Plan Review Details - Permit 21040650
Plan Review Stops For Permit 21040650
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2021-05-26 Cont ID  
Sent By rmcphers Date 2021-05-26 Time 13:27 Rev Time 0.00
Received By rmcphers Date 2021-05-26 Time 13:27 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2021-05-26 Cont ID  
Sent By equinone Date 2021-05-26 Time 12:20 Rev Time 0.00
Received By equinone Date 2021-05-26 Time 12:20 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status P Date 2021-05-26 Cont ID  
Sent By lcrespo Date 2021-05-26 Time 13:04 Rev Time 0.00
Received By lcrespo Date 2021-05-26 Time 13:04 Sent To  
Notes
2021-05-26 13:05:09GAS PLAN REVIEW, A GAS PLAN HAS NOT BEEN INCLUDED IN
 THIS SUBMITTAL PACKAGE. A GAS PLAN REVIEW HAS NOT BEEN
 PERFORMED AT THIS TIME. A SEPARATE GAS PERMIT AND PLANS
 WILL BE REQUIRED FOR A CONTRACTOR TO PERFORM THE
 RELATED WORK. PROVIDE COMPLETE PLANS AND GAS RISER THAT
 REFLECTS THE ENTIRE SCOPE OF GAS WORK TO BE DONE PER
 THE WPB AMENDMENTS TO FBC SEC. 107.2.1.
  
 A SUB GAS PERMIT IS REQUIRED BY A LICENSED CONTRACTOR
 FOR THE SCOPE OF WORK PER THE WPB AMENDMENTS TO THE FBC
 SEC. 105.1.
  

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2021-05-28 Cont ID  
Sent By fmittner Date 2021-05-28 Time 11:04 Rev Time 0.00
Received By fmittner Date 2021-05-28 Time 11:04 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2021-08-13 Cont ID  
Sent By ccarvaja Date 2021-08-13 Time 14:41 Rev Time  
Received By ccarvaja Date   Time   Sent To  
Notes
***NONE***

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 1 Status P Date 2021-08-13 Cont ID  
Sent By ccarvaja Date 2021-08-13 Time 14:41 Rev Time 0.00
Received By ccarvaja Date 2021-05-18 Time 10:40 Sent To  
Notes
2021-05-18 10:40:355/18/21 EMAILED IMPACT FOR REVIEW. LEM

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2021-05-26 Cont ID  
Sent By medwards Date 2021-05-26 Time 14:11 Rev Time 0.00
Received By medwards Date 2021-05-26 Time 14:11 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2021-05-26 Cont ID  
Sent By lcrespo Date 2021-05-26 Time 13:02 Rev Time 0.00
Received By lcrespo Date 2021-05-26 Time 13:02 Sent To  
Notes
2021-05-26 13:03:3605/26/21 REVIEWED FOR CODE COMPLIANCE (PLUMBING)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS, OR THEIR REPRESENTATIVES
 FROM THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL,
 STATE, AND NATIONAL CODES AND STANDARDS IN EFFECT AT
 THE TIME OF PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK
 OF EVERY ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2021-08-13 Cont ID  
Sent By shill Date 2021-08-13 Time 15:29 Rev Time 0.00
Received By shill Date 2021-08-13 Time 15:29 Sent To  
Notes
2021-08-13 15:29:49APPROVED ON 20101413

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2021-05-26 Cont ID  
Sent By rmcphers Date 2021-05-26 Time 13:28 Rev Time 0.00
Received By rmcphers Date 2021-05-26 Time 13:28 Sent To  
Notes
2021-05-26 13:30:36NOT YET APPROVED ON 20101413

Review Stop Z ZONING
Rev No 1 Status P Date 2021-05-28 Cont ID  
Sent By fmittner Date 2021-05-28 Time 11:04 Rev Time 0.00
Received By fmittner Date 2021-05-28 Time 11:04 Sent To  
Notes
***NONE***