Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2021-08-11 Cont ID  
Sent By rmcphers Date 2021-08-11 Time 08:14 Rev Time 0.00
Received By rmcphers Date 2021-08-11 Time 08:09 Sent To  
Notes
2021-08-11 08:13:57REVISION - BUILDOUT
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected].
 CODE USED FOR REVIEW - 2020 FBC WITH 2017 WPB CHAPTER 1
 AMENDMENT
  
 CORRECTIONS NEEDED -
 1) PLEASE SHOW RESTROOM FLOOR AND BASE BOARD TO COMPLY
 WITH FBC 1210.2.1FLOORS AND WALL BASES.
 IN OTHER THAN DWELLING UNITS, TOILET, BATHING AND
 SHOWER ROOM FLOOR FINISH MATERIALS SHALL HAVE A SMOOTH,
 HARD, NONABSORBENT SURFACE. THE INTERSECTIONS OF SUCH
 FLOORS WITH WALLS SHALL HAVE A SMOOTH, HARD,
 NONABSORBENT VERTICAL BASE THAT EXTENDS UPWARD ONTO THE
 WALLS NOT LESS THAN 4 INCHES (102 MM). (DRYWALL IS NOT
 CONSIDERED A HARD SURFACE FOR THE BASE BOARD)
 2) PLEASE SHOW RESTROOM AND MOP SINK AREA WALL FINISH
 TO COMPLY WITH FBC 1210.2.2 WALLS AND PARTITIONS.
 WALLS AND PARTITIONS WITHIN 2 FEET (610 MM) OF SERVICE
 SINKS, URINALS AND WATER CLOSETS SHALL HAVE A SMOOTH,
 HARD, NONABSORBENT SURFACE, TO A HEIGHT OF NOT LESS
 THAN 4 FEET (1219 MM) ABOVE THE FLOOR, AND EXCEPT FOR
 STRUCTURAL ELEMENTS, THE MATERIALS USED IN SUCH WALLS
 SHALL BE OF A TYPE THAT IS NOT ADVERSELY AFFECTED BY
 MOISTURE. (DRYWALL IS NOT CONSIDERED A HARD SURFACE).
 3) (NO CHANGES) PLEASE SHOW ACCESSIBLE RESTROOM MIRRORS
 MAXIMUM HEIGHT FROM THE FINISHED FLOOR TO THE BOTTOM OF
 THE "REFLECTIVE SURFACE" FBC (A) 603.3 MIRRORS.
 MIRRORS LOCATED ABOVE LAVATORIES OR COUNTERTOPS SHALL
 BE INSTALLED WITH THE BOTTOM EDGE OF THE REFLECTING
 SURFACE 40 INCHES (1015 MM) MAXIMUM ABOVE THE FINISH
 FLOOR OR GROUND.
 4) NEW DRAWINGS NEED TO BE IN THE "DRAWINGS" FOLDER IN
 PROJECTDOX. DRAWINGS IN THE "SIGNATURE" FOLDER IN
 PROJECTDOX CANNOT BE MARKED APPROVED. IF NEEDED ADD TO
 BOTH "SIGNATURES" AND "DRAWINGS" FOLDER.
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2021-07-21 Cont ID  
Sent By mcphers Date 2021-07-21 Time 08:45 Rev Time 0.00
Received By rmcphers Date 2021-07-21 Time 08:44 Sent To  
Notes
2021-07-21 08:59:23REVISION - BUILDOUT
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected].
 CODE USED FOR REVIEW - 2020 FBC WITH 2017 WPB CHAPTER 1
 AMENDMENT
  
 CORRECTIONS NEEDED -
 1) PLEASE SHOW RESTROOM FLOOR AND BASE BOARD TO COMPLY
 WITH FBC 1210.2.1FLOORS AND WALL BASES.
 IN OTHER THAN DWELLING UNITS, TOILET, BATHING AND
 SHOWER ROOM FLOOR FINISH MATERIALS SHALL HAVE A SMOOTH,
 HARD, NONABSORBENT SURFACE. THE INTERSECTIONS OF SUCH
 FLOORS WITH WALLS SHALL HAVE A SMOOTH, HARD,
 NONABSORBENT VERTICAL BASE THAT EXTENDS UPWARD ONTO THE
 WALLS NOT LESS THAN 4 INCHES (102 MM).
 2) PLEASE SHOW RESTROOM AND MOP SINK AREA WALL FINISH
 TO COMPLY WITH FBC 1210.2.2 WALLS AND PARTITIONS.
 WALLS AND PARTITIONS WITHIN 2 FEET (610 MM) OF SERVICE
 SINKS, URINALS AND WATER CLOSETS SHALL HAVE A SMOOTH,
 HARD, NONABSORBENT SURFACE, TO A HEIGHT OF NOT LESS
 THAN 4 FEET (1219 MM) ABOVE THE FLOOR, AND EXCEPT FOR
 STRUCTURAL ELEMENTS, THE MATERIALS USED IN SUCH WALLS
 SHALL BE OF A TYPE THAT IS NOT ADVERSELY AFFECTED BY
 MOISTURE. (DRYWALL IS NOT CONSIDERED A HARD SURFACE).
 3) PLEASE SHOW ACCESSIBLE RESTROOM MIRRORS MAXIMUM
 HEIGHT FROM THE FINISHED FLOOR TO THE BOTTOM OF THE
 "REFLECTIVE SURFACE" FBC (A) 603.3 MIRRORS.
 MIRRORS LOCATED ABOVE LAVATORIES OR COUNTERTOPS SHALL
 BE INSTALLED WITH THE BOTTOM EDGE OF THE REFLECTING
 SURFACE 40 INCHES (1015 MM) MAXIMUM ABOVE THE FINISH
 FLOOR OR GROUND.
 4) PLEASE SHOW THE TOILET REAR GRAB BAR ON CENTER
 DIMENSIONS TO BE AS PER FBC (A) FIGURE 604.5.2
 5) PLEASE SHOW THE TOILET PAPER HOLDER DIMENSIONS FROM
 THE FACE OF THE TOILET TO BE AS PER FBC (A) 604.7
 DISPENSERS.
 TOILET PAPER DISPENSERS SHALL COMPLY WITH 309.4 AND
 SHALL BE 7 INCHES (180 MM) MINIMUM AND 9 INCHES (230
 MM) MAXIMUM IN FRONT OF THE WATER CLOSET MEASURED TO
 THE CENTERLINE OF THE DISPENSER. THE OUTLET OF THE
 DISPENSER SHALL BE 15 INCHES (380 MM) MINIMUM AND 48
 INCHES (1220 MM) MAXIMUM ABOVE THE FINISH FLOOR AND
 SHALL NOT BE LOCATED BEHIND GRAB BARS.

Review Stop E ELECTRICAL
Rev No 2 Status N Date 2021-08-10 Cont ID  
Sent By jleahy Date 2021-08-10 Time 11:52 Rev Time 0.00
Received By jleahy Date 2021-08-10 Time 11:48 Sent To  
Notes
2021-08-10 11:52:56PERMIT WAS PULLED BEFORE CODE CHANGE. JLEAHY

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2021-07-22 Cont ID  
Sent By jleahy Date 2021-07-22 Time 13:38 Rev Time 0.00
Received By jleahy Date 2021-07-22 Time 13:31 Sent To  
Notes
2021-07-22 13:42:09FLORIDA BUILDING CODE 2020 7TH EDITION
 FLORIDA BUILDING CODE ENERGY CONSERVATION 2020 7TH ED
 NFPA 70 2017 EDITION
  
 JAKE LEAHY BN, BU, PX
 ELECTRICAL PLANS EXAMINER II
 561-805-6713
 [email protected]
  
 OUTLET REQUIRED IN FLOOR OF NEED MEETING ROOM. SEE
 210.71(B)(2)
  
 NO OTHER ELECTRIC SHOWN FOR REVISION.

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2021-07-08 Cont ID  
Sent By pleduc Date 2021-07-08 Time   Rev Time 0.00
Received By pleduc Date 2021-07-08 Time 16:21 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2021-08-20 Cont ID  
Sent By lmarchan Date 2021-08-20 Time 11:09 Rev Time 0.00
Received By lmarchan Date 2021-07-27 Time 16:41 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2021-07-23 Cont ID  
Sent By lmarchan Date 2021-07-23 Time 14:20 Rev Time 0.00
Received By lmarchan Date 2021-07-06 Time 17:10 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status F Date 2021-08-20 Cont ID  
Sent By tklarge Date 2021-08-20 Time 10:36 Rev Time 0.00
Received By tklarge Date 2021-08-20 Time 09:34 Sent To  
Notes
2021-08-20 10:36:181) THE FLOORS AND WALL BASES OF THE TOILET ROOMS SHALL
 COMPLY WITH FBC-BUILDING SEC. 1210.2.1.SHOW THE WALL
 FINISH ON THE PLANS. EPOXY PAINT ON DRYWALL DOES NOT
 COMPLY WITH THE CODE.2ND REQUEST.
 2) SHOW THE RESTROOM AND MOP SINK WALL FINISH ON THE
 PLANS. THE WALL FINISH SHALL COMPLY WITH FBC-PLUMBING
 SEC.1210.2.2. EPOXY PAINT ON DRYWALL DOES NOT COMPLY
 WITH THE CODE. 2ND REQUEST.
 3) THE MIRROR IN THE TOILET ROOM SHALL BE MEASURED A
 MAXIMUMOF 40 INCHES FROM THE FINISH FLOOR TO THE BOTTOM
 OF THE REFLECTIVE SURFACE PER FBC-ACCESS. SEC.603.3.
 2ND REQUEST.
 4) SHT. A2.0 - DETAIL #8 - RECESSED SOAP DISPENSER -
 THE OPERABLE PARTS SHALL BE WITHIN THE REACH RANGES PER
 SEC. 308 OF FBC-ACCESS. SHOW THE HEIGHT ON THE DETAIL.
 2ND REQUEST.
 5) SHT. A2.0 - DETAIL #6 - THE OPERABLE PARTS OF THE
 HCPT SHALL BE WITHIN THE REACH RANGES PER SEC. 308 OF
 FBC-ACCESS. SHOW THE HEIGHT ON THE DETAIL. 2ND REQUEST.
 6) SHT. A2.0 - DETAIL #2 - THE TOILET PAPER DISPENSER
 SHALL COMPLY WITH FBC-ACCESS. SEC. 309.4 AND SHALL BE 7
 INCHES MINIMUM AND 9 INCHES MAXIMUM IN FRONT OF THE
 WATER CLOSET MEASURED TO THE CENTERLINE OF THE
 DISPENSER ( NOT TO THE CENTER OF THE FIRST DISPENSER.
 2ND REQUEST.
 7) SHT. A2.0 - DETAIL #1 & DETAIL #2 - THE GRAB BAR
 BEHIND THE WATER CLOSET IS SHOWN AS BEING MEASURED TO
 THE CENTERLINE OF THE GRAB BAR FROM THE FINISH FLOOR
 AND ALSO TO THE TOP OF THE BAR. THE GRAB BAR SHALL BE
 MEASURED TO THE TOP OF THE GRIPPING SURFACE PER
 FBC-ACCESS SEC. 609.4. 2ND REQUEST.
 8) SHT. A2.0 - DETAIL #1 - THE GRAB BAR BEHIND THE
 WATER CLOSET SHALL BE LOCATED PER FBC-ACCESS. SEC.
 604.5.2 & FIGURE 604.5.2.SHOW THE DIMENSIONS ON THE
 DETAIL. 2ND REQUEST.
 9) SUBMIT A SANITARY AND WATER RISER FOR REVIEW FOR THE
 NEW PLUMBING WORK TO BE INSTALLED. WPB AMEND. TO FBC
 SEC. 1107.3.5.1.3.
 10) SUBMIT A SLAB REPAIR DETAIL FOR REVIEW. SHOW THE
 WIDTH OF THE REPAIR, THE MINIMUM THICKNESS OF THE
 CONCRETE TO BE REPLACED, AND THE PSI OF THE CONCRETE.
 SHOW THE SIZE AND LENGTH OF THE DOWELS, THE MINIMUM
 EMBEDMENT DEPTH INTO THE EXISTING SLAB, THE ANCHORING
 MATERIAL FOR THE DOWELS AND THE SPACING OF THE DOWELS
 ON CENTER. THE REPAIR SHALL ALSO INCLUDE TERMITE
 TREATMENT OF THE SOIL AND THE REQUIRED VAPOR BARRIER
 OVER WELL COMPACTED SOIL. A COPY OF THE TERMITE
 CERTIFICATE SHALL BE ONSITE FOR FINAL INSPECTION.
  
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2021-07-23 Cont ID  
Sent By tklarge Date 2021-07-23 Time 14:08 Rev Time 0.00
Received By tklarge Date 2021-07-23 Time 09:04 Sent To  
Notes
2021-07-23 10:38:031) THE FLOORS AND WALL BASES OF THE TOILET ROOMS SHALL
 COMPLY WITH FBC-BUILDING SEC. 1210.2.1.SHOW THE WALL
 FINISH ON THE PLANS. EPOXY PAINT ON DRYWALL DOES NOT
 COMPLY WITH THE CODE.
 2) SHOW THE RESTROOM AND MOP SINK WALL FINISH ON THE
 PLANS. THE WALL FINISH SHALL COMPLY WITH FBC-PLUMBING
 SEC.1210.2.2. EPOXY PAINT ON DRYWALL DOES NOT COMPLY
 WITH THE CODE.
 3) THE MIRROR IN THE TOILET ROOM SHALL BE MEASURED A
 MAXIMUMOF 40 INCHES FROM THE FINISH FLOOR TO THE BOTTOM
 OF THE REFLECTIVE SURFACE PER FBC-ACCESS. SEC.603.3.
 4) SHT. A2.0 - DETAIL #8 - RECESSED SOAP DISPENSER -
 THE OPERABLE PARTS SHALL BE WITHIN THE REACH RANGES PER
 SEC. 308 OF FBC-ACCESS. SHOW THE HEIGHT ON THE DETAIL.
 5) SHT. A2.0 - DETAIL #6 - THE OPERABLE PARTS OF THE
 HCPT SHALL BE WITHIN THE REACH RANGES PER SEC. 308 OF
 FBC-ACCESS. SHOW THE HEIGHT ON THE DETAIL.
 6) SHT. A2.0 - THE TOILET PAPER DISPENSER SHALL COMPLY
 WITH FBC-ACCESS. SEC. 309.4 AND SHALL BE 7 INCHES
 MINIMUM AND 9 INCHES MAXIMUM IN FRONT OF THE WATER
 CLOSET MEASURED TO THE CENTERLINE OF THE DISPENSER (
 NOT TO THE CENTER OF THE FIRST DISPENSER.)
 7) SHT. A2.0 - DETAIL #1 - THE GRAB BAR BEHIND THE
 WATER CLOSET IS SHOWN AS BEING MEASURED TO THE
 CENTERLINE OF THE GRAB BAR FROM THE FINISH FLOOR AND
 ALSO TO THE TOP OF THE BAR. THE GRAB BAR SHALL BE
 MEASURED TO THE TOP OF THE GRIPPING SURFACE PER
 FBC-ACCESS SEC. 609.4.
 8) SHT. A2.0 - DETAIL #1 - THE GRAB BAR BEHIND THE
 WATER CLOSET SHALL BE LOCATED PER FBC-ACCESS. SEC.
 604.5.2 & FIGURE 604.5.2.SHOW THE DIMENSIONS ON THE
 DETAIL.
 9) SHT. A2.0 - THE PLANS REFERENCE DETAILS #1 & #2 ON
 SHT. A2.1. THERE IS NO SHT. A2.1 IN THIS SUBMITTAL.
 CLARIFY.
 10) SHOW THE INSIDE CLEAR DIMENSIONS OF THE TOILET
 ROOMS AND ALSO OF THE CLEAR FLOOR SPACES FOR THE WATER
 CLOSETS AND LAVATORIES.COMPLY WITH FBC-ACCESS.
 SECS.604.3, 606.2.
 11) SHOW THE DISTANCE OF THE CENTERLINE WATER CLOSET
 FROM THE ADJACENT WALL. COMPLY WITH FBC-ACCESS.
 SEC.604.2.
 12) SUBMIT A SANITARY AND WATER RISER FOR REVIEW FOR
 THE NEW PLUMBING WORK TO BE INSTALLED. WPB AMEND. TO
 FBC SEC. 1107.3.5.1.3.
 13) SUBMIT A SLAB REPAIR DETAIL FOR REVIEW. SHOW THE
 WIDTH OF THE REPAIR, THE MINIMUM THICKNESS OF THE
 CONCRETE TO BE REPLACED, AND THE PSI OF THE CONCRETE.
 SHOW THE SIZE AND LENGTH OF THE DOWELS, THE MINIMUM
 EMBEDMENT DEPTH INTO THE EXISTING SLAB, THE ANCHORING
 MATERIAL FOR THE DOWELS AND THE SPACING OF THE DOWELS
 ON CENTER. THE REPAIR SHALL ALSO INCLUDE TERMITE
 TREATMENT OF THE SOIL AND THE REQUIRED VAPOR BARRIER
 OVER WELL COMPACTED SOIL. A COPY OF THE TERMITE
 CERTIFICATE SHALL BE ONSITE FOR FINAL INSPECTION.
  
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2021-08-11 Cont ID  
Sent By rmcphers Date 2021-08-11 Time 08:29 Rev Time 0.00
Received By rmcphers Date 2021-08-11 Time 08:29 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2021-07-21 Cont ID  
Sent By rmcphers Date 2021-07-21 Time 08:45 Rev Time 0.00
Received By rmcphers Date 2021-07-21 Time 08:45 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved