Plan Review Stops For Permit 21040654 |
Review Stop |
AD |
ADDRESSING |
Rev No |
1 |
Status |
P |
Date |
2021-04-19 |
|
|
Cont ID |
|
Sent By |
cpuell |
Date |
2021-04-19 |
Time |
10:44 |
Rev Time |
0.00 |
Received By |
cpuell |
Date |
2021-04-19 |
Time |
10:44 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
4 |
Status |
P |
Date |
2022-02-01 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2022-02-01 |
Time |
14:35 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2022-02-01 |
Time |
13:58 |
Sent To |
|
|
Notes |
2022-02-01 14:36:14 | BUILDING AUDIT OK. JG. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
F |
Date |
2021-12-09 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2021-12-09 |
Time |
13:04 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2021-12-09 |
Time |
09:43 |
Sent To |
|
|
Notes |
2021-12-09 13:04:28 | NEW SINGLE FAMILY RESIDENCE (R3) THIRD BUILDING AUDIT | | COMMENTS. | | CODE: FBC 7TH EDITION (2020) AND CITY AMENDMENTS. | | PERMIT #21040654 | | | | ORIGINAL COMMENT: | | 1- ACCORDING TO SEC. R301.2.1.4.3 FBC-RESIDENTIAL, THIS | | BUILDING IS LOCATED IN EXPOSURE "D" NOT EXPOSURE "C". | | ENGINEER OF RECORD NEEDS TO REVISE THE BUILDING | | EXPOSURE AND ALL DESIGN PRESSURES ACCORDINGLY. | | NOTE: PRODUCT APPROVALS WILL BE AUDITED ONCE DESIGN | | PRESSURES ARE REVISED. | | | | RESPONSE: | | A)OK | | | | B)TRUSS PACKAGE SUBMITTED: | | (1)TRUSSES WERE DESIGNED BASED ON 2017 FBC AND ASCE | | 7-10. THE CURRENT CODE IS 2020 FBC AND ASCE-7-16. | | COMPLETE TRUSS PACKAGE NEEDS TO BE REVISED. | | CHAPTER 553 F.S. | | | | RESPONSE: | | TRUSS PACKAGE COVER PAGE WAS NOT REVISED. | | | | | | ORIGINAL COMMENT: | | 2- BASED ON THE SOIL REPORT SUBMITTED THERE ARE HEAVY | | ORGANICS/MUCK THROUGHOUT THE BUILDING PAD AREA. THE | | SOIL REPORT RECOMMENDATION IS TO DEMUCK THE BUILDING | | PAD AREA. A SEPARATE PERMIT IS REQUIRED TO DEMUCK THE | | BUILDING PAD AREA. CONTRACTOR TO SUBMIT PERMIT | | APPLICATION WITH COMPLETE ENGINEER'S DEMUCKING | | SPECIFICATIONS UNDER A SEPARATE PERMIT. SEC. 105.1 CITY | | AMENDMENTS. | | NOTE: BUILDING PERMIT WILL BE ISSUED WHEN THE DEMUCKING | | WORK IS COMPLETED AND APPROVED. | | | | RESPONSE: | | DEMUCKING PERMIT #21101015 NOT ISSUED YET. WAITING FOR | | CONTRACTOR TO PAY FEES TO PRINT PERMIT. | | | | 3- OK. | | | | ORIGINAL COMMENT: | | 4- ROOFING UNDERLAYMENT FL14317-R11 SUBMITTED IS | | PENDING FBC APPROVAL. NEED TO SUBMIT APPROVED PRODUCT | | APPROVAL. FAC 61G20-3.001. | | NOTE: ENGINEER OF RECORD TO REVIEW AND APPROVED BEFORE | | SUBMITTAL. | | | | RESPONSE: | | REPEAT COMMENT. NOT ADDRESSED. | | | | WHEN RESUBMITTING, A TRANSMITTAL LETTER LISTING THE | | ORIGINAL REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF | | THE REVISION MADE, IDENTIFYING THE SHEET OR | | SPECIFICATION PAGE WHERE THE CHANGES CAN BE FOUND WILL | | HELP TO EXPEDITE YOUR AUDIT. THANK YOU FOR YOUR | | ANTICIPATED COOPERATION. | | | | PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY | | QUESTIONS REGARDING THESE COMMENTS, | | JULIO GOMEZ | | COMMERCIAL COMBINATION PLANS EXAMINER | | DEVELOPMENT SERVICES DEPARTMENT | | BUILDING DIVISION | | (561)805-6712 | | [email protected] |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
F |
Date |
2021-11-15 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2021-11-15 |
Time |
13:58 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2021-11-15 |
Time |
09:58 |
Sent To |
|
|
Notes |
2021-11-15 13:59:05 | NEW SINGLE FAMILY RESIDENCE (R3) SECOND BUILDING AUDIT | | COMMENTS. | | CODE: FBC 7TH EDITION (2020) AND CITY AMENDMENTS. | | PERMIT #21040654 | | | | ORIGINAL COMMENT: | | 1- ACCORDING TO SEC. R301.2.1.4.3 FBC-RESIDENTIAL, THIS | | BUILDING IS LOCATED IN EXPOSURE "D" NOT EXPOSURE "C". | | ENGINEER OF RECORD NEEDS TO REVISE THE BUILDING | | EXPOSURE AND ALL DESIGN PRESSURES ACCORDINGLY. | | NOTE: PRODUCT APPROVALS WILL BE AUDITED ONCE DESIGN | | PRESSURES ARE REVISED. | | | | RESPONSE: | | A)ENGINEER OF RECORD DIDN'T REVISE THE DOOR AND WINDOWS | | DESIGN PRESSURES. NEED TO REVISE AS REQUIRED. SEC. | | R301.2.1.4.3 FBC-RESIDENTIAL. | | | | B)NEW COMMENTS BASED ON TRUSS PACKAGE SUBMITTED: | | (1)TRUSSES WERE DESIGNED BASED ON 2017 FBC AND ASCE | | 7-10. THE CURRENT CODE IS 2020 FBC AND ASCE-7-16. | | COMPLETE TRUSS PACKAGE NEEDS TO BE REVISED. | | CHAPTER 553 F.S. | | | | (2)REVISED TRUSS PACKAGE NEEDS TO BE REVIEWED/APPROVED | | IN WRITING BY THE ENGINEER OF RECORD PRIOR TO SUBMITTAL | | TO THIS OFFICE. SEC. 107.3.4.1 CITY AMENDMENTS. | | | | ORIGINAL COMMENT: | | 2- BASED ON THE SOIL REPORT SUBMITTED THERE ARE HEAVY | | ORGANICS/MUCK THROUGHOUT THE BUILDING PAD AREA. THE | | SOIL REPORT RECOMMENDATION IS TO DEMUCK THE BUILDING | | PAD AREA. A SEPARATE PERMIT IS REQUIRED TO DEMUCK THE | | BUILDING PAD AREA. CONTRACTOR TO SUBMIT PERMIT | | APPLICATION WITH COMPLETE ENGINEER'S DEMUCKING | | SPECIFICATIONS UNDER A SEPARATE PERMIT. SEC. 105.1 CITY | | AMENDMENTS. | | NOTE: BUILDING PERMIT WILL BE ISSUED WHEN THE DEMUCKING | | WORK IS COMPLETED AND APPROVED. | | | | RESPONSE: | | DEMUCKING PERMIT UNDER REVIEW. PERMIT #21101015. | | | | 3- OK. | | | | ORIGINAL COMMENT: | | 4- ROOFING UNDERLAYMENT FL14317-R11 SUBMITTED IS | | PENDING FBC APPROVAL. NEED TO SUBMIT APPROVED PRODUCT | | APPROVAL. FAC 61G20-3.001. | | NOTE: ENGINEER OF RECORD TO REVIEW AND APPROVED BEFORE | | SUBMITTAL. | | | | RESPONSE: | | REPEAT COMMENT. NOT ADDRESSED. | | | | 5- OK. SLIDING GLASS DOOR SUBMITTED BY MISTAKE. | | | | WHEN RESUBMITTING, A TRANSMITTAL LETTER LISTING THE | | ORIGINAL REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF | | THE REVISION MADE, IDENTIFYING THE SHEET OR | | SPECIFICATION PAGE WHERE THE CHANGES CAN BE FOUND WILL | | HELP TO EXPEDITE YOUR AUDIT. THANK YOU FOR YOUR | | ANTICIPATED COOPERATION. | | | | PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY | | QUESTIONS REGARDING THESE COMMENTS, | | JULIO GOMEZ | | COMMERCIAL COMBINATION PLANS EXAMINER | | DEVELOPMENT SERVICES DEPARTMENT | | BUILDING DIVISION | | (561)805-6712 | | [email protected] |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2021-09-08 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2021-09-08 |
Time |
10:29 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2021-09-08 |
Time |
10:33 |
Sent To |
|
|
Notes |
2021-09-08 10:30:51 | NEW SINGLE FAMILY RESIDENCE (R3) BUILDING AUDIT | | COMMENTS. | | CODE: FBC 7TH EDITION (2020) AND CITY AMENDMENTS. | | PERMIT #21040654 | | | | 1- ACCORDING TO SEC. R301.2.1.4.3 FBC-RESIDENTIAL, THIS | | BUILDING IS LOCATED IN EXPOSURE "D" NOT EXPOSURE "C". | | ENGINEER OF RECORD NEEDS TO REVISE THE BUILDING | | EXPOSURE AND ALL DESIGN PRESSURES ACCORDINGLY. | | NOTE: PRODUCT APPROVALS WILL BE AUDITED ONCE DESIGN | | PRESSURES ARE REVISED. | | | | 2- BASED ON THE SOIL REPORT SUBMITTED THERE ARE HEAVY | | ORGANICS/MUCK THROUGHOUT THE BUILDING PAD AREA. THE | | SOIL REPORT RECOMMENDATION IS TO DEMUCK THE BUILDING | | PAD AREA. A SEPARATE PERMIT IS REQUIRED TO DEMUCK THE | | BUILDING PAD AREA. CONTRACTOR TO SUBMIT PERMIT | | APPLICATION WITH COMPLETE ENGINEER'S DEMUCKING | | SPECIFICATIONS UNDER A SEPARATE PERMIT. SEC. 105.1 CITY | | AMENDMENTS. | | NOTE: BUILDING PERMIT WILL BE ISSUED WHEN THE DEMUCKING | | WORK IS COMPLETED AND APPROVED. | | | | 3- SHEET 4-4: ROOF SHEATHING SPECIFICATIONS IS NOT | | CLEAR. NOTE LOCATED BELOW THE COMPONENT AND CLADDING | | PRESSURE ZONES CHART DOESN'T MATCH THE ROOF SHEATHING | | SPECIFICATIONS SHOWN ON THE COMPONENT AND CLADDING | | PRESSURE ZONES CHART. REVISE AS REQUIRED TO MATCH. SEC. | | 107.2.1 CITY AMENDMENTS. | | | | 4- ROOFING UNDERLAYMENT FL14317-R11 SUBMITTED IS | | PENDING FBC APPROVAL. NEED TO SUBMIT APPROVED PRODUCT | | APPROVAL. FAC 61G20-3.001. | | NOTE: ENGINEER OF RECORD TO REVIEW AND APPROVED BEFORE | | SUBMITTAL. | | | | 5- CLARIFY WHY SUBMITTING PRODUCT APPROVAL FOR SLIDING | | GLASS DOORS IF THERE ARE NOT SLIDING GLASS DOORS IN | | THIS PROJECT? | | SEC. 1072.1 CITY AMENDMENTS. | | | | WHEN RESUBMITTING, A TRANSMITTAL LETTER LISTING THE | | ORIGINAL REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF | | THE REVISION MADE, IDENTIFYING THE SHEET OR | | SPECIFICATION PAGE WHERE THE CHANGES CAN BE FOUND WILL | | HELP TO EXPEDITE YOUR AUDIT. THANK YOU FOR YOUR | | ANTICIPATED COOPERATION. | | | | PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY | | QUESTIONS REGARDING THESE COMMENTS, | | JULIO GOMEZ | | COMMERCIAL COMBINATION PLANS EXAMINER | | DEVELOPMENT SERVICES DEPARTMENT | | BUILDING DIVISION | | (561)805-6712 | | [email protected] |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2021-09-07 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2021-09-07 |
Time |
13:45 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2021-09-07 |
Time |
13:45 |
Sent To |
|
|
Notes |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
1 |
Status |
P |
Date |
2021-09-08 |
|
|
Cont ID |
|
Sent By |
rrossano |
Date |
2021-09-08 |
Time |
|
Rev Time |
0.00 |
Received By |
rrossano |
Date |
2021-09-08 |
Time |
|
Sent To |
|
|
Notes |
2021-09-08 12:28:29 | PASSED WITH PROVISOS: | | | | PLEASE MAINTAIN POLLUTION CONTROL PLAN ONSITE SHOWING: | | | | A) WHERE SILT SCREENS WILL BE INSTALLED, INCLUDING A | | DETAIL SHOWING THE SILT FENCE INSTALLATION. THESE BMPS | | ARE TO BE USED AS PER THE FDEP EROSION AND SEDIMENT | | CONTROL MANUAL. | | B) SHOW THE PROTECTION OF ALL ON-SITE CATCH BASINS, IF | | ANY. | | C) SHOW PROTECTION OF ALL OFF-SITE CATCH BASINS, IF | | ANY. | | D) INCLUDE DETAILS AS TO THE TYPE OF PROTECTION USED ON | | THE CATCH BASINS, IF ANY. | | E) SHOW HOW SITE DIRT WILL NOT BE TRACKED INTO THE | | ROADS. | | F) SHOW HOW DUST CONTROL WILL BE PROVIDED. | | | | THERE ARE WATER AND SEWER LINES IN THE VICINITY OF THIS | | PROJECT. PER CHAPTER 556 OF THE FLORIDA STATE STATUTES, | | YOU MUST CALL 811 FOR UTILITY LOCATES AT LEAST TWO FULL | | BUSINESS DAYS IN ADVANCE OF ANY CONSTRUCTION OR | | DEMOLITION WORK. INFORMATION CAN BE FOUND HERE: | | HTTP://WWW.SUNSHINE811.COM/ | | | | FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR | | CONCERNS, THANKS. | | | | RICK ROSSANO, PROJECT COORDINATOR, ENGINEERING SERVICES | | DEPARTMENT | | DIRECT: (561) 494-1098, FAX: (561) 494-1116, MOBILE: | | (561) 246-9525 | | EMAIL: [email protected], WWW.WPB.ORG/ENGINEERING | | | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
8 |
Status |
N |
Date |
2022-02-01 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2022-02-01 |
Time |
14:40 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2022-01-28 |
Time |
16:49 |
Sent To |
I |
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
7 |
Status |
N |
Date |
2022-01-27 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2022-01-27 |
Time |
15:49 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2022-01-21 |
Time |
06:40 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
6 |
Status |
N |
Date |
2022-01-15 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2022-01-15 |
Time |
07:17 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2021-12-27 |
Time |
16:40 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
5 |
Status |
N |
Date |
2021-12-09 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2021-12-09 |
Time |
13:05 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2021-12-02 |
Time |
16:04 |
Sent To |
I |
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
4 |
Status |
N |
Date |
2021-11-15 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2021-11-15 |
Time |
14:05 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2021-11-03 |
Time |
08:19 |
Sent To |
I |
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2021-11-01 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2021-11-01 |
Time |
18:08 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2021-10-21 |
Time |
13:14 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2021-09-09 |
|
|
Cont ID |
|
Sent By |
lmarchan |
Date |
2021-09-09 |
Time |
09:28 |
Rev Time |
0.00 |
Received By |
lmarchan |
Date |
2021-08-23 |
Time |
|
Sent To |
|
|
Notes |
2021-08-23 19:05:41 | TO BLDG DIV AUDIT |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2021-08-23 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2021-08-23 |
Time |
19:04 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2021-08-13 |
Time |
06:02 |
Sent To |
|
|
Notes |
|
|
Review Stop |
IMPACT |
COUNTY IMPACT FEES |
Rev No |
2 |
Status |
P |
Date |
2022-02-16 |
|
|
Cont ID |
|
Sent By |
lmarchan |
Date |
2022-02-16 |
Time |
08:48 |
Rev Time |
0.00 |
Received By |
lmarchan |
Date |
2022-02-01 |
Time |
14:48 |
Sent To |
|
|
Notes |
2022-02-15 10:43:17 | RECEIPT MU-2022-05501 - $1897.60 PAID | 2022-02-01 14:49:00 | 2/1/22 EMAILED IMPACT OFFICE TO REVIEW. LEM |
|
|
Review Stop |
IMPACT |
COUNTY IMPACT FEES |
Rev No |
1 |
Status |
F |
Date |
2021-09-07 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2021-09-07 |
Time |
|
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2021-09-07 |
Time |
16:22 |
Sent To |
|
|
Notes |
2021-09-07 16:21:23 | IMPACT FEES | | PLANS NEED TO BE REVIEWED BY PALM BEACH COUNTY FOR | | IMPACT FEE ASSESSMENT. | | PLANS WILL BE REVIEWED BY THE PBC IMPACT FEE OFFICE | | DIGITALLY VIA PROJECTDOX UPON NOTIFICATION BY THIS | | OFFICE. NOTIFICATION MAY OCCUR WHEN PLANS ARE NEAREST | | FINAL FORM. YOU MAY COORDINATE WITH THE IMPACT FEE | | OFFICE AT (561) 233-5025 OR SIMPLY UPLOAD THE MUNICIPAL | | IMPACT FEE QUESTIONNAIRE FORM TO YOUR PROJECT AND NAME | | THE FILE MUNICIPAL IMPACT FEE QUESTIONNAIRE. THE FORM | | CAN BE FOUND AT: HTTP://DISCOVER.PBCGOV.ORG/PZB/ADMINIS | | TRATION/PDF/IMPACTFEES/FORMS/QUESTIONNAIRE.PDF UPON | | APPROVAL AND FEE PAYMENT, PLEASE UPLOAD THE RECEIPT TO | | YOUR PROJECT OR EMAIL IT TO [email protected] . | | | | PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY | | QUESTIONS REGARDING THESE COMMENTS, | | JULIO GOMEZ | | COMMERCIAL COMBINATION PLANS EXAMINER | | DEVELOPMENT SERVICES DEPARTMENT | | BUILDING DIVISION | | (561)805-6712 | | [email protected] | | | 2021-07-05 11:52:19 | IMPACT FEES - DIGITAL SUBMITTALS | | | | PLANS WILL BE REVIEWED BY THE PBC IMPACT FEE OFFICE | | DIGITALLY VIA PROJECTDOX UPON NOTIFICATION BY THIS | | OFFICE. NOTIFICATION WILL OCCUR WHEN PLANS ARE NEAREST | | FINAL FORM. YOU MAY COORDINATE WITH THE IMPACT FEE | | OFFICE AT (561) 233-5025 OR SIMPLY UPLOAD THE MUNICIPAL | | IMPACT FEE QUESTIONNAIRE FORM TO YOUR PROJECT AND NAME | | THE FILE MUNICIPAL IMPACT FEE QUESTIONNAIRE. THE FORM | | CAN BE FOUND AT: HTTP://DISCOVER.PBCGOV.ORG/PZB/ADMINIS | | TRATION/PDF/IMPACTFEES/FORMS/QUESTIONNAIRE.PDF | | | | UPON APPROVAL AND FEE PAYMENT, PLEASE UPLOAD THE | | RECEIPT TO YOUR PROJECT OR EMAIL IT TO | | [email protected] . |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
1 |
Status |
P |
Date |
2021-09-07 |
|
|
Cont ID |
|
Sent By |
medwards |
Date |
2021-09-07 |
Time |
13:43 |
Rev Time |
0.00 |
Received By |
medwards |
Date |
2021-09-07 |
Time |
12:51 |
Sent To |
|
|
Notes |
2021-09-07 13:44:10 | AUDIT ONLY |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
P |
Date |
2021-09-08 |
|
|
Cont ID |
|
Sent By |
lcrespo |
Date |
2021-09-08 |
Time |
11:03 |
Rev Time |
0.00 |
Received By |
lcrespo |
Date |
2021-09-08 |
Time |
11:03 |
Sent To |
|
|
Notes |
2021-09-08 11:04:22 | 09/08/21 REVIEWED FOR CODE COMPLIANCE (PLUMBING) | | | | BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE | | COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN | | PROFESSIONAL, CONTRACTORS, OR THEIR REPRESENTATIVES | | FROM THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, | | STATE, AND NATIONAL CODES AND STANDARDS IN EFFECT AT | | THE TIME OF PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK | | OF EVERY ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM | | REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES | | / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO | | AVOID VOIDING OF THE PERMIT. | | | | LUIS A. CRESPO | | PLUMBING PLAN EXAMINER / INSPECTOR | | EMAIL: [email protected] OFFICE: 561 805-6720 | | |
|
|
Review Stop |
PRIVATEPRV |
PRIVATE PROVIDER DOCUMENTS |
Rev No |
8 |
Status |
P |
Date |
2022-02-01 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2022-02-01 |
Time |
14:36 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2022-02-01 |
Time |
13:54 |
Sent To |
|
|
Notes |
|
|
Review Stop |
PRIVATEPRV |
PRIVATE PROVIDER DOCUMENTS |
Rev No |
7 |
Status |
F |
Date |
2022-01-25 |
|
|
Cont ID |
|
Sent By |
medwards |
Date |
2022-01-25 |
Time |
14:20 |
Rev Time |
0.00 |
Received By |
medwards |
Date |
2022-01-25 |
Time |
14:19 |
Sent To |
|
|
Notes |
2022-01-25 14:37:03 | THE NEW PRIVATE PROVIDER PLAN REVIEW COMPLIANCE | | AFFIDAVIT SIGNED BY STEVEN KENNEDY'S DATE IS | | 12/17/2022, THIS DATE IS IN THE FUTURE. PLEASE CORRECT | | THIS DATE. | | | | MICHAEL EDWARDS | | MECHANICAL EXAMINER | | 401 CLEMATIS STREET | | WEST PALM BEACH FL. 33401 | | 561-805-6728 | | [email protected] | | |
|
|
Review Stop |
PRIVATEPRV |
PRIVATE PROVIDER DOCUMENTS |
Rev No |
6 |
Status |
F |
Date |
2022-01-07 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2022-01-07 |
Time |
15:10 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2022-01-07 |
Time |
15:10 |
Sent To |
|
|
Notes |
2022-01-07 15:23:03 | PRIVATE PROVIDER AFFIDAVIT REVIEW | | | | CORRECTIONS NEEDED - ( PLAN REVIEW AFFIDAVIT HAS NOT | | BEEN REVISED FOR THE NEWLY ADDED DOCUMENTS TO | | PROJECTDOX) | | | | 1) TRUSS ENGINEERING BY CARL FORBES HAS BEEN REVISED - | | 12-21-2021 (AFFIDAVIT PROVIDED SHOWS A DATE OF | | 10-18-21) | | | | 2) NEWLY ADDED PRODUCT APPROVAL (FL14317 - R12) IS NOT | | LISTED ON THE PLAN REVIEW AFFIDAVIT. | | | | REVIEWED BY ROGER MCPHERSON | | 561-805-6716 | | [email protected] | | |
|
|
Review Stop |
PRIVATEPRV |
PRIVATE PROVIDER DOCUMENTS |
Rev No |
5 |
Status |
P |
Date |
2021-12-08 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2021-12-08 |
Time |
08:17 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2021-12-08 |
Time |
08:16 |
Sent To |
|
|
Notes |
|
|
Review Stop |
PRIVATEPRV |
PRIVATE PROVIDER DOCUMENTS |
Rev No |
4 |
Status |
F |
Date |
2021-11-10 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2021-11-10 |
Time |
11:26 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2021-11-10 |
Time |
11:26 |
Sent To |
|
|
Notes |
2021-11-10 11:29:32 | PRIVATE PROVIDER REVIEW | | | | 1) PLEASE PROVIDE A QUALIFICATION STATEMENT/RESUME PER | | FS 553.791 (4) (B) | | 2) PLEASE PROVIDE A CERTIFICATE OF INSURANCE PER FS | | 553.791 (4) (B) | | 3) PLEASE PROVIDE COPY OF INSPECTOR LICENSES PER FS | | 553.791 (3) | | 4) THE PLAN REVIEW AFFIDAVIT PROVIDED DOES NOT LIST NOA | | 20-0729.06, DRAWING 4 OF 4 REV. 9/9/21, C-1 DRANAGE | | PLAN. | | | | REVIEWED BY ROGER MCPHERSON | | 561-805-6716 | | [email protected] | | |
|
|
Review Stop |
PRIVATEPRV |
PRIVATE PROVIDER DOCUMENTS |
Rev No |
3 |
Status |
F |
Date |
2021-11-01 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2021-11-01 |
Time |
18:06 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2021-11-01 |
Time |
18:06 |
Sent To |
|
|
Notes |
2021-11-01 18:08:50 | AFFIDAVIT NOT CONSISTENT WITH THE PLANS UPLOADED. FOR | | INSTANCE, AFFIDAVIT REFERS TO SHEET 1-4 DATED 4/7/2021, | | BUT SHEET 1-4 HAS A REVISION DATED 9/9/2021. CHECK ALL, | | REVISE AFFIDAVIT. | | | | |
|
|
Review Stop |
PRIVATEPRV |
PRIVATE PROVIDER DOCUMENTS |
Rev No |
2 |
Status |
F |
Date |
2021-09-10 |
|
|
Cont ID |
|
Sent By |
rgathrig |
Date |
2021-09-10 |
Time |
13:56 |
Rev Time |
0.00 |
Received By |
rgathrig |
Date |
2021-09-10 |
Time |
13:56 |
Sent To |
|
|
Notes |
2021-09-10 13:56:39 | PRIVATE PROVIDER REVIEW FAILED | | PLEASE SEE THE LIST BELOW FOR THE DIFFERENCE BETWEEN | | THE CODE COMPLIANCE AFFIDAVIT AND THE DOCUMENTS | | SUBMITTED FOR PERMITTING | | ? SHEET 1-4,2-4, 3-4,4-4 ARE DATE 2021.04.07, AFFIDAVIT | | HAS PLANS DATED APRIL 2021 | | ? C-1 DRAINAGE PLAN DATED 2021.04.07, AFFIDAVIT HAS | | PLAN DATED 4/2/2021 | | ? NOA 20-0729.06 IS NOT LISTED ON PLAN REVIEW | | COMPLIANCE AFFIDAVIT | | ? SURVEY DATED 2021.06.07, AFFIDAVIT HAS SURVEY DATED | | 2021. 06.07 | | RICHARD GATHRIGHT | | ASSISTANT BUILDING OFFICIAL | | | | |
|
|
Review Stop |
PRIVATEPRV |
PRIVATE PROVIDER DOCUMENTS |
Rev No |
1 |
Status |
F |
Date |
2021-06-08 |
|
|
Cont ID |
|
Sent By |
dbattles |
Date |
2021-06-08 |
Time |
13:54 |
Rev Time |
0.00 |
Received By |
dbattles |
Date |
2021-06-08 |
Time |
13:54 |
Sent To |
|
|
Notes |
2021-06-08 13:55:11 | REVIEW TO BE COMPLETED AFTER FINAL AFFIDAVIT OF | | COMPLIANCE IS PROVIDED. |
|
|
Review Stop |
R |
ROOF PLAN REVIEW |
Rev No |
4 |
Status |
P |
Date |
2022-02-01 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2022-02-01 |
Time |
14:36 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2022-02-01 |
Time |
14:36 |
Sent To |
|
|
Notes |
2022-02-01 14:37:22 | ROOFING AUDIT OK. JG. | | | | |
|
|
Review Stop |
R |
ROOF PLAN REVIEW |
Rev No |
3 |
Status |
F |
Date |
2021-12-09 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2021-12-09 |
Time |
13:07 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2021-12-09 |
Time |
13:07 |
Sent To |
|
|
Notes |
2021-12-09 13:07:53 | ROOFING THIRD AUDIT. | | | | 1- ROOFING UNDERLAYMENT FL14317-R11 SUBMITTED IS | | PENDING FBC APPROVAL. NEED TO SUBMIT APPROVED PRODUCT | | APPROVAL. FAC 61G20-3.001. | | NOTE: ENGINEER OF RECORD TO REVIEW AND APPROVED BEFORE | | SUBMITTAL. | | | | | | PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY | | QUESTIONS REGARDING THESE COMMENTS, | | JULIO GOMEZ | | COMMERCIAL COMBINATION PLANS EXAMINER | | DEVELOPMENT SERVICES DEPARTMENT | | BUILDING DIVISION | | (561)805-6712 | | [email protected] |
|
|
Review Stop |
R |
ROOF PLAN REVIEW |
Rev No |
2 |
Status |
F |
Date |
2021-11-15 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2021-11-15 |
Time |
14:01 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2021-11-15 |
Time |
14:01 |
Sent To |
|
|
Notes |
2021-11-15 14:02:05 | ROOFING SECOND AUDIT. | | | | 1- ROOFING UNDERLAYMENT FL14317-R11 SUBMITTED IS | | PENDING FBC APPROVAL. NEED TO SUBMIT APPROVED PRODUCT | | APPROVAL. FAC 61G20-3.001. | | NOTE: ENGINEER OF RECORD TO REVIEW AND APPROVED BEFORE | | SUBMITTAL. | | | | | | PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY | | QUESTIONS REGARDING THESE COMMENTS, | | JULIO GOMEZ | | COMMERCIAL COMBINATION PLANS EXAMINER | | DEVELOPMENT SERVICES DEPARTMENT | | BUILDING DIVISION | | (561)805-6712 | | [email protected] |
|
|
Review Stop |
R |
ROOF PLAN REVIEW |
Rev No |
1 |
Status |
F |
Date |
2021-09-08 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2021-09-08 |
Time |
10:33 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2021-09-08 |
Time |
10:33 |
Sent To |
|
|
Notes |
2021-09-08 10:34:45 | ROOFING AUDIT. | | | | 1- ROOFING UNDERLAYMENT FL14317-R11 SUBMITTED IS | | PENDING FBC APPROVAL. NEED TO SUBMIT APPROVED PRODUCT | | APPROVAL. FAC 61G20-3.001. | | NOTE: ENGINEER OF RECORD TO REVIEW AND APPROVED BEFORE | | SUBMITTAL. | | | | | | PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY | | QUESTIONS REGARDING THESE COMMENTS, | | JULIO GOMEZ | | COMMERCIAL COMBINATION PLANS EXAMINER | | DEVELOPMENT SERVICES DEPARTMENT | | BUILDING DIVISION | | (561)805-6712 | | [email protected] |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
6 |
Status |
P |
Date |
2022-02-03 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2022-02-03 |
Time |
10:01 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2022-02-03 |
Time |
09:39 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
5 |
Status |
F |
Date |
2022-02-02 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2022-02-02 |
Time |
11:23 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2022-02-02 |
Time |
11:21 |
Sent To |
|
|
Notes |
2022-02-02 11:22:49 | FIFTH SIGNATURE REVIEW COMMENTS: | | | | ORIGINAL COMMENT: | | 1- SOIL TEST REPORT NEEDS THE ORIGINAL SEAL AND | | SIGNATURE OF THE ENGINEER AS REQUIRED BY CHAPTER 471 | | FLORIDA STATUTES WHEN SUBMITTING DOCUMENTS/PLANS FOR | | PUBLIC RECORDS. | | SUBMIT DRAWINGS ELECTRONICALLY WITH ENGINEER'S DIGITAL | | SIGNATURE OR PROVIDE HARD COPY WITH ENGINEER'S ORIGINAL | | SEAL AND SIGNATURE. | | | | RESPONSE: | | SOIL TEST REPORT EMAILED BY JOHN E. NIESMAN (J.D.C. | | DEVELOPMENT SERVICES, INC.) DOESN'T HAVE A DIGITAL | | SIGNATURE. REPORT SUBMITTED IS A COPY OF HARD COPY | | REPORT PHYSICALLY SIGNED AND SEALED BY THE ENGINEER. | | SUBMIT DRAWINGS ELECTRONICALLY WITH ENGINEER'S DIGITAL | | SIGNATURE OR PROVIDE HARD COPY WITH ENGINEER'S ORIGINAL | | SEAL AND SIGNATURE. | | | | PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY | | QUESTIONS REGARDING THESE COMMENTS, | | JULIO GOMEZ | | COMMERCIAL COMBINATION PLANS EXAMINER | | DEVELOPMENT SERVICES DEPARTMENT | | BUILDING DIVISION | | (561)805-6712 | | [email protected] |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
4 |
Status |
F |
Date |
2022-02-01 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2022-02-01 |
Time |
14:37 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2022-02-01 |
Time |
14:37 |
Sent To |
|
|
Notes |
2022-02-01 14:39:13 | FOURTH SIGNATURE REVIEW COMMENTS: | | | | ORIGINAL COMMENT: | | 1- SOIL TEST REPORT NEEDS THE ORIGINAL SEAL AND | | SIGNATURE OF THE ENGINEER AS REQUIRED BY CHAPTER 471 | | FLORIDA STATUTES WHEN SUBMITTING DOCUMENTS/PLANS FOR | | PUBLIC RECORDS. | | SUBMIT DRAWINGS ELECTRONICALLY WITH ENGINEER'S DIGITAL | | SIGNATURE OR PROVIDE HARD COPY WITH ENGINEER'S ORIGINAL | | SEAL AND SIGNATURE. | | | | RESPONSE: | | REPEAT COMMENT. NOT ADDRESSED. | | | | PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY | | QUESTIONS REGARDING THESE COMMENTS, | | JULIO GOMEZ | | COMMERCIAL COMBINATION PLANS EXAMINER | | DEVELOPMENT SERVICES DEPARTMENT | | BUILDING DIVISION | | (561)805-6712 | | [email protected] |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
3 |
Status |
F |
Date |
2021-12-09 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2021-12-09 |
Time |
13:08 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2021-12-09 |
Time |
13:08 |
Sent To |
|
|
Notes |
2021-12-09 13:08:40 | THIRD SIGNATURE REVIEW COMMENTS: | | | | ORIGINAL COMMENT: | | 1- SOIL TEST REPORT NEEDS THE ORIGINAL SEAL AND | | SIGNATURE OF THE ENGINEER AS REQUIRED BY CHAPTER 471 | | FLORIDA STATUTES WHEN SUBMITTING DOCUMENTS/PLANS FOR | | PUBLIC RECORDS. | | SUBMIT DRAWINGS ELECTRONICALLY WITH ENGINEER'S DIGITAL | | SIGNATURE OR PROVIDE HARD COPY WITH ENGINEER'S ORIGINAL | | SEAL AND SIGNATURE. | | | | RESPONSE: | | REPEAT COMMENT. NOT ADDRESSED. | | | | PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY | | QUESTIONS REGARDING THESE COMMENTS, | | JULIO GOMEZ | | COMMERCIAL COMBINATION PLANS EXAMINER | | DEVELOPMENT SERVICES DEPARTMENT | | BUILDING DIVISION | | (561)805-6712 | | [email protected] |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
2 |
Status |
F |
Date |
2021-11-15 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2021-11-15 |
Time |
14:02 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2021-11-15 |
Time |
14:02 |
Sent To |
|
|
Notes |
2021-11-15 14:03:40 | SECOND SIGNATURE REVIEW COMMENTS: | | | | ORIGINAL COMMENT: | | 1- SOIL TEST REPORT NEEDS THE ORIGINAL SEAL AND | | SIGNATURE OF THE ENGINEER AS REQUIRED BY CHAPTER 471 | | FLORIDA STATUTES WHEN SUBMITTING DOCUMENTS/PLANS FOR | | PUBLIC RECORDS. | | SUBMIT DRAWINGS ELECTRONICALLY WITH ENGINEER'S DIGITAL | | SIGNATURE OR PROVIDE HARD COPY WITH ENGINEER'S ORIGINAL | | SEAL AND SIGNATURE. | | | | RESPONSE: | | REPEAT COMMENT. NOT ADDRESSED. | | | | PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY | | QUESTIONS REGARDING THESE COMMENTS, | | JULIO GOMEZ | | COMMERCIAL COMBINATION PLANS EXAMINER | | DEVELOPMENT SERVICES DEPARTMENT | | BUILDING DIVISION | | (561)805-6712 | | [email protected] |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
F |
Date |
2021-09-08 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2021-09-08 |
Time |
10:49 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2021-09-08 |
Time |
10:37 |
Sent To |
|
|
Notes |
2021-09-08 10:39:43 | SIGNATURE REVIEW COMMENTS: | | | | 1- SOIL TEST REPORT NEEDS THE ORIGINAL SEAL AND | | SIGNATURE OF THE ENGINEER AS REQUIRED BY CHAPTER 471 | | FLORIDA STATUTES WHEN SUBMITTING DOCUMENTS/PLANS FOR | | PUBLIC RECORDS. | | SUBMIT DRAWINGS ELECTRONICALLY WITH ENGINEER'S DIGITAL | | SIGNATURE OR PROVIDE HARD COPY WITH ENGINEER'S ORIGINAL | | SEAL AND SIGNATURE. | | | | PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY | | QUESTIONS REGARDING THESE COMMENTS, | | JULIO GOMEZ | | COMMERCIAL COMBINATION PLANS EXAMINER | | DEVELOPMENT SERVICES DEPARTMENT | | BUILDING DIVISION | | (561)805-6712 | | [email protected] |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
P |
Date |
2021-08-23 |
|
|
Cont ID |
|
Sent By |
awooten |
Date |
2021-08-23 |
Time |
|
Rev Time |
|
Received By |
awooten |
Date |
2021-08-23 |
Time |
|
Sent To |
|
|
Notes |
|
|