Plan Review Stops For Permit 21030170 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
P |
Date |
2021-08-10 |
|
|
Cont ID |
|
Sent By |
cthroop |
Date |
2021-08-10 |
Time |
13:35 |
Rev Time |
0.00 |
Received By |
cthroop |
Date |
2021-08-10 |
Time |
13:30 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2021-03-11 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2021-03-11 |
Time |
14:39 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2021-03-11 |
Time |
14:39 |
Sent To |
|
|
Notes |
2021-03-11 14:32:01 | PLAN | | REVIEW COMMENTS | | | | 1ST REVIEW: FBC SEVENTH EDITION (2020) | | ROBERT MCDOUGAL, CBO | | COMMERCIAL COMBINATION PLANS EXAMINER | | (561) 805-6714 | | [email protected] | | | | DENIED BY BUILDING | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | 1) REVISE THE NOTE ON THE SURVEY. THE GENERATOR EXHAUST | | IS REQUIRED TO BE 10 FEET FROM ANY OPENINGS TO A | | BUILDING. FBC-R303.5.1 INTAKE OPENINGS. MECHANICAL AND | | GRAVITY OUTDOOR AIR INTAKE OPENINGS SHALL BE LOCATED | | NOT LESS THAN 10 FEET (3048 MM) FROM ANY HAZARDOUS OR | | NOXIOUS CONTAMINANT, SUCH AS VENTS, CHIMNEYS, PLUMBING | | VENTS, STREETS, ALLEYS, PARKING LOTS AND LOADING DOCKS. | | | | 2) SUBMIT A MIAMI-DADE OF FLORIDA PRODUCT APPROVAL OR | | SIGNED AND SEALED SITE SPECIFIC ENGINEERING FOR THE | | PRE-FABRICATED GENERATOR PAD. THE SIZE DIMENSIONS AND | | WEIGHT OF THE GENERATOR MUST MATCH THE ONES ON THE | | ENGINEERING OR PRODUCT APPROVAL. THE GENERATOR PAD | | DRAWINGS THAT WERE SUBMITTED DO NOT MATCH THE GENERATOR | | SPECIFICATIONS FOR SIZE AND WEIGHT. FBC AMENDMENTS | | 107.2.1 | | |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2021-03-15 |
|
|
Cont ID |
|
Sent By |
cthroop |
Date |
2021-03-15 |
Time |
12:06 |
Rev Time |
0.00 |
Received By |
cthroop |
Date |
2021-03-15 |
Time |
09:46 |
Sent To |
|
|
Notes |
|
|
Review Stop |
G |
GAS REVIEW |
Rev No |
2 |
Status |
P |
Date |
2021-08-10 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2021-08-10 |
Time |
15:15 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2021-08-10 |
Time |
14:47 |
Sent To |
|
|
Notes |
|
|
Review Stop |
G |
GAS REVIEW |
Rev No |
1 |
Status |
P |
Date |
2021-04-05 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2021-04-05 |
Time |
11:18 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2021-04-05 |
Time |
09:39 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
|
|
|
Cont ID |
|
Sent By |
|
Date |
2021-08-10 |
Time |
|
Rev Time |
0.00 |
Received By |
|
Date |
2021-07-07 |
Time |
|
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2021-03-24 |
|
|
Cont ID |
|
Sent By |
pvalenti |
Date |
2021-04-05 |
Time |
07:54 |
Rev Time |
0.00 |
Received By |
pvalenti |
Date |
2021-03-10 |
Time |
17:05 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
N |
Date |
2021-08-10 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2021-08-10 |
Time |
15:15 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2021-08-10 |
Time |
14:47 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
N |
Date |
2021-04-05 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2021-04-05 |
Time |
11:18 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2021-04-05 |
Time |
09:39 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
2 |
Status |
P |
Date |
2021-08-10 |
|
|
Cont ID |
|
Sent By |
cthroop |
Date |
2021-08-10 |
Time |
13:35 |
Rev Time |
0.00 |
Received By |
cthroop |
Date |
2021-08-10 |
Time |
13:30 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
F |
Date |
2021-03-11 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2021-03-11 |
Time |
14:41 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2021-03-11 |
Time |
14:41 |
Sent To |
|
|
Notes |
2021-03-11 14:30:43 | THE GENERATOR PAD DRAWING THAT WAS SUBMITTED DOES NOT | | HAVE AN ENGINEER'S ORIGINAL SIGNATURE. ELECTRONICALLY | | SUBMITTED DRAWINGS ARE REQUIRED TO HAVE THE ENGINEER'S | | DIGITAL SIGNATURE ON THEM. YOU ALSO HAVE THE OPTION TO | | SUBMIT THE SIGNED AND SEALED PAPER VERSION OF DRAWINGS. | | AFTER THE ELECTRONIC PLANS HAVE BEEN APPROVED, YOU CAN | | SUBMIT THE CORRESPONDING PAPER DRAWINGS AT THE BUILDING | | DEPARTMENT TO BE VERIFIED. THE ENGINEER'S ORIGINAL | | HANDWRITTEN SIGNATURE AND SEAL IS REQUIRED TO BE ON THE | | DRAWINGS. NO PHOTOCOPY OR OTHER FACSIMILES OF THE | | SIGNATURE ARE ACCEPTABLE. FS 471 & 61G15 |
|
|
Review Stop |
Z |
ZONING |
Rev No |
2 |
Status |
P |
Date |
2021-08-10 |
|
|
Cont ID |
|
Sent By |
awooten |
Date |
2021-08-10 |
Time |
|
Rev Time |
0.00 |
Received By |
awooten |
Date |
2021-08-10 |
Time |
|
Sent To |
|
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
P |
Date |
2021-03-23 |
|
|
Cont ID |
|
Sent By |
awooten |
Date |
2021-03-23 |
Time |
|
Rev Time |
|
Received By |
awooten |
Date |
2021-03-23 |
Time |
|
Sent To |
|
|
Notes |
|
|