE BUILDING | | DIVISION AT THE CITY HALL. | | | | REVIEWED BY ROGER MCPHERSON | | 561-805-6716 | | [email protected] | | |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
2 |
Status |
F |
Date |
2021-11-15 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2021-11-15 |
Time |
13:26 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2021-11-15 |
Time |
13:26 |
Sent To |
|
|
Notes |
2021-11-15 13:27:02 | SIGNATURE REVIEW | | | | ALL OF THE DRAWINGS DO NOT SHOW AS DIGITALLY SIGNED IN | | ADOBE READER - | | | | SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE | | DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR | | ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW. (A | | CERTIFICATE-BASED DIGITAL SIGNATURE (OFTEN JUST CALLED | | A DIGITAL SIGNATURE) IS A SPECIFIC TYPE OF | | E-SIGNATURE).- OR - IF YOUR ARCHITECT OR ENGINEER DOES | | NOT HAVE AN ELECTRONIC OR DIGITAL SIGNATURE - YOU CAN | | DROP OFF THE ORIGINAL SIGNED AND SEALED | | DRAWINGS/DOCUMENTS TO THE FRONT DESK IN THE BUILDING | | DIVISION AT THE CITY HALL. | | | | REVIEWED BY ROGER MCPHERSON | | 561-805-6716 | | [email protected] | | |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
F |
Date |
2021-10-20 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2021-10-20 |
Time |
14:51 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2021-10-20 |
Time |
14:51 |
Sent To |
|
|
Notes |
2021-10-20 14:53:23 | SIGNATURE REVIEW | | | | ALL OF THE DRAWINGS DO NOT SHOW AS DIGITALLY SIGNED IN | | ADOBE READER - SIGNED AND SEALED DRAWINGS IN PROJECTDOX | | NEED TO BE DIGITALLY/ELECTRONICALLY SIGNED BY THE | | ENGINEER OR ARCHITECT TO BE USED IN ELECTRONIC PLAN | | REVIEW. (A CERTIFICATE-BASED DIGITAL SIGNATURE (OFTEN | | JUST CALLED A DIGITAL SIGNATURE) IS A SPECIFIC TYPE OF | | E-SIGNATURE).- OR - IF YOUR ARCHITECT OR ENGINEER DOES | | NOT HAVE AN ELECTRONIC OR DIGITAL SIGNATURE - YOU CAN | | DROP OFF THE ORIGINAL SIGNED AND SEALED | | DRAWINGS/DOCUMENTS TO THE FRONT DESK IN THE BUILDING | | DIVISION AT THE CITY HALL. | | | | REVIEWED BY ROGER MCPHERSON | | 561-805-6716 | | [email protected] | | |
|
|