Plan Review Details - Permit 21020171
Plan Review Stops For Permit 21020171 |
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
1 |
Status |
P |
Date |
2021-02-08 |
|
|
Cont ID |
|
Sent By |
bdolan |
Date |
2021-02-08 |
Time |
|
Rev Time |
0.00 |
Received By |
bdolan |
Date |
2021-02-08 |
Time |
12:07 |
Sent To |
|
|
Notes |
2021-02-08 12:20:23 | THE FOLLOWING COMMENTS WERE SUBMITTED BY LIEUTENANT | | BRIAN DOLAN, BUREAU OF FIRE PREVENTION, WEST PALM BEACH | | FIRE RESCUE: | | | | WHERE ADDITION OR MODIFICATION IS MADE TO AN EXISTING | | SYSTEM AFFECTING MORE THAN 20 SPRINKLERS, THE NEW | | PORTION SHALL BE ISOLATED AND TESTED AT NOT LESS THAN | | 200 PSI (13.8 BAR) FOR 2 HOURS. | | | | THE EXISTING LIFE SAFETY SYSTEMS, FIRE ALARM AND/OR | | FIRE SPRINKLER SHALL BE MAINTAINED AND REMAIN ACTIVE | | THROUGHOUT THE CONSTRUCTION PERIOD, INCLUDING DEMO. | | | | ANY TIME THAT WORK ON THE LIFE SAFETY SYSTEMS, | | SPRINKLER AND/OR FIRE ALARM, EXCEEDS 4 HOURS, A FIRE | | WATCH SHALL BE IMPLEMENTED AND MAINTAINED UNTIL FULL | | AND COMPLETE PROTECTION IS RETURNED. SYSTEM WILL BE | | PLACED IN REGULAR SERVICE PRIOR TO LEAVING SITE FOR THE | | EVENING. | | | | | | LT. BRIAN DOLAN | | DIVISION OF FIRE PREVENTION | | 561-804-4752 | | [email protected] | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2021-02-17 |
|
|
Cont ID |
|
Sent By |
medwards |
Date |
2021-02-17 |
Time |
11:03 |
Rev Time |
0.00 |
Received By |
medwards |
Date |
2021-02-05 |
Time |
11:26 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
1 |
Status |
N |
Date |
2021-02-17 |
|
|
Cont ID |
|
Sent By |
medwards |
Date |
2021-02-17 |
Time |
11:03 |
Rev Time |
0.00 |
Received By |
medwards |
Date |
2021-02-17 |
Time |
11:03 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
2 |
Status |
P |
Date |
2021-02-19 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2021-02-19 |
Time |
09:24 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2021-02-19 |
Time |
08:57 |
Sent To |
|
|
Notes |
2021-02-19 09:25:44 | SHEET FP1 OF 1 WITH ENGINEER'S ORIGINAL SEAL/SIGNATURE | | MATCHES APPROVED ONE. JG. |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
F |
Date |
2021-02-05 |
|
|
Cont ID |
|
Sent By |
medwards |
Date |
2021-02-05 |
Time |
14:16 |
Rev Time |
0.00 |
Received By |
medwards |
Date |
2021-02-05 |
Time |
14:16 |
Sent To |
|
|
Notes |
2021-02-05 14:16:51 | PER THE WPB AMENDMENTS TO THE FBC, EACH SHEET OF PLAN | | (INCLUDING THE SUPPORTING DOCUMENTS) IS REQUIRED TO BE | | SIGNED AND SEALED BY THE PERSON RESPONSIBLE FOR THE | | DESIGN. A DIGITAL PLAN REQUIRES A DIGITAL SIGNATURE | | WITH THE PROPER THIRD PARTY VERIFICATION. PROVIDE | | CORRECTION. ALTERNATIVELY, A SIGNED/SEALED PAPER SET | | MAY BE SUPPLIED TO THE BUILDING DEPARTMENT WHEN ALL | | TRADES ARE APPROVED. WPB FBC 107.1; FS 471/481 | | | | MICHAEL EDWARDS | | MECHANICAL EXAMINER | | 401 CLEMATIS STREET | | WEST PALM BEACH FL. 33401 | | 561-805-6728 | | [email protected] | | |
|
|
|