2021-09-03 11:38:19 | 09/03/21 1ST POOL PLUMBING REVIEW**DENIED** WITH |
| COMMENTS |
| |
| NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| TIME, AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| |
| 1. WOULD YOU PLEASE SUBMIT TOTAL DYNAMIC HEAD |
| CALCULATIONS FOR THE MAXIMUM SYSTEM FLOW COMPONENTS. IT |
| REQUIRES THAT THE MAXIMUM SYSTEM FLOW RATE DOES NOT |
| EXCEED THE LISTED MAXIMUM FLOW RATE OF THE SUCTION |
| OUTLET FITTING ASSEMBLY (DRAIN COVER). THE TDH |
| CALCULATIONS MUST INCLUDE ALL THE SYSTEM COMPONENTS, |
| INCLUDING SUCTION AND RETURN PIPING, FITTINGS, VALVES, |
| FILTER, AND CHLORINATOR. ALL SYSTEM COMPONENTS EXCEPT |
| THE PUMP PER THE ANSI/APSP/ICC 7 - 2015 SECS. 4.4.9, |
| 4.4.9.1 MAXIMUM SYSTEM FLOW RATE?UNSECURED CONTROL |
| SYSTEMS. |
| |
| 2. INDICATE ON THE PUMP CURVE WHICH CURVE KEY IS FOR |
| THE PUMP BEING INSTALLED ON THIS SYSTEM PER THE WPB |
| AMEND. TO FBC SEC. 107.2.1. |
| |
| WHEN RESUBMITTING PLANS, PLEASE INDICATE THE REVISION & |
| REMOVE ANY VOIDED SHEETS & REPLACE ANY NECESSARY PAGES. |
| A TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW |
| COMMENT NUMBER, WITH A DESCRIPTION OF THE REVISION |
| MADE, IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE |
| THE CHANGES CAN BE FOUND WILL HELP EXPEDITE YOUR |
| PERMIT. THANK YOU FOR YOUR ANTICIPATED COOPERATION. |
| |
| HTTPS://CODES.ICCSAFE.ORG/CODES/FLORIDA |
| |
| LUIS A. CRESPO |
| PLUMBING PLAN EXAMINER / INSPECTOR |
| EMAIL: [email protected] OFFICE: 561 805-6720 |
| |