Plan Review Details - Permit 21031179
Plan Review Stops For Permit 21031179
Review Stop AD ADDRESSING
Rev No 1 Status P Date 2021-03-24 Cont ID  
Sent By cpuell Date 2021-03-24 Time 10:39 Rev Time 0.00
Received By cpuell Date 2021-03-24 Time 10:39 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2021-05-07 Cont ID  
Sent By pvalenti Date 2021-05-07 Time 16:39 Rev Time 0.00
Received By pvalenti Date 2021-05-07 Time 16:34 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2021-04-27 Cont ID  
Sent By pvalenti Date 2021-04-27 Time 16:06 Rev Time 0.00
Received By pvalenti Date 2021-04-27 Time 15:55 Sent To  
Notes
2021-04-27 16:06:46PETER E VALENTI
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6673
  
 FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020)
 FBC B = FBC BUILDING
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC R = FBC RESIDENTIAL
  
 BUILDING REVIEW DENIED:
  
 FBC B 107.2.1, PAGE 19 OF 25 (ULTIMATE DESIGN WIND
 SPEED) IDENTIFIED/HIGHLIGHTED ON THE NEMO REPORT
 INDICATES AN ULTIMATE DESIGN WIND SPEED-VULT OF 140
 MPH. THIS SHOULD BE AT 170 MPH. PLEASE REVIEW ALL
 SUBMITTED DOCUMENTS AND INDICATE THE SYSTEMS/ OPTIONS
 THAT WILL BE USED.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2021-04-15 Cont ID  
Sent By pvalenti Date 2021-04-15 Time 06:23 Rev Time 0.00
Received By pvalenti Date 2021-04-15 Time 06:16 Sent To  
Notes
2021-04-15 06:27:08PETER E VALENTI
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6673
  
 FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020)
 FBC B = FBC BUILDING
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC R = FBC RESIDENTIAL
  
 BUILDING REVIEW DENIED:
  
 FBC B 107.2, THE FOLLOWING INFORMATION IS REQUIRED:
  
 A ROOF LAYOUT SHEET INCLUDING ROOF PITCHES AND FLAT
 AREAS IDENTIFIED IF APPLICABLE. ALSO IDENTIFY WITHIN
 THE PRODUCT APPROVALS THE OPTIONS & SYSTEMS THAT WILL
 BE USED.

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2021-05-07 Cont ID  
Sent By pvalenti Date 2021-05-07 Time 16:39 Rev Time 0.00
Received By pvalenti Date 2021-04-29 Time 16:37 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2021-04-27 Cont ID  
Sent By pvalenti Date 2021-04-27 Time 16:19 Rev Time 0.00
Received By pvalenti Date 2021-04-16 Time 16:20 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2021-04-15 Cont ID  
Sent By pvalenti Date 2021-04-15 Time 06:27 Rev Time 0.00
Received By pvalenti Date 2021-04-08 Time 10:06 Sent To  
Notes
***NONE***