Plan Review Details - Permit 21051661
Plan Review Stops For Permit 21051661 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
P |
Date |
2021-06-29 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2021-06-29 |
Time |
09:51 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2021-06-29 |
Time |
09:51 |
Sent To |
|
|
Notes |
2021-06-29 09:53:20 | THE PROJECT IS LOCATED IN AN AE FLOOD ZONE. THE POOL | | EQUIPMENT IS REQUIRED TO BE LOCATED AT OR ABOVE THE | | FLOOR ELEVATION OF THE HABITABLE SPACE. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2021-06-08 |
|
|
Cont ID |
|
Sent By |
ppetty |
Date |
2021-06-08 |
Time |
12:11 |
Rev Time |
0.00 |
Received By |
ppetty |
Date |
2021-06-08 |
Time |
10:56 |
Sent To |
|
|
Notes |
|
|
Review Stop |
G |
GAS REVIEW |
Rev No |
1 |
Status |
N |
Date |
2021-06-03 |
|
|
Cont ID |
|
Sent By |
lcrespo |
Date |
2021-06-03 |
Time |
11:41 |
Rev Time |
0.00 |
Received By |
lcrespo |
Date |
2021-06-03 |
Time |
11:41 |
Sent To |
|
|
Notes |
2021-06-03 11:42:09 | GAS PLAN REVIEW, A GAS PLAN HAS NOT BEEN INCLUDED IN | | THIS SUBMITTAL PACKAGE. A GAS PLAN REVIEW HAS NOT BEEN | | PERFORMED AT THIS TIME. A SEPARATE GAS PERMIT AND PLANS | | WILL BE REQUIRED FOR A CONTRACTOR TO PERFORM THE | | RELATED WORK. PROVIDE COMPLETE PLANS AND GAS RISER THAT | | REFLECTS THE ENTIRE SCOPE OF GAS WORK TO BE DONE PER | | THE WPB AMENDMENTS TO FBC SEC. 107.2.1. | | | | A SUB GAS PERMIT IS REQUIRED BY A LICENSED CONTRACTOR | | FOR THE SCOPE OF WORK PER THE WPB AMENDMENTS TO THE FBC | | SEC. 105.1. | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2021-07-21 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2021-07-21 |
Time |
16:20 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2021-06-01 |
Time |
14:22 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
P |
Date |
2021-06-03 |
|
|
Cont ID |
|
Sent By |
lcrespo |
Date |
2021-06-03 |
Time |
11:40 |
Rev Time |
0.00 |
Received By |
lcrespo |
Date |
2021-06-03 |
Time |
11:40 |
Sent To |
|
|
Notes |
2021-06-03 11:40:19 | 06/03/21 REVIEWED FOR CODE COMPLIANCE (PLUMBING/POOL) | | | | BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE | | COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN | | PROFESSIONAL, CONTRACTORS, OR THEIR REPRESENTATIVES | | FROM THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, | | STATE, AND NATIONAL CODES AND STANDARDS IN EFFECT AT | | THE TIME OF PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK | | OF EVERY ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM | | REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES | | / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO | | AVOID VOIDING OF THE PERMIT. | | | | LUIS A. CRESPO | | PLUMBING PLAN EXAMINER / INSPECTOR | | EMAIL: [email protected] OFFICE: 561 805-6720 | | |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
P |
Date |
2021-06-29 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2021-06-29 |
Time |
09:51 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2021-06-29 |
Time |
09:51 |
Sent To |
|
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
P |
Date |
2021-07-20 |
|
|
Cont ID |
|
Sent By |
kalexand |
Date |
2021-07-20 |
Time |
13:50 |
Rev Time |
0.00 |
Received By |
ajones |
Date |
2021-07-20 |
Time |
13:50 |
Sent To |
|
|
Notes |
|
|
|
Account Summary | Usage Policy | Privacy Policy