Plan Review Details - Permit 21061106
Plan Review Stops For Permit 21061106
Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 2 Status P Date 2021-07-30 Cont ID  
Sent By rmcphers Date 2021-07-30 Time 12:18 Rev Time 0.00
Received By rmcphers Date 2021-07-30 Time 12:18 Sent To  
Notes
***NONE***

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 1 Status F Date 2021-07-21 Cont ID  
Sent By rmcphers Date 2021-07-21 Time 09:31 Rev Time 0.00
Received By rmcphers Date 2021-07-21 Time 09:31 Sent To  
Notes
2021-07-21 09:32:03ASBESTOS LETTER NEEDS TO BE SIGNED BY THE CONTRACTOR

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2021-07-30 Cont ID  
Sent By rmcphers Date 2021-07-30 Time 12:19 Rev Time 0.00
Received By rmcphers Date 2021-07-30 Time 12:19 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2021-07-21 Cont ID  
Sent By rmcphers Date 2021-07-21 Time 09:35 Rev Time 0.00
Received By rmcphers Date 2021-07-21 Time 09:21 Sent To  
Notes
2021-07-21 09:35:50CONDO REMODEL
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1
 AMENDMENTS
  
 CORRECTIONS NEEDED -
  
 1) THE FOLLOWING ACUSTICAL TEST REPORTS ARE REQUIRED:
  
 MANUFACTURER SPEC SHEETS ARE NOT ACCEPTABLE DUE TO
 DISCREPANCIES BETWEEN SPEC SHEETS/BROCHURES AND TEST
 REPORTS FOR SOME MANUFACTURERS (NOT NECESSARILY THE
 MANUFACTURER SELECTED; THIS IS A GENERAL COMMENT)
  
 A. FBC 1207.2, FLOOR/CEILING ASSEMBLIES SEPARATING
 DWELLING UNITS FROM EACH OTHER OR FROM PUBLIC OR
 SERVICE AREAS SHALL HAVE A SOUND TRANSMISSION CLASS
 (STC) OF NOT LESS THAN 50 (45 IF FIELD TESTED) FOR AIR
 BORNE NOISE WHEN TESTED IN ACCORDANCE WITH ASTM E 90..
 PROVIDE A COPY OF THE TEST REPORT.
  
 B. FBC 1207.3, FLOOR/CEILING ASSEMBLIES BETWEEN
 DWELLING UNITS OR BETWEEN A DWELLING UNIT AND A PUBLIC
 OR SERVICE AREA WITHIN THE STRUCTURE SHALL HAVE AN
 IMPACT INSULATION CLASS (IIC) RATING OF NOT LESS THAN
 50 (45 IF FIELD TESTED) WHEN TESTED IN ACCORDANCE WITH
 ASTM E 492. PROVIDE A COPY OF THE TEST REPORT.
  
 C. FBC 603.1, ALLOWABLE MATERIALS IN NON COMBUSTIBLE
 BUILDINGS, SEE ITEM 2, EXCEPTION 2, ACOUSTICAL
 INSULATION INSTALLED BETWEEN A FINISHED FLOOR AND SOLID
 DECKING WITHOUT INTERVENING AIRSPACE SHALL BE ALLOWED
 TO HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 200. SEE
 803.1.1, PROVIDE TEST DATA IN ACCORDANCE WITH ASTM E 84
 OR UL 723. (DO NOT NEED THIS REPORT IF THE PADDING IS
 ATTACHED TO THE FLOORING)
  
 2). YOU CAN EMAIL ME THE PROPOSED TEST REPORTS TO
 VERIFY THAT THEY ARE TEST REPORTS BEFORE RESUBMITTING
 TO PROJECTDOX ( [email protected] )
  

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2021-07-20 Cont ID  
Sent By jleahy Date 2021-07-20 Time 12:22 Rev Time 0.00
Received By jleahy Date 2021-07-20 Time 12:13 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2021-07-28 Cont ID  
Sent By cwalker Date 2021-07-28 Time   Rev Time 0.00
Received By cwalker Date   Time   Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date 2021-07-07 Cont ID  
Sent By cwalker Date 2021-07-07 Time 11:22 Rev Time  
Received By cwalker Date   Time   Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2021-07-30 Cont ID  
Sent By rmcphers Date 2021-07-30 Time 12:19 Rev Time 0.00
Received By rmcphers Date 2021-07-27 Time 09:41 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2021-07-21 Cont ID  
Sent By rmcphers Date 2021-07-21 Time 09:36 Rev Time 0.00
Received By rmcphers Date 2021-07-02 Time 09:56 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2021-07-15 Cont ID  
Sent By lcrespo Date 2021-07-15 Time 09:16 Rev Time 0.00
Received By lcrespo Date 2021-07-15 Time 09:12 Sent To  
Notes
2021-07-15 09:16:4107/15/21 REVIEWED FOR CODE COMPLIANCE (PLUMBING)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS, OR THEIR REPRESENTATIVES
 FROM THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL,
 STATE, AND NATIONAL CODES AND STANDARDS IN EFFECT AT
 THE TIME OF PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK
 OF EVERY ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2021-07-21 Cont ID  
Sent By rmcphers Date 2021-07-21 Time 09:36 Rev Time 0.00
Received By rmcphers Date 2021-07-21 Time 09:36 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy