Plan Review Stops For Permit 21080916 |
Review Stop |
AD |
ADDRESSING |
Rev No |
1 |
Status |
P |
Date |
2021-08-31 |
|
|
Cont ID |
|
Sent By |
cpuell |
Date |
2021-08-31 |
Time |
11:38 |
Rev Time |
0.00 |
Received By |
cpuell |
Date |
2021-08-31 |
Time |
11:38 |
Sent To |
|
|
Notes |
2021-08-31 11:39:12 | ADDRESS CHANGED FROM 433 BARNETT ST TO 431 BARNETT ST | | WITH APPROVAL OF OWNER. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
P |
Date |
2021-12-02 |
|
|
Cont ID |
|
Sent By |
cthroop |
Date |
2021-12-02 |
Time |
15:32 |
Rev Time |
0.00 |
Received By |
cthroop |
Date |
2021-11-09 |
Time |
12:48 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2021-10-06 |
|
|
Cont ID |
|
Sent By |
cthroop |
Date |
2021-10-06 |
Time |
10:55 |
Rev Time |
0.00 |
Received By |
cthroop |
Date |
2021-10-06 |
Time |
06:26 |
Sent To |
|
|
Notes |
2021-10-06 11:02:17 | BUILDING PLAN REVIEW | | | | CHRISTOPHER S. THROOP, C.B.O., CFM | | PLANS EXAMINER II PX3169/SFP306 | | INSPECTOR BN4338 | | BUILDING OFFICIAL BU1635 | | ASFPM CERTIFIED FLOODPLAIN MANAGER US-21-11935 | | DEVELOPMENT SERVICES DEPARTMENT | | CITY OF WEST PALM BEACH | | (561) 805-6726 | | [email protected] | | | | CODES IN EFFECT: | | 2020 FLORIDA BUILDING CODE, 7TH EDITION W/2017 WEST | | PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE, | | CHAPTER 1 ADMINISTRATION | | 2017 NEC | | | | 1ST REVIEW | | | | RESULTS: DENIED | | ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT | | | | NOTICE: LOT SPLIT HAS BEEN APPROVED BY THE CITY. NEW | | ADDRESS WILL BE 431 BARNETT ST. UNITY OF TITLE | | REQUIRED. | | | | 1. SUBMIT NEW SITE PLAN WITH NEW ADDRESS. IDENTIFY | | PROPOSED STRUCTURES ON LOT WITH SETBACK DEMENSIONS TO | | PROPERTY LINES. | | PROVIDE A SITE PLAN W/BOUNDRY LINE SURVEY | | 107.2.5 SITE PLAN. THE CONSTRUCTION DOCUMENTS SUBMITTED | | WITH THE APPLICATION FOR PERMIT SHALL BE ACCOMPANIED BY | | A SITE PLAN SHOWING TO SCALE THE SIZE AND LOCATION OF | | NEW CONSTRUCTION AND EXISTING STRUCTURES ON THE | | SITE,... AND IT SHALL BE DRAWN IN ACCORDANCE WITH AN | | ACCURATE AND INCLUDED BOUNDARY LINE SURVEY. | | | | 2. SUBMIT NEW PLANS WITH CORRECTED ADDRESS. | | 107.2 CONSTRUCTION DOCUMENTS. CONSTRUCTION DOCUMENTS | | SHALL BE IN ACCORDANCE WITH SECTIONS107.2.1 THROUGH | | 107.2.5. | | | | 3. PROVIDE FINISHED FLOOR ELEVATION. | | FINISH FLOOR ELEVATION ? NON-FLOOD ZONE | | R403.1.7.3 FOUNDATION ELEVATION. | | ON GRADED SITES, THE TOP OF ANY EXTERIOR FOUNDATION | | SHALL EXTEND ABOVE THE ELEVATION OF THE STREET GUTTER | | AT POINT OF DISCHARGE OR THE INLET OF AN APPROVED | | DRAINAGE DEVICE A MINIMUM OF 12 INCHES (305 MM) PLUS 2 | | PERCENT. | | ALTERNATE ELEVATIONS ARE PERMITTED SUBJECT TO THE | | APPROVAL OF THE BUILDING OFFICIAL, PROVIDED IT CAN BE | | DEMONSTRATED THAT REQUIRED DRAINAGE TO THE POINT OF | | DISCHARGE AND AWAY FROM THE STRUCTURE IS PROVIDED AT | | ALL LOCATIONS ON THE SITE. | | | | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. | | | | WHEN RESUBMITING, IT IS HELPFUL TO PROVIDE A RESPONSE | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | RE-SUBMITTAL FORM. | | | | | | | | | | |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2021-10-01 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2021-10-01 |
Time |
08:04 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2021-09-30 |
Time |
10:52 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2021-12-02 |
|
|
Cont ID |
|
Sent By |
lmarchan |
Date |
2021-12-02 |
Time |
15:53 |
Rev Time |
0.00 |
Received By |
lmarchan |
Date |
2021-10-19 |
Time |
09:17 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2021-10-06 |
|
|
Cont ID |
|
Sent By |
cthroop |
Date |
2021-10-06 |
Time |
11:02 |
Rev Time |
0.00 |
Received By |
cthroop |
Date |
2021-09-01 |
Time |
09:23 |
Sent To |
|
|
Notes |
|
|
Review Stop |
IMPACT |
COUNTY IMPACT FEES |
Rev No |
2 |
Status |
P |
Date |
2021-12-10 |
|
|
Cont ID |
|
Sent By |
lmarchan |
Date |
2021-12-10 |
Time |
11:36 |
Rev Time |
0.00 |
Received By |
lmarchan |
Date |
2021-12-02 |
Time |
15:53 |
Sent To |
|
|
Notes |
2021-12-10 11:37:15 | RECEIPT MU-2021-057277 - $1897.60 PAID | | | 2021-12-02 15:53:31 | 12/2/21 EMAILED IMPACT FOR REVIEW. LEM |
|
|
Review Stop |
IMPACT |
COUNTY IMPACT FEES |
Rev No |
1 |
Status |
F |
Date |
2021-10-06 |
|
|
Cont ID |
|
Sent By |
cthroop |
Date |
2021-10-06 |
Time |
10:54 |
Rev Time |
0.00 |
Received By |
cthroop |
Date |
2021-10-06 |
Time |
10:54 |
Sent To |
|
|
Notes |
2021-10-06 10:55:12 | PALM BEACH COUNTY IMPACT FEES - DIGITAL SUBMITTALS | | | | PLANS WILL BE REVIEWED BY THE PBC IMPACT FEE OFFICE | | DIGITALLY VIA PROJECTDOX UPON NOTIFICATION BY THIS | | OFFICE. NOTIFICATION MAY OCCUR WHEN PLANS ARE NEAREST | | FINAL FORM. YOU MAY COORDINATE WITH THE IMPACT FEE | | OFFICE AT (561) 233-5025 OR SIMPLY UPLOAD THE MUNICIPAL | | IMPACT FEE QUESTIONNAIRE FORM TO YOUR PROJECT AND NAME | | THE FILE MUNICIPAL IMPACT FEE QUESTIONNAIRE. THE FORM | | CAN BE FOUND AT: HTTP://DISCOVER.PBCGOV.ORG/PZB/ADMINIS | | TRATION/PDF/IMPACTFEES/FORMS/QUESTIONNAIRE.PDF UPON | | APPROVAL AND FEE PAYMENT, PLEASE UPLOAD THE RECEIPT TO | | YOUR PROJECT OR EMAIL IT TO [email protected] | | |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
1 |
Status |
P |
Date |
2021-09-02 |
|
|
Cont ID |
|
Sent By |
medwards |
Date |
2021-09-02 |
Time |
09:40 |
Rev Time |
0.00 |
Received By |
medwards |
Date |
2021-09-02 |
Time |
09:34 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
P |
Date |
2021-09-21 |
|
|
Cont ID |
|
Sent By |
lcrespo |
Date |
2021-09-21 |
Time |
18:21 |
Rev Time |
0.00 |
Received By |
lcrespo |
Date |
2021-09-21 |
Time |
18:21 |
Sent To |
|
|
Notes |
2021-09-21 18:21:57 | 09/21/21 REVIEWED FOR CODE COMPLIANCE (PLUMBING) | | | | BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE | | COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN | | PROFESSIONAL, CONTRACTORS, OR THEIR REPRESENTATIVES | | FROM THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, | | STATE, AND NATIONAL CODES AND STANDARDS IN EFFECT AT | | THE TIME OF PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK | | OF EVERY ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM | | REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES | | / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO | | AVOID VOIDING OF THE PERMIT. | | | | LUIS A. CRESPO | | PLUMBING PLAN EXAMINER / INSPECTOR | | EMAIL: [email protected] OFFICE: 561 805-6720 | | |
|
|
Review Stop |
R |
ROOF PLAN REVIEW |
Rev No |
1 |
Status |
P |
Date |
2021-10-06 |
|
|
Cont ID |
|
Sent By |
cthroop |
Date |
2021-10-06 |
Time |
10:54 |
Rev Time |
0.00 |
Received By |
cthroop |
Date |
2021-10-06 |
Time |
06:28 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
2 |
Status |
P |
Date |
2021-12-02 |
|
|
Cont ID |
|
Sent By |
cthroop |
Date |
2021-12-02 |
Time |
15:32 |
Rev Time |
0.00 |
Received By |
cthroop |
Date |
2021-11-09 |
Time |
12:48 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
N |
Date |
2021-09-24 |
|
|
Cont ID |
|
Sent By |
medwards |
Date |
2021-09-02 |
Time |
09:55 |
Rev Time |
0.00 |
Received By |
medwards |
Date |
2021-09-02 |
Time |
09:53 |
Sent To |
|
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
P |
Date |
2021-09-13 |
|
|
Cont ID |
|
Sent By |
awooten |
Date |
2021-09-13 |
Time |
|
Rev Time |
|
Received By |
awooten |
Date |
2021-09-13 |
Time |
|
Sent To |
|
|
Notes |
2021-09-09 12:47:45 | *************************ZONING | | REVIEW******************* | | | | PROVIDE THE APPROVAL LETTER FROM THE CITY OF WEST PALM | | BEACH FOR THE LOT SPLIT. SATISFIED | | | | SEPARATE PERMITS ARE REQUIRED FOR FENCE/WALL, | | GENERATORS, MECHANICAL /AC/POOL EQUIPMENT, LANDSCAPING | | AND DRIVEWAYS. | | | | ADDITIONAL COMMENTS MAY FOLLOW FURTHER REVIEW. | | | | ALANA WOOTEN | | PLANNER | | PLANNING DIVISON | | 561-822-1449 | | [email protected] |
|
|