Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 1 Status P Date 2021-05-26 Cont ID  
Sent By pvalenti Date 2021-05-26 Time 08:18 Rev Time 0.00
Received By pvalenti Date 2021-05-26 Time 08:15 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2021-06-17 Cont ID  
Sent By pvalenti Date 2021-06-17 Time 13:20 Rev Time 0.00
Received By pvalenti Date 2021-06-17 Time 13:20 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2021-05-26 Cont ID  
Sent By pvalenti Date 2021-05-26 Time 09:53 Rev Time 0.00
Received By pvalenti Date 2021-05-26 Time 08:15 Sent To  
Notes
2021-05-26 09:54:433. UTILITY RELEASE - CITY OF WEST PALM BEACH WATER
 DEPARTMENT, REQUEST FOR METER PULL, ON
 THEIR FORM "DEMOLITION APPLICATION"
 HTTP://WPB.ORG/DEPARTMENTS/DEVELOPMENT-SERVICES/FORMS/B
 UILDING-PERMIT-FORMS
 IF A HYDRANT METER OR BACKFLOW PREVENTER IS DESIRED,
 THEN A PARTIAL RELEASE WILL BE
 NOTED ON THEIR FORM.
 FAX THE COMPLETED "DEMOLITION APPLICATION" FORM TO
 561-822-2183.
 (FAILED), PENDING THE METHOD OF WATERING DOWN SITE
 DURING DEMOLITION:
 A) IF WATER TRUCK IS DESIRED A CONTRACTOR?S LETTER IS
 REQUIRED STATING THE GALLON CAPACITY OF WATER TANK AND
 THAT THE WATER TRUCK WILL BE USING ONLY POTABLE WATER
 FROM OFF-SITE LOCATION AND WILL BE ON-SITE AT ALL TIMES
 DURING CONSTRUCTION).
 B) IF HYDRANT METER IS DESIRED, PROVIDE
 REGISTRATION/CERTIFICATION INFORMATION FROM THE CITY
 UTILITIES DEPARTMENT.
 C) IF BACKFLOW PREVENTER IS DESIRED, PROVIDE SEPERATE
 BACKFLOW PREVENTER PERMIT AND FINAL INSPECTION FROM THE
 BUILDING DEPARTMENT.
  
 4. A SEWER LATERAL CAPPING PLUMBING FINAL INSPECTION IS
 REQUIRED FOR PERMIT #21051097.
 PLEASE UPLOAD THE APPROVED FINAL PLUMBING INSPECTION
 #703 REULTS
  

Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2021-06-17 Cont ID  
Sent By rrossano Date 2021-06-17 Time   Rev Time 0.00
Received By rrossano Date 2021-06-17 Time   Sent To I
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2021-06-02 Cont ID  
Sent By rrossano Date 2021-06-02 Time   Rev Time  
Received By rrossano Date 2021-06-02 Time   Sent To  
Notes
2021-06-02 07:29:00PLEASE ADDRESS BUILDING COMMENTS.

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2021-06-09 Cont ID  
Sent By aborngra Date 2021-06-09 Time 10:11 Rev Time 0.00
Received By aborngra Date 2021-06-09 Time 10:11 Sent To  
Notes
2021-06-09 10:11:25REMOVAL OF TREES ON THE PROPERTY MAY REQUIRE A TREE
 ALTERATION PERMIT. - AB

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2021-06-18 Cont ID  
Sent By pvalenti Date 2021-06-18 Time 06:21 Rev Time 0.00
Received By pvalenti Date 2021-06-18 Time 06:21 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2021-06-11 Cont ID  
Sent By jleahy Date 2021-06-11 Time 16:05 Rev Time 0.00
Received By jleahy Date 2021-05-25 Time 11:29 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status N Date 2021-05-26 Cont ID  
Sent By pvalenti Date 2021-05-26 Time 09:59 Rev Time 0.00
Received By pvalenti Date 2021-05-26 Time 08:16 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status N Date 2021-06-09 Cont ID  
Sent By aborngra Date 2021-06-09 Time 10:10 Rev Time 0.00
Received By aborngra Date 2021-06-09 Time 10:10 Sent To  
Notes
***NONE***