Review Stop AD ADDRESSING
Rev No 1 Status P Date 2021-04-19 Cont ID  
Sent By cpuell Date 2021-04-19 Time 10:44 Rev Time 0.00
Received By cpuell Date 2021-04-19 Time 10:44 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2022-02-01 Cont ID  
Sent By jgomez Date 2022-02-01 Time 14:35 Rev Time 0.00
Received By jgomez Date 2022-02-01 Time 13:58 Sent To  
Notes
2022-02-01 14:36:14BUILDING AUDIT OK. JG.

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2021-12-09 Cont ID  
Sent By jgomez Date 2021-12-09 Time 13:04 Rev Time 0.00
Received By jgomez Date 2021-12-09 Time 09:43 Sent To  
Notes
2021-12-09 13:04:28NEW SINGLE FAMILY RESIDENCE (R3) THIRD BUILDING AUDIT
 COMMENTS.
 CODE: FBC 7TH EDITION (2020) AND CITY AMENDMENTS.
 PERMIT #21040654
  
 ORIGINAL COMMENT:
 1- ACCORDING TO SEC. R301.2.1.4.3 FBC-RESIDENTIAL, THIS
 BUILDING IS LOCATED IN EXPOSURE "D" NOT EXPOSURE "C".
 ENGINEER OF RECORD NEEDS TO REVISE THE BUILDING
 EXPOSURE AND ALL DESIGN PRESSURES ACCORDINGLY.
 NOTE: PRODUCT APPROVALS WILL BE AUDITED ONCE DESIGN
 PRESSURES ARE REVISED.
  
 RESPONSE:
 A)OK
  
 B)TRUSS PACKAGE SUBMITTED:
 (1)TRUSSES WERE DESIGNED BASED ON 2017 FBC AND ASCE
 7-10. THE CURRENT CODE IS 2020 FBC AND ASCE-7-16.
 COMPLETE TRUSS PACKAGE NEEDS TO BE REVISED.
 CHAPTER 553 F.S.
  
 RESPONSE:
 TRUSS PACKAGE COVER PAGE WAS NOT REVISED.
  
  
 ORIGINAL COMMENT:
 2- BASED ON THE SOIL REPORT SUBMITTED THERE ARE HEAVY
 ORGANICS/MUCK THROUGHOUT THE BUILDING PAD AREA. THE
 SOIL REPORT RECOMMENDATION IS TO DEMUCK THE BUILDING
 PAD AREA. A SEPARATE PERMIT IS REQUIRED TO DEMUCK THE
 BUILDING PAD AREA. CONTRACTOR TO SUBMIT PERMIT
 APPLICATION WITH COMPLETE ENGINEER'S DEMUCKING
 SPECIFICATIONS UNDER A SEPARATE PERMIT. SEC. 105.1 CITY
 AMENDMENTS.
 NOTE: BUILDING PERMIT WILL BE ISSUED WHEN THE DEMUCKING
 WORK IS COMPLETED AND APPROVED.
  
 RESPONSE:
 DEMUCKING PERMIT #21101015 NOT ISSUED YET. WAITING FOR
 CONTRACTOR TO PAY FEES TO PRINT PERMIT.
  
 3- OK.
  
 ORIGINAL COMMENT:
 4- ROOFING UNDERLAYMENT FL14317-R11 SUBMITTED IS
 PENDING FBC APPROVAL. NEED TO SUBMIT APPROVED PRODUCT
 APPROVAL. FAC 61G20-3.001.
 NOTE: ENGINEER OF RECORD TO REVIEW AND APPROVED BEFORE
 SUBMITTAL.
  
 RESPONSE:
 REPEAT COMMENT. NOT ADDRESSED.
  
 WHEN RESUBMITTING, A TRANSMITTAL LETTER LISTING THE
 ORIGINAL REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF
 THE REVISION MADE, IDENTIFYING THE SHEET OR
 SPECIFICATION PAGE WHERE THE CHANGES CAN BE FOUND WILL
 HELP TO EXPEDITE YOUR AUDIT. THANK YOU FOR YOUR
 ANTICIPATED COOPERATION.
  
 PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY
 QUESTIONS REGARDING THESE COMMENTS,
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2021-11-15 Cont ID  
Sent By jgomez Date 2021-11-15 Time 13:58 Rev Time 0.00
Received By jgomez Date 2021-11-15 Time 09:58 Sent To  
Notes
2021-11-15 13:59:05NEW SINGLE FAMILY RESIDENCE (R3) SECOND BUILDING AUDIT
 COMMENTS.
 CODE: FBC 7TH EDITION (2020) AND CITY AMENDMENTS.
 PERMIT #21040654
  
 ORIGINAL COMMENT:
 1- ACCORDING TO SEC. R301.2.1.4.3 FBC-RESIDENTIAL, THIS
 BUILDING IS LOCATED IN EXPOSURE "D" NOT EXPOSURE "C".
 ENGINEER OF RECORD NEEDS TO REVISE THE BUILDING
 EXPOSURE AND ALL DESIGN PRESSURES ACCORDINGLY.
 NOTE: PRODUCT APPROVALS WILL BE AUDITED ONCE DESIGN
 PRESSURES ARE REVISED.
  
 RESPONSE:
 A)ENGINEER OF RECORD DIDN'T REVISE THE DOOR AND WINDOWS
 DESIGN PRESSURES. NEED TO REVISE AS REQUIRED. SEC.
 R301.2.1.4.3 FBC-RESIDENTIAL.
  
 B)NEW COMMENTS BASED ON TRUSS PACKAGE SUBMITTED:
 (1)TRUSSES WERE DESIGNED BASED ON 2017 FBC AND ASCE
 7-10. THE CURRENT CODE IS 2020 FBC AND ASCE-7-16.
 COMPLETE TRUSS PACKAGE NEEDS TO BE REVISED.
 CHAPTER 553 F.S.
  
 (2)REVISED TRUSS PACKAGE NEEDS TO BE REVIEWED/APPROVED
 IN WRITING BY THE ENGINEER OF RECORD PRIOR TO SUBMITTAL
 TO THIS OFFICE. SEC. 107.3.4.1 CITY AMENDMENTS.
  
 ORIGINAL COMMENT:
 2- BASED ON THE SOIL REPORT SUBMITTED THERE ARE HEAVY
 ORGANICS/MUCK THROUGHOUT THE BUILDING PAD AREA. THE
 SOIL REPORT RECOMMENDATION IS TO DEMUCK THE BUILDING
 PAD AREA. A SEPARATE PERMIT IS REQUIRED TO DEMUCK THE
 BUILDING PAD AREA. CONTRACTOR TO SUBMIT PERMIT
 APPLICATION WITH COMPLETE ENGINEER'S DEMUCKING
 SPECIFICATIONS UNDER A SEPARATE PERMIT. SEC. 105.1 CITY
 AMENDMENTS.
 NOTE: BUILDING PERMIT WILL BE ISSUED WHEN THE DEMUCKING
 WORK IS COMPLETED AND APPROVED.
  
 RESPONSE:
 DEMUCKING PERMIT UNDER REVIEW. PERMIT #21101015.
  
 3- OK.
  
 ORIGINAL COMMENT:
 4- ROOFING UNDERLAYMENT FL14317-R11 SUBMITTED IS
 PENDING FBC APPROVAL. NEED TO SUBMIT APPROVED PRODUCT
 APPROVAL. FAC 61G20-3.001.
 NOTE: ENGINEER OF RECORD TO REVIEW AND APPROVED BEFORE
 SUBMITTAL.
  
 RESPONSE:
 REPEAT COMMENT. NOT ADDRESSED.
  
 5- OK. SLIDING GLASS DOOR SUBMITTED BY MISTAKE.
  
 WHEN RESUBMITTING, A TRANSMITTAL LETTER LISTING THE
 ORIGINAL REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF
 THE REVISION MADE, IDENTIFYING THE SHEET OR
 SPECIFICATION PAGE WHERE THE CHANGES CAN BE FOUND WILL
 HELP TO EXPEDITE YOUR AUDIT. THANK YOU FOR YOUR
 ANTICIPATED COOPERATION.
  
 PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY
 QUESTIONS REGARDING THESE COMMENTS,
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2021-09-08 Cont ID  
Sent By jgomez Date 2021-09-08 Time 10:29 Rev Time 0.00
Received By jgomez Date 2021-09-08 Time 10:33 Sent To  
Notes
2021-09-08 10:30:51NEW SINGLE FAMILY RESIDENCE (R3) BUILDING AUDIT
 COMMENTS.
 CODE: FBC 7TH EDITION (2020) AND CITY AMENDMENTS.
 PERMIT #21040654
  
 1- ACCORDING TO SEC. R301.2.1.4.3 FBC-RESIDENTIAL, THIS
 BUILDING IS LOCATED IN EXPOSURE "D" NOT EXPOSURE "C".
 ENGINEER OF RECORD NEEDS TO REVISE THE BUILDING
 EXPOSURE AND ALL DESIGN PRESSURES ACCORDINGLY.
 NOTE: PRODUCT APPROVALS WILL BE AUDITED ONCE DESIGN
 PRESSURES ARE REVISED.
  
 2- BASED ON THE SOIL REPORT SUBMITTED THERE ARE HEAVY
 ORGANICS/MUCK THROUGHOUT THE BUILDING PAD AREA. THE
 SOIL REPORT RECOMMENDATION IS TO DEMUCK THE BUILDING
 PAD AREA. A SEPARATE PERMIT IS REQUIRED TO DEMUCK THE
 BUILDING PAD AREA. CONTRACTOR TO SUBMIT PERMIT
 APPLICATION WITH COMPLETE ENGINEER'S DEMUCKING
 SPECIFICATIONS UNDER A SEPARATE PERMIT. SEC. 105.1 CITY
 AMENDMENTS.
 NOTE: BUILDING PERMIT WILL BE ISSUED WHEN THE DEMUCKING
 WORK IS COMPLETED AND APPROVED.
  
 3- SHEET 4-4: ROOF SHEATHING SPECIFICATIONS IS NOT
 CLEAR. NOTE LOCATED BELOW THE COMPONENT AND CLADDING
 PRESSURE ZONES CHART DOESN'T MATCH THE ROOF SHEATHING
 SPECIFICATIONS SHOWN ON THE COMPONENT AND CLADDING
 PRESSURE ZONES CHART. REVISE AS REQUIRED TO MATCH. SEC.
 107.2.1 CITY AMENDMENTS.
  
 4- ROOFING UNDERLAYMENT FL14317-R11 SUBMITTED IS
 PENDING FBC APPROVAL. NEED TO SUBMIT APPROVED PRODUCT
 APPROVAL. FAC 61G20-3.001.
 NOTE: ENGINEER OF RECORD TO REVIEW AND APPROVED BEFORE
 SUBMITTAL.
  
 5- CLARIFY WHY SUBMITTING PRODUCT APPROVAL FOR SLIDING
 GLASS DOORS IF THERE ARE NOT SLIDING GLASS DOORS IN
 THIS PROJECT?
 SEC. 1072.1 CITY AMENDMENTS.
  
 WHEN RESUBMITTING, A TRANSMITTAL LETTER LISTING THE
 ORIGINAL REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF
 THE REVISION MADE, IDENTIFYING THE SHEET OR
 SPECIFICATION PAGE WHERE THE CHANGES CAN BE FOUND WILL
 HELP TO EXPEDITE YOUR AUDIT. THANK YOU FOR YOUR
 ANTICIPATED COOPERATION.
  
 PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY
 QUESTIONS REGARDING THESE COMMENTS,
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2021-09-07 Cont ID  
Sent By jleahy Date 2021-09-07 Time 13:45 Rev Time 0.00
Received By jleahy Date 2021-09-07 Time 13:45 Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2021-09-08 Cont ID  
Sent By rrossano Date 2021-09-08 Time   Rev Time 0.00
Received By rrossano Date 2021-09-08 Time   Sent To  
Notes
2021-09-08 12:28:29PASSED WITH PROVISOS:
  
 PLEASE MAINTAIN POLLUTION CONTROL PLAN ONSITE SHOWING:
  
 A) WHERE SILT SCREENS WILL BE INSTALLED, INCLUDING A
 DETAIL SHOWING THE SILT FENCE INSTALLATION. THESE BMPS
 ARE TO BE USED AS PER THE FDEP EROSION AND SEDIMENT
 CONTROL MANUAL.
 B) SHOW THE PROTECTION OF ALL ON-SITE CATCH BASINS, IF
 ANY.
 C) SHOW PROTECTION OF ALL OFF-SITE CATCH BASINS, IF
 ANY.
 D) INCLUDE DETAILS AS TO THE TYPE OF PROTECTION USED ON
 THE CATCH BASINS, IF ANY.
 E) SHOW HOW SITE DIRT WILL NOT BE TRACKED INTO THE
 ROADS.
 F) SHOW HOW DUST CONTROL WILL BE PROVIDED.
  
 THERE ARE WATER AND SEWER LINES IN THE VICINITY OF THIS
 PROJECT. PER CHAPTER 556 OF THE FLORIDA STATE STATUTES,
 YOU MUST CALL 811 FOR UTILITY LOCATES AT LEAST TWO FULL
 BUSINESS DAYS IN ADVANCE OF ANY CONSTRUCTION OR
 DEMOLITION WORK. INFORMATION CAN BE FOUND HERE:
 HTTP://WWW.SUNSHINE811.COM/
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
  
 RICK ROSSANO, PROJECT COORDINATOR, ENGINEERING SERVICES
 DEPARTMENT
 DIRECT: (561) 494-1098, FAX: (561) 494-1116, MOBILE:
 (561) 246-9525
 EMAIL: [email protected], WWW.WPB.ORG/ENGINEERING
  
  

Review Stop I INCOMING/PROCESSING
Rev No 8 Status N Date 2022-02-01 Cont ID  
Sent By jgomez Date 2022-02-01 Time 14:40 Rev Time 0.00
Received By jgomez Date 2022-01-28 Time 16:49 Sent To I
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 7 Status N Date 2022-01-27 Cont ID  
Sent By shill Date 2022-01-27 Time 15:49 Rev Time 0.00
Received By shill Date 2022-01-21 Time 06:40 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 6 Status N Date 2022-01-15 Cont ID  
Sent By shill Date 2022-01-15 Time 07:17 Rev Time 0.00
Received By shill Date 2021-12-27 Time 16:40 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 5 Status N Date 2021-12-09 Cont ID  
Sent By jgomez Date 2021-12-09 Time 13:05 Rev Time 0.00
Received By jgomez Date 2021-12-02 Time 16:04 Sent To I
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2021-11-15 Cont ID  
Sent By jgomez Date 2021-11-15 Time 14:05 Rev Time 0.00
Received By jgomez Date 2021-11-03 Time 08:19 Sent To I
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2021-11-01 Cont ID  
Sent By shill Date 2021-11-01 Time 18:08 Rev Time 0.00
Received By shill Date 2021-10-21 Time 13:14 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2021-09-09 Cont ID  
Sent By lmarchan Date 2021-09-09 Time 09:28 Rev Time 0.00
Received By lmarchan Date 2021-08-23 Time   Sent To  
Notes
2021-08-23 19:05:41TO BLDG DIV AUDIT

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2021-08-23 Cont ID  
Sent By shill Date 2021-08-23 Time 19:04 Rev Time 0.00
Received By shill Date 2021-08-13 Time 06:02 Sent To  
Notes
***NONE***

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 2 Status P Date 2022-02-16 Cont ID  
Sent By lmarchan Date 2022-02-16 Time 08:48 Rev Time 0.00
Received By lmarchan Date 2022-02-01 Time 14:48 Sent To  
Notes
2022-02-15 10:43:17RECEIPT MU-2022-05501 - $1897.60 PAID
2022-02-01 14:49:002/1/22 EMAILED IMPACT OFFICE TO REVIEW. LEM

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 1 Status F Date 2021-09-07 Cont ID  
Sent By jgomez Date 2021-09-07 Time   Rev Time 0.00
Received By jgomez Date 2021-09-07 Time 16:22 Sent To  
Notes
2021-09-07 16:21:23IMPACT FEES
 PLANS NEED TO BE REVIEWED BY PALM BEACH COUNTY FOR
 IMPACT FEE ASSESSMENT.
 PLANS WILL BE REVIEWED BY THE PBC IMPACT FEE OFFICE
 DIGITALLY VIA PROJECTDOX UPON NOTIFICATION BY THIS
 OFFICE. NOTIFICATION MAY OCCUR WHEN PLANS ARE NEAREST
 FINAL FORM. YOU MAY COORDINATE WITH THE IMPACT FEE
 OFFICE AT (561) 233-5025 OR SIMPLY UPLOAD THE MUNICIPAL
 IMPACT FEE QUESTIONNAIRE FORM TO YOUR PROJECT AND NAME
 THE FILE MUNICIPAL IMPACT FEE QUESTIONNAIRE. THE FORM
 CAN BE FOUND AT: HTTP://DISCOVER.PBCGOV.ORG/PZB/ADMINIS
 TRATION/PDF/IMPACTFEES/FORMS/QUESTIONNAIRE.PDF UPON
 APPROVAL AND FEE PAYMENT, PLEASE UPLOAD THE RECEIPT TO
 YOUR PROJECT OR EMAIL IT TO [email protected] .
  
 PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY
 QUESTIONS REGARDING THESE COMMENTS,
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]
  
2021-07-05 11:52:19IMPACT FEES - DIGITAL SUBMITTALS
  
 PLANS WILL BE REVIEWED BY THE PBC IMPACT FEE OFFICE
 DIGITALLY VIA PROJECTDOX UPON NOTIFICATION BY THIS
 OFFICE. NOTIFICATION WILL OCCUR WHEN PLANS ARE NEAREST
 FINAL FORM. YOU MAY COORDINATE WITH THE IMPACT FEE
 OFFICE AT (561) 233-5025 OR SIMPLY UPLOAD THE MUNICIPAL
 IMPACT FEE QUESTIONNAIRE FORM TO YOUR PROJECT AND NAME
 THE FILE MUNICIPAL IMPACT FEE QUESTIONNAIRE. THE FORM
 CAN BE FOUND AT: HTTP://DISCOVER.PBCGOV.ORG/PZB/ADMINIS
 TRATION/PDF/IMPACTFEES/FORMS/QUESTIONNAIRE.PDF
  
 UPON APPROVAL AND FEE PAYMENT, PLEASE UPLOAD THE
 RECEIPT TO YOUR PROJECT OR EMAIL IT TO
 [email protected] .

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2021-09-07 Cont ID  
Sent By medwards Date 2021-09-07 Time 13:43 Rev Time 0.00
Received By medwards Date 2021-09-07 Time 12:51 Sent To  
Notes
2021-09-07 13:44:10AUDIT ONLY

Review Stop P PLUMBING
Rev No 1 Status P Date 2021-09-08 Cont ID  
Sent By lcrespo Date 2021-09-08 Time 11:03 Rev Time 0.00
Received By lcrespo Date 2021-09-08 Time 11:03 Sent To  
Notes
2021-09-08 11:04:2209/08/21 REVIEWED FOR CODE COMPLIANCE (PLUMBING)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS, OR THEIR REPRESENTATIVES
 FROM THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL,
 STATE, AND NATIONAL CODES AND STANDARDS IN EFFECT AT
 THE TIME OF PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK
 OF EVERY ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop PRIVATEPRV PRIVATE PROVIDER DOCUMENTS
Rev No 8 Status P Date 2022-02-01 Cont ID  
Sent By jgomez Date 2022-02-01 Time 14:36 Rev Time 0.00
Received By jgomez Date 2022-02-01 Time 13:54 Sent To  
Notes
***NONE***

Review Stop PRIVATEPRV PRIVATE PROVIDER DOCUMENTS
Rev No 7 Status F Date 2022-01-25 Cont ID  
Sent By medwards Date 2022-01-25 Time 14:20 Rev Time 0.00
Received By medwards Date 2022-01-25 Time 14:19 Sent To  
Notes
2022-01-25 14:37:03THE NEW PRIVATE PROVIDER PLAN REVIEW COMPLIANCE
 AFFIDAVIT SIGNED BY STEVEN KENNEDY'S DATE IS
 12/17/2022, THIS DATE IS IN THE FUTURE. PLEASE CORRECT
 THIS DATE.
  
 MICHAEL EDWARDS
 MECHANICAL EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL. 33401
 561-805-6728
 [email protected]
  

Review Stop PRIVATEPRV PRIVATE PROVIDER DOCUMENTS
Rev No 6 Status F Date 2022-01-07 Cont ID  
Sent By rmcphers Date 2022-01-07 Time 15:10 Rev Time 0.00
Received By rmcphers Date 2022-01-07 Time 15:10 Sent To  
Notes
2022-01-07 15:23:03PRIVATE PROVIDER AFFIDAVIT REVIEW
  
 CORRECTIONS NEEDED - ( PLAN REVIEW AFFIDAVIT HAS NOT
 BEEN REVISED FOR THE NEWLY ADDED DOCUMENTS TO
 PROJECTDOX)
  
 1) TRUSS ENGINEERING BY CARL FORBES HAS BEEN REVISED -
 12-21-2021 (AFFIDAVIT PROVIDED SHOWS A DATE OF
 10-18-21)
  
 2) NEWLY ADDED PRODUCT APPROVAL (FL14317 - R12) IS NOT
 LISTED ON THE PLAN REVIEW AFFIDAVIT.
  
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
  

Review Stop PRIVATEPRV PRIVATE PROVIDER DOCUMENTS
Rev No 5 Status P Date 2021-12-08 Cont ID  
Sent By rmcphers Date 2021-12-08 Time 08:17 Rev Time 0.00
Received By rmcphers Date 2021-12-08 Time 08:16 Sent To  
Notes
***NONE***

Review Stop PRIVATEPRV PRIVATE PROVIDER DOCUMENTS
Rev No 4 Status F Date 2021-11-10 Cont ID  
Sent By rmcphers Date 2021-11-10 Time 11:26 Rev Time 0.00
Received By rmcphers Date 2021-11-10 Time 11:26 Sent To  
Notes
2021-11-10 11:29:32PRIVATE PROVIDER REVIEW
  
 1) PLEASE PROVIDE A QUALIFICATION STATEMENT/RESUME PER
 FS 553.791 (4) (B)
 2) PLEASE PROVIDE A CERTIFICATE OF INSURANCE PER FS
 553.791 (4) (B)
 3) PLEASE PROVIDE COPY OF INSPECTOR LICENSES PER FS
 553.791 (3)
 4) THE PLAN REVIEW AFFIDAVIT PROVIDED DOES NOT LIST NOA
 20-0729.06, DRAWING 4 OF 4 REV. 9/9/21, C-1 DRANAGE
 PLAN.
  
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
  

Review Stop PRIVATEPRV PRIVATE PROVIDER DOCUMENTS
Rev No 3 Status F Date 2021-11-01 Cont ID  
Sent By shill Date 2021-11-01 Time 18:06 Rev Time 0.00
Received By shill Date 2021-11-01 Time 18:06 Sent To  
Notes
2021-11-01 18:08:50AFFIDAVIT NOT CONSISTENT WITH THE PLANS UPLOADED. FOR
 INSTANCE, AFFIDAVIT REFERS TO SHEET 1-4 DATED 4/7/2021,
 BUT SHEET 1-4 HAS A REVISION DATED 9/9/2021. CHECK ALL,
 REVISE AFFIDAVIT.
  
  

Review Stop PRIVATEPRV PRIVATE PROVIDER DOCUMENTS
Rev No 2 Status F Date 2021-09-10 Cont ID  
Sent By rgathrig Date 2021-09-10 Time 13:56 Rev Time 0.00
Received By rgathrig Date 2021-09-10 Time 13:56 Sent To  
Notes
2021-09-10 13:56:39PRIVATE PROVIDER REVIEW FAILED
 PLEASE SEE THE LIST BELOW FOR THE DIFFERENCE BETWEEN
 THE CODE COMPLIANCE AFFIDAVIT AND THE DOCUMENTS
 SUBMITTED FOR PERMITTING
 ? SHEET 1-4,2-4, 3-4,4-4 ARE DATE 2021.04.07, AFFIDAVIT
 HAS PLANS DATED APRIL 2021
 ? C-1 DRAINAGE PLAN DATED 2021.04.07, AFFIDAVIT HAS
 PLAN DATED 4/2/2021
 ? NOA 20-0729.06 IS NOT LISTED ON PLAN REVIEW
 COMPLIANCE AFFIDAVIT
 ? SURVEY DATED 2021.06.07, AFFIDAVIT HAS SURVEY DATED
 2021. 06.07
 RICHARD GATHRIGHT
 ASSISTANT BUILDING OFFICIAL
  
  

Review Stop PRIVATEPRV PRIVATE PROVIDER DOCUMENTS
Rev No 1 Status F Date 2021-06-08 Cont ID  
Sent By dbattles Date 2021-06-08 Time 13:54 Rev Time 0.00
Received By dbattles Date 2021-06-08 Time 13:54 Sent To  
Notes
2021-06-08 13:55:11REVIEW TO BE COMPLETED AFTER FINAL AFFIDAVIT OF
 COMPLIANCE IS PROVIDED.

Review Stop R ROOF PLAN REVIEW
Rev No 4 Status P Date 2022-02-01 Cont ID  
Sent By jgomez Date 2022-02-01 Time 14:36 Rev Time 0.00
Received By jgomez Date 2022-02-01 Time 14:36 Sent To  
Notes
2022-02-01 14:37:22ROOFING AUDIT OK. JG.
  
  

Review Stop R ROOF PLAN REVIEW
Rev No 3 Status F Date 2021-12-09 Cont ID  
Sent By jgomez Date 2021-12-09 Time 13:07 Rev Time 0.00
Received By jgomez Date 2021-12-09 Time 13:07 Sent To  
Notes
2021-12-09 13:07:53ROOFING THIRD AUDIT.
  
 1- ROOFING UNDERLAYMENT FL14317-R11 SUBMITTED IS
 PENDING FBC APPROVAL. NEED TO SUBMIT APPROVED PRODUCT
 APPROVAL. FAC 61G20-3.001.
 NOTE: ENGINEER OF RECORD TO REVIEW AND APPROVED BEFORE
 SUBMITTAL.
  
  
 PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY
 QUESTIONS REGARDING THESE COMMENTS,
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]

Review Stop R ROOF PLAN REVIEW
Rev No 2 Status F Date 2021-11-15 Cont ID  
Sent By jgomez Date 2021-11-15 Time 14:01 Rev Time 0.00
Received By jgomez Date 2021-11-15 Time 14:01 Sent To  
Notes
2021-11-15 14:02:05ROOFING SECOND AUDIT.
  
 1- ROOFING UNDERLAYMENT FL14317-R11 SUBMITTED IS
 PENDING FBC APPROVAL. NEED TO SUBMIT APPROVED PRODUCT
 APPROVAL. FAC 61G20-3.001.
 NOTE: ENGINEER OF RECORD TO REVIEW AND APPROVED BEFORE
 SUBMITTAL.
  
  
 PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY
 QUESTIONS REGARDING THESE COMMENTS,
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status F Date 2021-09-08 Cont ID  
Sent By jgomez Date 2021-09-08 Time 10:33 Rev Time 0.00
Received By jgomez Date 2021-09-08 Time 10:33 Sent To  
Notes
2021-09-08 10:34:45ROOFING AUDIT.
  
 1- ROOFING UNDERLAYMENT FL14317-R11 SUBMITTED IS
 PENDING FBC APPROVAL. NEED TO SUBMIT APPROVED PRODUCT
 APPROVAL. FAC 61G20-3.001.
 NOTE: ENGINEER OF RECORD TO REVIEW AND APPROVED BEFORE
 SUBMITTAL.
  
  
 PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY
 QUESTIONS REGARDING THESE COMMENTS,
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 6 Status P Date 2022-02-03 Cont ID  
Sent By jgomez Date 2022-02-03 Time 10:01 Rev Time 0.00
Received By jgomez Date 2022-02-03 Time 09:39 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 5 Status F Date 2022-02-02 Cont ID  
Sent By jgomez Date 2022-02-02 Time 11:23 Rev Time 0.00
Received By jgomez Date 2022-02-02 Time 11:21 Sent To  
Notes
2022-02-02 11:22:49FIFTH SIGNATURE REVIEW COMMENTS:
  
 ORIGINAL COMMENT:
 1- SOIL TEST REPORT NEEDS THE ORIGINAL SEAL AND
 SIGNATURE OF THE ENGINEER AS REQUIRED BY CHAPTER 471
 FLORIDA STATUTES WHEN SUBMITTING DOCUMENTS/PLANS FOR
 PUBLIC RECORDS.
 SUBMIT DRAWINGS ELECTRONICALLY WITH ENGINEER'S DIGITAL
 SIGNATURE OR PROVIDE HARD COPY WITH ENGINEER'S ORIGINAL
 SEAL AND SIGNATURE.
  
 RESPONSE:
 SOIL TEST REPORT EMAILED BY JOHN E. NIESMAN (J.D.C.
 DEVELOPMENT SERVICES, INC.) DOESN'T HAVE A DIGITAL
 SIGNATURE. REPORT SUBMITTED IS A COPY OF HARD COPY
 REPORT PHYSICALLY SIGNED AND SEALED BY THE ENGINEER.
 SUBMIT DRAWINGS ELECTRONICALLY WITH ENGINEER'S DIGITAL
 SIGNATURE OR PROVIDE HARD COPY WITH ENGINEER'S ORIGINAL
 SEAL AND SIGNATURE.
  
 PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY
 QUESTIONS REGARDING THESE COMMENTS,
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 4 Status F Date 2022-02-01 Cont ID  
Sent By jgomez Date 2022-02-01 Time 14:37 Rev Time 0.00
Received By jgomez Date 2022-02-01 Time 14:37 Sent To  
Notes
2022-02-01 14:39:13FOURTH SIGNATURE REVIEW COMMENTS:
  
 ORIGINAL COMMENT:
 1- SOIL TEST REPORT NEEDS THE ORIGINAL SEAL AND
 SIGNATURE OF THE ENGINEER AS REQUIRED BY CHAPTER 471
 FLORIDA STATUTES WHEN SUBMITTING DOCUMENTS/PLANS FOR
 PUBLIC RECORDS.
 SUBMIT DRAWINGS ELECTRONICALLY WITH ENGINEER'S DIGITAL
 SIGNATURE OR PROVIDE HARD COPY WITH ENGINEER'S ORIGINAL
 SEAL AND SIGNATURE.
  
 RESPONSE:
 REPEAT COMMENT. NOT ADDRESSED.
  
 PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY
 QUESTIONS REGARDING THESE COMMENTS,
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status F Date 2021-12-09 Cont ID  
Sent By jgomez Date 2021-12-09 Time 13:08 Rev Time 0.00
Received By jgomez Date 2021-12-09 Time 13:08 Sent To  
Notes
2021-12-09 13:08:40THIRD SIGNATURE REVIEW COMMENTS:
  
 ORIGINAL COMMENT:
 1- SOIL TEST REPORT NEEDS THE ORIGINAL SEAL AND
 SIGNATURE OF THE ENGINEER AS REQUIRED BY CHAPTER 471
 FLORIDA STATUTES WHEN SUBMITTING DOCUMENTS/PLANS FOR
 PUBLIC RECORDS.
 SUBMIT DRAWINGS ELECTRONICALLY WITH ENGINEER'S DIGITAL
 SIGNATURE OR PROVIDE HARD COPY WITH ENGINEER'S ORIGINAL
 SEAL AND SIGNATURE.
  
 RESPONSE:
 REPEAT COMMENT. NOT ADDRESSED.
  
 PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY
 QUESTIONS REGARDING THESE COMMENTS,
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status F Date 2021-11-15 Cont ID  
Sent By jgomez Date 2021-11-15 Time 14:02 Rev Time 0.00
Received By jgomez Date 2021-11-15 Time 14:02 Sent To  
Notes
2021-11-15 14:03:40SECOND SIGNATURE REVIEW COMMENTS:
  
 ORIGINAL COMMENT:
 1- SOIL TEST REPORT NEEDS THE ORIGINAL SEAL AND
 SIGNATURE OF THE ENGINEER AS REQUIRED BY CHAPTER 471
 FLORIDA STATUTES WHEN SUBMITTING DOCUMENTS/PLANS FOR
 PUBLIC RECORDS.
 SUBMIT DRAWINGS ELECTRONICALLY WITH ENGINEER'S DIGITAL
 SIGNATURE OR PROVIDE HARD COPY WITH ENGINEER'S ORIGINAL
 SEAL AND SIGNATURE.
  
 RESPONSE:
 REPEAT COMMENT. NOT ADDRESSED.
  
 PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY
 QUESTIONS REGARDING THESE COMMENTS,
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2021-09-08 Cont ID  
Sent By jgomez Date 2021-09-08 Time 10:49 Rev Time 0.00
Received By jgomez Date 2021-09-08 Time 10:37 Sent To  
Notes
2021-09-08 10:39:43SIGNATURE REVIEW COMMENTS:
  
 1- SOIL TEST REPORT NEEDS THE ORIGINAL SEAL AND
 SIGNATURE OF THE ENGINEER AS REQUIRED BY CHAPTER 471
 FLORIDA STATUTES WHEN SUBMITTING DOCUMENTS/PLANS FOR
 PUBLIC RECORDS.
 SUBMIT DRAWINGS ELECTRONICALLY WITH ENGINEER'S DIGITAL
 SIGNATURE OR PROVIDE HARD COPY WITH ENGINEER'S ORIGINAL
 SEAL AND SIGNATURE.
  
 PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY
 QUESTIONS REGARDING THESE COMMENTS,
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]

Review Stop Z ZONING
Rev No 1 Status P Date 2021-08-23 Cont ID  
Sent By awooten Date 2021-08-23 Time   Rev Time  
Received By awooten Date 2021-08-23 Time   Sent To  
Notes
***NONE***