Plan Review Details - Permit 21040795
Plan Review Stops For Permit 21040795
Review Stop AD ADDRESSING
Rev No 1 Status P Date 2021-04-19 Cont ID  
Sent By cpuell Date 2021-04-19 Time 10:22 Rev Time 0.00
Received By cpuell Date 2021-04-19 Time 10:21 Sent To  
Notes
2021-04-19 10:24:08TWO BUILDINGS ON PARCEL 74434409080000000 WITH AN
 ADDRESS OF 7001 PARKER AVE, THE BUILDING WERE GIVEN
 THEIR OWN ADDRESS.

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 1 Status P Date 2021-04-19 Cont ID  
Sent By pvalenti Date 2021-04-19 Time 08:22 Rev Time 0.00
Received By pvalenti Date 2021-04-19 Time 07:19 Sent To  
Notes
2021-04-19 08:26:59PETER E VALENTI
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6673
  
 FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020)
 FBC B = FBC BUILDING
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC R = FBC RESIDENTIAL
  
 ASBESTOS ACKNOWLEDGEMENT APPROVED.
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2021-05-03 Cont ID  
Sent By pvalenti Date 2021-05-03 Time 06:19 Rev Time 0.00
Received By pvalenti Date 2021-05-03 Time 06:19 Sent To  
Notes
2021-05-03 06:23:24PETER E VALENTI
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6673
  
 FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020)
 FBC B = FBC BUILDING
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC R = FBC RESIDENTIAL
  
 BUILDING REVIEW APPROVED WITH PROVISO:
  
 THE PLUMBING PERMIT # 21041038 MUST BE APPROVED PRIOR
 TO FINAL INSPECTION.

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2021-04-30 Cont ID  
Sent By pvalenti Date 2021-04-30 Time 05:52 Rev Time 0.00
Received By pvalenti Date 2021-04-30 Time 05:44 Sent To  
Notes
2021-04-30 05:57:13****CORRECTIONS****
  
 PETER E VALENTI
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6673
  
 FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020)
 FBC B = FBC BUILDING
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC R = FBC RESIDENTIAL
  
 BUILDING REVIEW DENIED:
  
 ITEM #4, PLEASE SCHEDULE THE PLUMBING FINAL INSPECTION
 FOR THE SEWER LATERAL CAPPING PERMIT # 21041038. AFTER
 THE FINAL INSPECTION IS APPROVED PLEASE UPLOAD
 INFORMATION TO PROJECT DOX AND WE WILL APPROVE THE
 BUILDING REVIEW STOP.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2021-04-19 Cont ID  
Sent By pvalenti Date 2021-04-19 Time 07:39 Rev Time 0.00
Received By pvalenti Date 2021-04-19 Time 07:19 Sent To  
Notes
2021-04-19 08:21:44PETER E VALENTI
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6673
  
 FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020)
 FBC B = FBC BUILDING
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC R = FBC RESIDENTIAL
  
 THE FOLLOWING ITEMS ARE REQUIRED PRIOR TO ISSUANCE OF A
 DEMO PERMIT PER FLORIDA BUILDING CODE, BUILDING 3303:
  
  
  
 3. UTILITY RELEASE - CITY OF WEST PALM BEACH WATER
 DEPARTMENT, REQUEST FOR METER PULL, ON THEIR FORM
 "DEMOLITION APPLICATION"
  
 HTTP://WPB.ORG/DEPARTMENTS/DEVELOPMENT-SERVICES/FORMS/B
 UILDING-PERMIT-FORMS
  
 IF A HYDRANT METER OR BACKFLOW PREVENTER IS DESIRED,
 THEN A PARTIAL RELEASE WILL BE NOTED ON THEIR FORM. IF
 A WATER TRUCK IS DESIRED, THEN PLEASE PROVIDE WATER
 TRUCK DETAILS.
  
 FAX THE COMPLETED "DEMOLITION APPLICATION" FORM TO
 561-822-2183.
  
  
 4. SEWER LATERAL CAPPING PERMIT IS REQUIRED (SUBMIT
 APPLICATION TO BUILDING DIVISION); SCHEDULE A FINAL
 PLUMBING #703.
  
  
  
  

Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2021-05-03 Cont ID  
Sent By rrossano Date 2021-05-03 Time   Rev Time 0.00
Received By rrossano Date 2021-05-03 Time   Sent To I
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2021-04-22 Cont ID  
Sent By rrossano Date 2021-04-22 Time   Rev Time  
Received By rrossano Date 2021-04-22 Time   Sent To I
Notes
2021-04-22 08:33:31PLEASE ADDRESS BUILDING COMMENTS.

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2021-04-20 Cont ID  
Sent By aborngra Date 2021-04-20 Time 08:39 Rev Time 0.00
Received By aborngra Date 2021-04-20 Time 08:39 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2021-05-03 Cont ID  
Sent By pvalenti Date 2021-05-03 Time 07:36 Rev Time 0.00
Received By pvalenti Date 2021-04-27 Time 11:22 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2021-04-23 Cont ID  
Sent By rmcphers Date 2021-04-23 Time 12:06 Rev Time 0.00
Received By rmcphers Date 2021-04-16 Time 15:48 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status N Date 2021-04-19 Cont ID  
Sent By pvalenti Date 2021-04-19 Time 08:27 Rev Time 0.00
Received By pvalenti Date 2021-04-19 Time 07:19 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status N Date 2021-04-20 Cont ID  
Sent By aborngra Date 2021-04-20 Time 08:39 Rev Time 0.00
Received By aborngra Date 2021-04-20 Time 08:39 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy