Plan Review Details - Permit 21090139
Plan Review Stops For Permit 21090139
Review Stop AD ADDRESSING
Rev No 1 Status P Date 2021-09-16 Cont ID  
Sent By cpuell Date 2021-09-16 Time 16:08 Rev Time 0.00
Received By cpuell Date 2021-09-16 Time 16:08 Sent To  
Notes
2021-09-16 16:09:06NEW BUILDING WITHIN ADDRESS RANGE.

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2021-11-06 Cont ID  
Sent By cthroop Date 2021-11-06 Time 08:37 Rev Time 0.00
Received By cthroop Date 2021-11-06 Time 08:26 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2021-09-30 Cont ID  
Sent By cthroop Date 2021-09-30 Time 15:29 Rev Time 0.00
Received By cthroop Date 2021-09-29 Time 13:07 Sent To  
Notes
2021-09-30 15:33:57BUILDING PLAN REVIEW
  
 CHRISTOPHER S. THROOP, C.B.O., CFM
 PLANS EXAMINER II PX3169/SFP306
 INSPECTOR BN4338
 BUILDING OFFICIAL BU1635
 ASFPM CERTIFIED FLOODPLAIN MANAGER US-21-11935
 DEVELOPMENT SERVICES DEPARTMENT
 CITY OF WEST PALM BEACH
 (561) 805-6726
 [email protected]
  
 CODES IN EFFECT:
 2020 FLORIDA BUILDING CODE, 7TH EDITION W/2017 WEST
 PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE,
 CHAPTER 1 ADMINISTRATION
 2017 NEC
  
 1ST REVIEW
  
 RESULTS: DENIED
 ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT
  
 1. PROVIDE A COPY OF THE CURRENT BOUNDRY LINE SURVEY.
 107.2 CONSTRUCTION DOCUMENTS. CONSTRUCTION DOCUMENTS
 SHALL BE IN ACCORDANCE WITH SECTIONS107.2.1 THROUGH
 107.2.5.
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2021-09-28 Cont ID  
Sent By jleahy Date 2021-09-28 Time 11:37 Rev Time 0.00
Received By jleahy Date 2021-09-28 Time 11:37 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 2 Status P Date 2021-10-25 Cont ID  
Sent By lcrespo Date 2021-10-25 Time 07:55 Rev Time 0.00
Received By lcrespo Date 2021-10-25 Time 07:55 Sent To  
Notes
2021-10-25 07:55:2610/25/21 REVIEWED FOR CODE COMPLIANCE (GAS)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS, OR THEIR REPRESENTATIVES
 FROM THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL,
 STATE, AND NATIONAL CODES AND STANDARDS IN EFFECT AT
 THE TIME OF PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK
 OF EVERY ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2021-09-23 Cont ID  
Sent By lcrespo Date 2021-09-23 Time 12:56 Rev Time 0.00
Received By lcrespo Date 2021-09-23 Time 12:56 Sent To  
Notes
2021-09-23 13:31:1609/23/21 1 ST GAS REVIEW**DENIED** WITH COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME, AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. WOULD YOU PLEASE SUBMIT AN ISOMETRIC DRAWING THAT
 CLEARLY SHOWS THE LENGTH OF ALL CUT SECTIONS OF PIPE
 PER 2020 FBC RES. SECS. G2413.4.1, G2413.4.2.
  
 2. LIST THE BTU LOAD OF EACH APPLIANCE AND THE TOTAL
 BTU LOAD ON THE SYSTEM. REFER TO THE 2020 FBC RES. SEC.
 G2413.
  
 3. MOST TANKLESS UNITS CALL FOR A 10.5" WATER COLUMN,
 AND THE SERVICE METER DISCHARGES IS A 12" WATER COLUMN
 REQUIRING A REGULATOR FOR THIS UNIT AS PER THE
 MANUFACTURER'S SPECIFICATION. SUBMIT MANUFACTURER'S
 SPECIFICATIONS FOR THE PRESSURE REGULATORS. REGULATORS
 INSTALLED ON THE EXTERIOR OF THE BUILDING SHALL BE
 APPROVED FOR OUTDOOR INSTALLATION PER THE 2020 FBC RES.
 SEC. G2421.1.
  
 4. WOULD YOU PLEASE PROVIDE MANUFACTURES SPECIFICATIONS
 FOR ALL GAS EQUIPMENT PER THE WPB AMENDMENTS TO THE FBC
 SEC. 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS.
  
 5. WOULD YOU PLEASE SHOW ON PLANS THE LOCATION OF THE
 TANK-LESS WATER HEATER AND THE LOCATION AND DISTANCE OF
 ANY OPERABLE DOORS OR WINDOWS IN RELATION TO THE WATER
 HEATER? THE LOCATION OF THE WATER HEATER SHALL COMPLY
 WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. THE
 HOUSE PLAN CAN BE HAND-DRAWN PER THE WPB AMENDMENTS TO
 THE FBC SEC. 107.2.1. INFORMATION ON CONSTRUCTION
 DOCUMENTS.
  
 6. GAS UNITS MAY REQUIRE CONDENSATE, AND THEY NEED TO
 BE 1' AWAY FROM THE STRUCTURE PER THE 2020 FBC SEC
 R318.5. A NOTE ON ISO WILL BE OK.
  
 7. HOT WATER LINES NOT IN CONDITION SPACE NEED TO BE
 INSULATED WITH A MINIMUM R-3 PER THE 2020 FBC SEC. RE
 403.5.3. A NOTE ON ISO WILL BE OK.
  
 8. THE GRILL SEEMS TO BE IN A COVERED PATIO; IF SO,
 PLEASE PROVIDE THE MANUFACTURER'S RECOMMENDATION FOR A
 VENTILATION HOOD PER THE 2020 FBC RES. SEC. G2408.1.
 THE GRILL MAY REQUIRE A VENT IF IN THE CABINET.
  
 9. WOULD YOU PLEASE LABEL AND SHOW ALL UNIONS IN FRONT
 OF REGULATOR 1' OF EITHER SIDE PER THE 2020 FBC RES.
 SEC G2421.2.
  
 10. WOULD YOU PLEASE LABEL THE SHUTOFF VALVE ON GAS
 ISOMERIC PER THE 2020 FBC FG SEC. 409.5 OR 2020 FBC
 RES. SEC. G2420.5.
  
 11. THE SHUT-OFF INSIDE SHALL BE ACCESSIBLE WITHOUT
 MOVING THE EQUIPMENT PER THE 2020 FBC SEC. G2403 (202)
 GD, ACCESS. A NOTE ON ISO WILL BE OK.
  
 12. DRIP LEG ON EQUIPMENT IS SHOWN INSTALLED
 INCCORECTLY. WOULD YOU PLEASE REFER TO THE 2020 FBC R
 FIGURE G2419.4 (408.4) METHOD OF INSTALLING A TEE
 FITTING SEDIMENT TRAP
  
 13. SUBMIT CALCULATIONS FOR COMBUSTION AIR PER THE 2020
 FBC RES. SEC. G2407.1 AND G2439.4 (CLOTHES DRYERS).
  
 14. IF USING LOVERS FOR COMBUSTION AIR, PLEASE SHOW THE
 LOCATION OF THE LOUVERS THAT ARE BEING INSTALLED. THE
 LOUVERS CANNOT BE LOCATED ON AN EXTERIOR WALL THAT IS
 FIRE RATED AS THE FIRE RATING OF THE WALL MUST BE
 MAINTAINED PER THE WPB AMENDMENTS TO FBC SEC.107.2.1.
  
 15. GAS APPLIANCES SHALL BE LISTED AND LABELED. THE
 INSTALLATION MANUALS FOR ALL GAS APPLIANCES/EQUIPMENT
 SHALL BE ONSITE AT THE TIME OF INSPECTION PER THE FBC
 RES. SEC. G2413.2 AND G2404.3.
  
 16. WOULD YOU PLEASE PROVIDE THE TABLE USED IN THE
 DESIGN FOR THE GAS SYSTEM OR PLACE A NOTE ON BOTH SETS
 OF PLANS LISTING THE SIZING TABLES FROM GAS CODES OR
 ANOTHER STANDARD USED IN THE DESIGN OF THIS SYSTEM PER
 THE 2020 FBC RES. SEC. G2413.3.
  
 WHEN RESUBMITTING PLANS, PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY NECESSARY PAGES.
 A TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW
 COMMENT NUMBER, WITH A DESCRIPTION OF THE REVISION
 MADE, IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE
 THE CHANGES CAN BE FOUND, WILL HELP EXPEDITE YOUR
 PERMIT. THANK YOU FOR YOUR ANTICIPATED COOPERATION.
  
 HTTPS://CODES.ICCSAFE.ORG/CODES/FLORIDA
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2021-11-19 Cont ID  
Sent By lmarchan Date 2021-11-19 Time 10:10 Rev Time 0.00
Received By lmarchan Date 2021-11-09 Time 15:02 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2021-11-06 Cont ID  
Sent By cthroop Date 2021-11-06 Time 08:37 Rev Time 0.00
Received By cthroop Date 2021-10-20 Time 10:23 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2021-09-30 Cont ID  
Sent By cthroop Date 2021-09-30 Time 15:44 Rev Time 0.00
Received By cthroop Date 2021-09-15 Time 12:59 Sent To  
Notes
***NONE***

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 2 Status P Date 2021-11-30 Cont ID  
Sent By lmarchan Date 2021-11-30 Time 09:47 Rev Time 0.00
Received By lmarchan Date 2021-11-19 Time 10:19 Sent To  
Notes
2021-11-29 11:12:00RECEIPT - MU-2021-055436 - $2404.37 PAID
2021-11-19 10:19:3011/19/21 EMAILED IMPACT OFFICE FOR REVIEW. LEM

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 1 Status F Date 2021-09-30 Cont ID  
Sent By cthroop Date 2021-09-30 Time 13:54 Rev Time 0.00
Received By cthroop Date 2021-09-30 Time 13:54 Sent To  
Notes
2021-09-30 13:55:45IMPACT FEE QUESTIONNAIRE
  
 PALM BEACH COUNTY IMPACT FEES - DIGITAL SUBMITTALS
  
 PLANS WILL BE REVIEWED BY THE PBC IMPACT FEE OFFICE
 DIGITALLY VIA PROJECT DOX UPON NOTIFICATION BY THIS
 OFFICE. NOTIFICATION MAY OCCUR WHEN PLANS ARE NEAREST
 FINAL FORM. YOU MAY COORDINATE WITH THE IMPACT FEE
 OFFICE AT (561) 233-5025 OR SIMPLY UPLOAD THE MUNICIPAL
 IMPACT FEE QUESTIONNAIRE FORM TO YOUR PROJECT AND NAME
 THE FILE MUNICIPAL IMPACT FEE QUESTIONNAIRE. OUR PERMIT
 LIBRARIANS WILL SEND THE IMPACT FEE QUESTIONNAIRE TO
 THE PALM BEACH COUNTY IMPACT FEE OFFICE ON YOUR BEHALF.
 THE FORM CAN BE FOUND AT: HTTP://DISCOVER.PBCGOV.ORG/PZ
 B/ADMINISTRATION/PDF/IMPACTFEES/FORMS/QUESTIONNAIRE.PDF
 UPON APPROVAL AND PAYMENT OF FEES, PLEASE UPLOAD THE
 RECEIPT TO PROJECT DOX OR EMAIL IT TO
 [email protected]
  
  

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2021-09-23 Cont ID  
Sent By medwards Date 2021-09-23 Time 08:48 Rev Time 0.00
Received By medwards Date 2021-09-23 Time 08:47 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status P Date 2021-10-25 Cont ID  
Sent By lcrespo Date 2021-10-25 Time 07:54 Rev Time 0.00
Received By lcrespo Date 2021-10-25 Time 07:54 Sent To  
Notes
2021-10-25 07:56:0610/25/21 REVIEWED FOR CODE COMPLIANCE (PLUMBING)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS, OR THEIR REPRESENTATIVES
 FROM THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL,
 STATE, AND NATIONAL CODES AND STANDARDS IN EFFECT AT
 THE TIME OF PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK
 OF EVERY ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2021-09-23 Cont ID  
Sent By lcrespo Date 2021-09-23 Time 12:54 Rev Time 0.00
Received By lcrespo Date 2021-09-23 Time 10:13 Sent To  
Notes
2021-09-23 12:55:2709/23/21 1ST PLUMBING REVIEW**DENIED** WITH COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME, AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. ON SHEET P1.1, THE SANITARY LINES ARE SHOWN COMING
 IN AT DIFFERENT POINTS, WHICH CONSTRUED A NEW SYSTEM AT
 EACH ENTRY. AS IT ENTERS THE BUILDING, IT IS CONSIDERED
 A BUILDING DRAIN THAT REQUIRES A VENT THROUGH THE ROOF
 AND CLEAN-OUT FOR EACH SYSTEM. YOU MAY MINIMIZE THIS BY
 DOING TWO, ONE ON EACH SIDE. WOULD YOU PLEASE REFER TO
 THE FOLLOWING 2020 FBC R P3005.2.3 BUILDING DRAIN AND
 BUILDING SEWER JUNCTION AND R3102.1 REQUIRED VENT
 EXTENSION, THE VENT SYSTEM SERVING EACH BUILDING DRAIN
 SHALL HAVE NOT LESS THAN ONE VENT PIPE; THAT EXTENDS TO
 THE OUTDOORS?
  
 2. ON SHEET P1.2;
 A. THERE IS A WATER FEATURE IN THE COURTYARD. WOULD YOU
 PLEASE PROVIDE A DETAIL AND BACKFLOW DEVICE BEING USED
 UNDER THE PLUMBING FIXTURE CONNECTION SCHEDULE ON PAGE
 P1.0 PER THE WPB AMENDMENTS TO THE FBC SEC. 107.3.5.3
 (12) RESIDENTIAL PLUMBING.
  
 B. THERE IS A BACKFLOW DEVICE AT THE METER THAT
 PROTECTS THE CITY OF WEST PALM BEACH WITH THEIR
 UTILITIES DEPARTMENT; CROSS CONNECTION PROGRAM MAY NEED
 TO BE A REDUCED PRINCIPAL VACUUM BREAKER. THE SECOND
 BACKFLOW IS A PRESSURE VACUUM BREAKER AT THE METER, BUT
 K COPPER IS NOT ALLOWED ON THE SIDE FROM THE METER TO
 THE DEVICE, ONLY L COPPER. WOULD YOU PLEASE CONTACT
 THEM TO DETERMINE WHAT THE NEEDED AT 561-822-2240?
  
 C. A SEPARATE PERMIT IS REQUIRED FOR THE BACKFLOW
 DEVICES PER THE WPB AMENDMENTS TO FBC SEC. 105.1.
  
 D. HOT WATER LINES UNDER SLAB NOT IN CONDITION SPACE
 NEED TO BE INSULATED WITH A MINIMUM R-3 PER THE 2020
 FBC SEC. RE 403.5.3. PLEASE PLACE A NOTE.
  
 E. IF THE TANKLESS HAS A CONDENSATE, IT NEEDS TO BE 1'
 AWAY FROM THE STRUCTURE PER THE 2020 FBC SEC. R318.5.
  
 3. ON SHEET P1.4;
 A. ON THE ISOMETRIC FOR THE HOT WATER RECIRCULATING
 SYSTEM, THERE IS NO CONTINUOUS LOOP ON THE SYSTEM AS IT
 TEE?S OFF IN SEVERAL LOCATIONS. WOULD YOU PLEASE
 CORRECT PER THE WPB AMENDMENTS TO THE FBC SEC.107.2.1
 INFORMATION ON CONSTRUCTION DOCUMENTS.
  
 B. HOT WATER LINES OUTSIDE NOT IN CONDITION SPACE NEED
 TO BE INSULATED WITH A MINIMUM R-3 PER THE 2020 FBC
 SEC. RE 403.5.3.
  
 WHEN RESUBMITTING PLANS, PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY NECESSARY PAGES.
 A TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW
 COMMENT NUMBER, WITH A DESCRIPTION OF THE REVISION,
 MADE, IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE
 THE CHANGES CAN BE FOUND, WILL HELP EXPEDITE YOUR
 PERMIT. THANK YOU FOR YOUR ANTICIPATED COOPERATION.
  
 HTTPS://CODES.ICCSAFE.ORG/CODES/FLORIDA
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status P Date 2021-09-30 Cont ID  
Sent By cthroop Date 2021-09-30 Time 15:29 Rev Time 0.00
Received By cthroop Date 2021-09-29 Time 13:07 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status P Date 2021-11-10 Cont ID  
Sent By lcrespo Date 2021-11-10 Time 09:57 Rev Time 0.00
Received By lcrespo Date 2021-11-10 Time 09:57 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status F Date 2021-10-25 Cont ID  
Sent By mpeterso Date 2021-10-25 Time 14:49 Rev Time 0.00
Received By mpeterso Date 2021-10-25 Time 14:49 Sent To  
Notes
2021-10-25 14:51:32IT APPEARS PLANS TITLED "C1 AND C2" ARE STILL NOT
 DIGITALLY SIGNED AND SEALED. FOLLOW THE INSTRUSTIONS
 BELOW TO CORRECT THIS ISSUE.
  
 FS471/FS481 DOCUMENTS PREPARED BY AN ARCHITECT OR
 ENGINEER AND SUBMITTED FOR PUBLIC RECORD ARE TO BE
 SIGNED, SEALED, DATED ORIGINALS OR DIGITALLY SEALED AND
 SIGNED.
 EITHER UPLOAD A DIGITALLY OR ELECTRONICALLY SIGNED PLAN
 TO THE SIGNATURE FOLDER WITH YOUR RESUBMITTAL (IF
 APPLICABLE) AND COMPLETE THE UPLOAD TASK IN PROJECTDOX,
 OR YOU CAN SUBMIT ONE ORIGINAL SIGNED AND SEALED PAPER
 ORIGINAL WITH A WET SIGNATURE TO THE BUILDING DIVISION.
 SIGNATURE DOCUMENTS ARE TYPICALLY REVIEWED WITHIN TWO
 BUSINESS DAYS AFTER SUBMITTAL; DIGITALLY SIGNED
 DOCUMENTS ARE PREFERRED.
  
 PLEASE EMAIL [email protected] AND CC TO
 [email protected]
  
 MICHAEL PETERSON
 ELECTRICAL PLANS EXAMINER
 [email protected]
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2021-09-30 Cont ID  
Sent By cthroop Date 2021-09-30 Time 15:43 Rev Time 0.00
Received By cthroop Date 2021-09-30 Time 15:35 Sent To  
Notes
2021-09-30 15:44:07SIGNATURE REVIEW
  
 CHRISTOPHER S. THROOP, C.B.O., CFM
 PLANS EXAMINER II PX3169/SFP306
 INSPECTOR BN4338
 BUILDING OFFICIAL BU1635
 ASFPM CERTIFIED FLOODPLAIN MANAGER US-21-11935
 DEVELOPMENT SERVICES DEPARTMENT
 CITY OF WEST PALM BEACH
 (561) 805-6726
 [email protected]
  
 CODES IN EFFECT:
 2020 FLORIDA BUILDING CODE, 7TH EDITION W/2017 WEST
 PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE,
 CHAPTER 1 ADMINISTRATION
 NEC2017
  
 1ST REVIEW
 RESULTS: DENIED
  
 ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT
  
 RE: PLAN PAGES C1 AND C2
  
 1. DOCUMENTS PREPARED BY AN ARCHITECT OR ENGINEER AND
 SUBMITTED FOR PUBLIC RECORD ARE TO BE SIGNED, SEALED,
 DATED ORIGINALS. A SCAN OF A WET SEAL AND SIGNATURE OR
 DIGITAL SIGNATURE IS NOT CONSIDERED A DIGITAL
 SIGNATURE.
  
 2. EITHER UPLOAD A VALID DIGITALLY SIGNED DOCUMENT OR
 DROP OFF (OR MAIL) ONE PAPER ORIGINAL WITH AN ORIGINAL
 WET SEAL AND SIGNATURE TO:
  
 BUILDING DIVISION, FIRST FLOOR
 CITY OF WEST PALM BEACH
 401 CLEMATIS ST
 WEST PALM BEACH, FL 33401
  
  

Review Stop Z ZONING
Rev No 3 Status P Date 2021-11-18 Cont ID  
Sent By eschneid Date 2021-11-18 Time 17:38 Rev Time 0.25
Received By eschneid Date 2021-11-18 Time 17:25 Sent To  
Notes
2021-11-18 17:34:22PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES OR
 PALMS, YOU MUST HAVE AN ISSUED TREE ALTERATION PERMIT.
  
 SEPARATE PERMITS, WITH PLANS, ARE REQUIRED FOR:
  
 A. DRIVEWAY/APPROACH
 B. IRRIGATION
 C. POOL, POOL EQUIPMENT, AND POOL DECK.
 D. FIRE PIT
 E. FENCES AND GATES
  
 CONTACT ERIC SCHNEIDER @ (561) 822-1446
 [email protected]
  

Review Stop Z ZONING
Rev No 2 Status F Date 2021-10-25 Cont ID  
Sent By eschneid Date 2021-10-25 Time 14:43 Rev Time 0.25
Received By eschneid Date 2021-10-25 Time 14:08 Sent To  
Notes
2021-10-25 14:44:18FAILED
  
 1) REPEAT COMMENT: ZONING WILL NOT APPROVE THIS PERMIT
 UNTIL YOU HAVE SUBMITTED A LANDSCAPE PERMIT. PLEASE
 NOTE: THAT PRIOR TO THE REMOVAL OR RELOCATION OF ANY
 TREES OR PALMS, YOU MUST HAVE AN ISSUED TREE ALTERATION
 PERMIT.
  
 SEPARATE PERMITS, WITH PLANS, ARE REQUIRED FOR:
  
 A. DRIVEWAY/APPROACH
 B. IRRIGATION
 C. POOL, POOL EQUIPMENT, AND POOL DECK.
 D. FIRE PIT
 E. FENCES AND GATES
  
 CONTACT ERIC SCHNEIDER @ (561) 822-1446
 [email protected]
  

Review Stop Z ZONING
Rev No 1 Status F Date 2021-09-24 Cont ID  
Sent By eshneide Date 2021-09-24 Time 16:14 Rev Time 0.25
Received By eschneid Date 2021-09-24 Time 15:39 Sent To  
Notes
2021-09-24 16:15:27FAILED
  
 1) PROVIDE A SURVEY THAT IS LESS THAN ONE YEAR OLD.
  
 2) ZONING WILL NOT APPROVE THIS PERMIT UNTIL YOU HAVE
 SUBMITTED A LANDSCAPE PERMIT. PLEASE NOTE: THAT PRIOR
 TO THE REMOVAL OR RELOCATION OF ANY TREES OR PALMS, YOU
 MUST HAVE AN ISSUED TREE ALTERATION PERMIT.
  
 3) PROVIDE THE SETBACK DIMENSIONS FROM THE EDGE OF THE
 CONDENSING UNIT PADS TO THE PROPERTY LINE. THIS
 DIMENSION MAY NOT BE LESS THAN THREE FEET SIX INCHES.
  
 4) PLEASE PROVIDE THE BUILDING HEIGHT AS DEFINED BY THE
 CITY OF WEST PALM BEACH ZONING AND LAND DEVELOPMENT
 REGULATIONS - BUILDING, HEIGHT OF, MEANS THE VERTICAL
 DISTANCE FROM THE MEAN GRADE OF A LOT AT THE FRONTAGE
 OF THE BUILDING TO THE HIGHEST POINT OF THE TOP OF THE
 STRUCTURE OF A FLAT ROOF, OR TO THE DECK LINE OF A
 MANSARD ROOF, OR TO THE MID-HEIGHT LEVEL BETWEEN EAVES
 AND RIDGE FOR GABLE, HIP, AND GAMBREL ROOFS. THE PLANS
 PROVIDE THE HEIGHT BASED ON THE FINISHED FLOOR AND NOT
 THE FINISHED GRADE OF THE LOT.
  
 SEPARATE PERMITS, WITH PLANS, ARE REQUIRED FOR:
  
 A. DRIVEWAY/APPROACH
 B. IRRIGATION
 C. POOL, POOL EQUIPMENT, AND POOL DECK.
 D. FIRE PIT
 E. FENCES AND GATES
  
 CONTACT ERIC SCHNEIDER @ (561) 822-1446
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved