Plan Review Details - Permit 21061138
Plan Review Stops For Permit 21061138
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2021-07-03 Cont ID  
Sent By cthroop Date 2021-07-03 Time 11:24 Rev Time 0.00
Received By cthroop Date 2021-07-03 Time 11:21 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2021-06-28 Cont ID  
Sent By jleahy Date 2021-06-28 Time 14:43 Rev Time 0.00
Received By jleahy Date 2021-06-28 Time 14:40 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status P Date 2021-07-01 Cont ID  
Sent By lcrespo Date 2021-07-01 Time 15:32 Rev Time 0.00
Received By lcrespo Date 2021-07-01 Time 15:32 Sent To  
Notes
2021-07-01 15:33:1107/01/21 REVIEWED FOR CODE COMPLIANCE (GAS)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS, OR THEIR REPRESENTATIVES
 FROM THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL,
 STATE, AND NATIONAL CODES AND STANDARDS IN EFFECT AT
 THE TIME OF PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK
 OF EVERY ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2021-07-13 Cont ID  
Sent By cthroop Date 2021-07-13 Time 10:44 Rev Time 0.00
Received By cthroop Date 2021-06-18 Time 08:39 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status N Date 2021-07-01 Cont ID  
Sent By lcrespo Date 2021-07-01 Time 15:33 Rev Time 0.00
Received By lcrespo Date 2021-07-01 Time 15:33 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2021-07-03 Cont ID  
Sent By cthroop Date 2021-07-03 Time 11:25 Rev Time 0.00
Received By cthroop Date 2021-07-03 Time 11:21 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2021-07-12 Cont ID  
Sent By kalexand Date 2021-07-12 Time 17:41 Rev Time 0.00
Received By kalexand Date 2021-07-12 Time 17:41 Sent To I
Notes
2021-07-12 17:47:09ZONING PLAN REVIEW
 ________________________________________
  
 REVIEW STATUS: PASSED WITH PROVISOS
 ________________________________________
  
 THIS REVIEW HAS BEEN PASSED SUBJECT TO THE FOLLOWING
 PROVISOS:
  
 1. MINIMUM SETBACK FOR GENERATOR SHALL BE 5.8'.
 S. OLIVE CONSIDERED LEGAL FRONT SETBACK THEREFORE EAST
 PROPERTY LINE IS CONSIDERED THE REAR SETBACK; 9.8' IS
 THE REQUIRED REAR SETBACK, GENERATOR ALLOWED TO
 ENCROACH 4FT.
 ________________________________________
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 ________________________________________
  
 QUESTIONS/COMMENTS, PLEASE CONTACT THE FOLLOWING:
  
 KIZZI ALEXANDRE, ASSOCIATE PLANNER
 CITY OF WEST PALM BEACH
 DEVELOPMENT SERVICES DEPARTMENT ? PLANNING DIVISION
 401 CLEMATIS STREET - P.O. BOX 3147
 WEST PALM BEACH, FLORIDA 33402
  
 P: 561.822.1442
 E: [email protected]
  
 W: WPB.ORG
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved