Plan Review Stops For Permit 21040007 |
Review Stop |
ASBESTOS |
CONFIRM RPT SENT TO PBC HEALTH |
Rev No |
2 |
Status |
P |
Date |
2021-05-27 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2021-05-27 |
Time |
09:24 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2021-05-27 |
Time |
09:24 |
Sent To |
|
|
Notes |
|
|
Review Stop |
ASBESTOS |
CONFIRM RPT SENT TO PBC HEALTH |
Rev No |
1 |
Status |
F |
Date |
2021-05-25 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2021-05-25 |
Time |
16:41 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2021-05-25 |
Time |
16:41 |
Sent To |
|
|
Notes |
2021-05-25 16:42:20 | PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE | | CONTRACTOR, ON LETTERHEAD, STATING THAT THE | | INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM | | COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH | | COUNTY WILL BE FOLLOWED, AND THAT NOTIFICATION WILL BE | | GIVEN TIMELY. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
P |
Date |
2021-06-11 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2021-06-11 |
Time |
20:54 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2021-06-11 |
Time |
20:54 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2021-05-25 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2021-05-25 |
Time |
16:38 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2021-05-25 |
Time |
16:38 |
Sent To |
|
|
Notes |
2021-05-25 16:41:47 | CONDO REMODEL | | REVIEWED BY ROGER MCPHERSON | | 561-805-6716 | | [email protected] | | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 | | AMENDMENTS | | | | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 | | 1) PLEASE SHOW SHOWER WALL FINISHES TO COMPLY WITH FBC | | 1210.2.3 SHOWERS. | | SHOWER COMPARTMENTS AND WALLS ABOVE BATHTUBS WITH | | INSTALLED SHOWER HEADS SHALL BE FINISHED WITH A SMOOTH, | | NONABSORBENT SURFACE TO A HEIGHT NOT LESS THAN 72 | | INCHES (1829 MM) ABOVE THE DRAIN INLET. | | |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
P |
Date |
2021-06-09 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2021-06-09 |
Time |
09:05 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2021-06-09 |
Time |
08:54 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
F |
Date |
2021-05-17 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2021-05-17 |
Time |
07:13 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2021-05-17 |
Time |
07:08 |
Sent To |
|
|
Notes |
2021-05-17 07:23:13 | ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW. | | | | FLORIDA BUILDING CODE 2020 7TH EDITION | | FLORIDA BUILDING CODE ENERGY CONSERVATION 2020 7TH ED | | NFPA 70 2017 EDITION | | | | JAKE LEAHY BN, BU, PX | | ELECTRICAL PLANS EXAMINER II | | 561-805-6713 | | [email protected] | | | | KITCHEN PENINSULAR NEXT TO RANGE NEEDS AN OUTLET TO | | SERVE COUNTER TOP. SPACE NEXT TO RANGE IS MORE THAN 12" | | AN OUTLET IS REQUIRED THERE ALSO. | | | | 210.52(C)(3) PENINSULAR COUNTERTOP SPACES. AT LEAST ONE | | RECEPTACLE OUTLET SHALL BE INSTALLED AT EACH PENINSULAR | | COUNTERTOP LONG DIMENSION SPACE WITH A LONG DIMENSION | | OF 600 MM (24 IN.) OR GREATER AND A SHORT DIMENSION OF | | 300 MM (12 IN.) OR GREATER. A PENINSULAR COUNTERTOP IS | | MEASURED FROM THE CONNECTED PERPENDICULAR WALL. | | (4) SEPARATE SPACES. COUNTERTOP SPACES SEPARATED BY | | RANGETOPS, REFRIGERATORS, OR SINKS SHALL BE CONSIDERED | | AS SEPARATE COUNTERTOP SPACES IN APPLYING THE | | REQUIREMENTS OF 210.52(C)(1). IF A RANGE, | | COUNTER-MOUNTED COOKING UNIT, OR SINK IS INSTALLED IN | | AN ISLAND OR PENINSULAR COUNTERTOP AND THE DEPTH OF THE | | COUNTERTOP BEHIND THE RANGE, COUNTER-MOUNTED COOKING | | UNIT, OR SINK IS LESS THAN 300 MM (12 IN.), THE RANGE, | | COUNTER-MOUNTED COOKING UNIT, OR SINK SHALL BE | | CONSIDERED TO DIVIDE THE COUNTERTOP SPACE INTO TWO | | SEPARATE COUNTERTOP SPACES. EACH SEPARATE COUNTERTOP | | SPACE SHALL COMPLY WITH THE APPLICABLE REQUIREMENTS IN | | 210.52(C). |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
1 |
Status |
P |
Date |
2021-05-12 |
|
|
Cont ID |
|
Sent By |
cwalker |
Date |
2021-05-12 |
Time |
|
Rev Time |
0.00 |
Received By |
cwalker |
Date |
2021-05-12 |
Time |
|
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2021-06-11 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2021-06-11 |
Time |
20:55 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2021-06-04 |
Time |
13:52 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2021-05-25 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2021-05-25 |
Time |
16:42 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2021-05-10 |
Time |
10:03 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
P |
Date |
2021-05-17 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2021-05-17 |
Time |
08:56 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2021-05-17 |
Time |
07:36 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
2 |
Status |
P |
Date |
2021-06-11 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2021-06-11 |
Time |
20:55 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2021-06-11 |
Time |
20:55 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
F |
Date |
2021-05-25 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2021-05-25 |
Time |
16:42 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2021-05-25 |
Time |
16:42 |
Sent To |
|
|
Notes |
2021-05-25 16:42:50 | SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE | | DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR | | ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW. | | DRAWINGS DO NOT SHOW IN "ADOBE READER" AS | | DIGITALLY/ELECTRONICALLY SIGNED. - OR - IF YOUR | | ARCHITECT OR ENGINEER DOES NOT HAVE AN ELECTRONIC OR | | DIGITAL SIGNATURE - YOU CAN MAIL IN OR DROP OFF THE | | ORIGINAL SIGNED AND SEALED DRAWINGS/DOCUMENTS TO THE | | FRONT DESK IN THE BUILDING DEPT. AT THE CITY HALL |
|
|