Plan Review Details - Permit 21090210
Plan Review Stops For Permit 21090210
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2022-01-03 Cont ID  
Sent By rmcdouga Date 2022-01-03 Time 14:35 Rev Time 0.00
Received By rmcdouga Date 2022-01-03 Time 14:35 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2022-01-03 Cont ID  
Sent By rmcdouga Date 2022-01-03 Time 09:56 Rev Time 0.00
Received By rmcdouga Date 2022-01-03 Time 09:55 Sent To  
Notes
2022-01-03 14:09:07CONTRACTOR CALLED AND SAID THAT THERE IS ONLY ONE
 BATHROOM IN THE HOUSE AND TWO ARE SHOWN ON THE FLOOR
 PLAN.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2021-12-21 Cont ID  
Sent By rmcdouga Date 2021-12-21 Time 10:33 Rev Time 0.00
Received By rmcdouga Date 2021-12-21 Time 10:33 Sent To  
Notes
2021-12-21 10:39:12PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC SEVENTH EDITION (2020)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) SUBMIT A FLOOR PLAN OF THE HOUSE. INDICATE THE
 AREAS/ROOMS OF THE HOUSE IN WHICH THE PROPOSED WORK
 WILL TAKE PLACE. THE ADDRESS OF THE HOUSE AND THE NAME
 AND SIGNATURE OF THE RESPONSIBLE PERSON NEEDS TO BE ON
 THE DRAWING. FBC AMENDMENTS 107.2.1
  
 2) PROVIDE A COMPLETE SCOPE OF THE WORK THAT WILL BE
 DONE. FBC AMENDMENTS 107.2.1
  

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2021-11-16 Cont ID  
Sent By jleahy Date 2021-11-16 Time 14:18 Rev Time 0.00
Received By jleahy Date 2021-11-16 Time 14:15 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2022-01-03 Cont ID  
Sent By rmcdouga Date 2022-01-03 Time 09:56 Rev Time 0.00
Received By rmcdouga Date 2021-12-28 Time 07:23 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2021-12-21 Cont ID  
Sent By rmcdouga Date 2021-12-21 Time 10:39 Rev Time 0.00
Received By rmcdouga Date 2021-10-28 Time 10:18 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2021-10-26 Cont ID  
Sent By aoliver Date 2021-10-26 Time 13:51 Rev Time 0.00
Received By aoliver Date 2021-10-26 Time 13:35 Sent To  
Notes
2021-10-26 13:53:37REMOVED FROM REVIEW. ROUTED TO DB W QUESTIONS REGARDING
 PLMB SUB THAT WAS GENERATED AS PLMB PERMIT AND CHARGED
 A FEE AO

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2021-12-29 Cont ID  
Sent By medwards Date 2021-12-29 Time 07:15 Rev Time 0.00
Received By medwards Date 2021-12-29 Time 07:15 Sent To  
Notes
2021-12-29 07:18:04NEW BATH EXHAUST AND NEW DRYER EXHAUST. ME

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2021-10-29 Cont ID  
Sent By medwards Date 2021-10-29 Time 07:30 Rev Time 0.00
Received By medwards Date 2021-10-29 Time 07:30 Sent To  
Notes
2021-10-29 07:32:34PLEASE PROVIDE A SCOPE OF WORK FOR THE MECHANICAL
 SYSTEM. THE ELECTRICAL DRAWING SHOWS A HOOD ABOVE THE
 RANGE. IS THIS HOOD VENTED TO THE OUTDOORS? WHAT IS THE
 CFM'S OF THE HOOD EXHAUST IF IT IS VENTED TO THE
 OUTDOORS? FBC RES M1503.4
  
 MICHAEL EDWARDS
 MECHANICAL EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL. 33401
 561-805-6728
 [email protected]
  
  
  

Review Stop P PLUMBING
Rev No 1 Status P Date 2021-11-02 Cont ID  
Sent By lcrespo Date 2021-11-02 Time 11:07 Rev Time 0.00
Received By lcrespo Date 2021-11-02 Time 10:46 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status N Date 2021-10-28 Cont ID  
Sent By mpeterso Date 2021-10-28 Time 11:17 Rev Time 0.00
Received By mpeterso Date 2021-10-28 Time 11:17 Sent To  
Notes
2021-10-28 11:18:41OWNER BUILDER/CONTRACTOR DRAWINGS SIGNATURE NOT
 REQUIRED


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved