Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2021-07-01 Cont ID  
Sent By rmcdouga Date 2021-07-01 Time 12:52 Rev Time 0.00
Received By rmcdouga Date 2021-07-01 Time 12:52 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2021-05-07 Cont ID  
Sent By rmcdouga Date 2021-05-07 Time 11:54 Rev Time 0.00
Received By rmcdouga Date 2021-05-07 Time 10:51 Sent To  
Notes
2021-05-07 11:55:52PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC SEVENTH EDITION (2020)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) SUBMIT GENERATOR PAD DRAWINGS WITH GENERATOR TO PAD
 ANCHORING DETAILS. IF A PREFABRICATED GENERATOR PAD
 WILL BE USED SUBMIT SITE SPECIFIC GENERATOR PAD
 ENGINEERING THAT HAS BEEN SIGNED AND SEALED BY THE
 ENGINEER. FBC 107.2.1
  
 2) THE GENERATOR EXHAUST IS REQUIRED TO BE AT LEAST 10
 FEET FROM ANY OPENINGS INTO A BUILDING. FBC-R303.5.1
 INTAKE OPENINGS. MECHANICAL AND GRAVITY OUTDOOR AIR
 INTAKE OPENINGS SHALL BE LOCATED NOT LESS THAN 10 FEET
 (3048 MM) FROM ANY HAZARDOUS OR NOXIOUS CONTAMINANT,
 SUCH AS VENTS, CHIMNEYS, PLUMBING VENTS, STREETS,
 ALLEYS, PARKING LOTS AND LOADING DOCKS.
  

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2021-05-07 Cont ID  
Sent By equinone Date 2021-05-07 Time 14:30 Rev Time 0.00
Received By equinone Date 2021-05-07 Time 14:30 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2021-05-07 Cont ID  
Sent By ccole Date 2021-05-07 Time 08:19 Rev Time 0.00
Received By ccole Date 2021-05-07 Time 08:01 Sent To  
Notes
2021-05-07 09:01:12THE PERMIT APPLICATION INDICATES THE GAS FOR THE
 GENERATOR WILL BE UNDER A SEPARATE PERMIT- NO GAS PLANS
 WERE SUBMITTED.
 CCOLE- 5/7/21
2021-05-07 08:19:32 
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2021-07-01 Cont ID  
Sent By rmcdouga Date 2021-07-01 Time 12:52 Rev Time 0.00
Received By rmcdouga Date 2021-06-21 Time 06:30 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2021-06-16 Cont ID  
Sent By cthroop Date 2021-06-16 Time 09:21 Rev Time 0.00
Received By cthroop Date 2021-04-16 Time 15:02 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status N Date 2021-05-07 Cont ID  
Sent By ccole Date 2021-05-07 Time 08:01 Rev Time 0.00
Received By ccole Date 2021-05-07 Time 08:01 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2021-07-01 Cont ID  
Sent By rmcdouga Date 2021-07-01 Time 12:52 Rev Time 0.00
Received By rmcdouga Date 2021-07-01 Time 12:52 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2021-05-07 Cont ID  
Sent By rmcdouga Date 2021-05-07 Time 11:48 Rev Time 0.00
Received By rmcdouga Date 2021-05-07 Time 10:51 Sent To  
Notes
2021-05-07 11:48:04ELECTRONICALLY SUBMITTED DRAWINGS ARE REQUIRED TO HAVE
 THE ARCHITECT OR ENGINEER'S DIGITAL SIGNATURE ON THEM.
 YOU ALSO HAVE THE OPTION TO SUBMIT THE SIGNED AND
 SEALED PAPER VERSION OF DRAWINGS. AFTER THE ELECTRONIC
 PLANS HAVE BEEN APPROVED, YOU CAN SUBMIT THE
 CORRESPONDING PAPER DRAWINGS AT THE BUILDING DEPARTMENT
 TO BE VERIFIED. THE ARCHITECT OR ENGINEER'S ORIGINAL
 HANDWRITTEN SIGNATURE AND SEAL IS REQUIRED TO BE ON THE
 DRAWINGS. NO PHOTOCOPY OR OTHER FACSIMILES OF THE
 SIGNATURE ARE ACCEPTABLE. FS 487 & 61G1 OR FS 471 &
 61G15
  
  

Review Stop Z ZONING
Rev No 1 Status P Date 2021-06-15 Cont ID  
Sent By kalexand Date 2021-06-15 Time 10:04 Rev Time 0.00
Received By kalexand Date 2021-06-15 Time 10:04 Sent To I
Notes
***NONE***