Plan Review Details - Permit 21011123
Plan Review Stops For Permit 21011123
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2021-05-03 Cont ID  
Sent By rmcdouga Date 2021-05-03 Time 15:44 Rev Time 0.00
Received By rmcdouga Date 2021-05-03 Time 15:44 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2021-03-01 Cont ID  
Sent By rmcdouga Date 2021-03-01 Time 08:41 Rev Time 0.00
Received By rmcdouga Date 2021-03-01 Time 08:41 Sent To  
Notes
2021-03-01 09:00:29PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC SEVENTH EDITION (2020)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) THE GENERATOR EXHAUST IS REQUIRED TO BE 10 FEET FROM
 OPENINGS INTO A STRUCTURE. R303.5.1 INTAKE
 OPENINGS.MECHANICAL AND GRAVITY OUTDOOR AIR INTAKE
 OPENINGS SHALL BE LOCATED NOT LESS THAN 10 FEET (3048
 MM) FROM ANY HAZARDOUS OR NOXIOUS CONTAMINANT, SUCH AS
 VENTS, CHIMNEYS, PLUMBING VENTS, STREETS, ALLEYS,
 PARKING LOTS AND LOADING DOCKS.
  
 2) THE ENGINEER'S DIGITAL SIGNATURE ON THE GENERATOR
 PAD DRAWING CAN NOT BE VERIFIED. COPIES OF DIGITALLY
 SIGNED DOCUMENTS ARE NOT ACCEPTABLE. ELECTRONICALLY
 SUBMITTED DRAWINGS ARE REQUIRED TO HAVE THE ENGINEER'S
 DIGITAL SIGNATURE ON THEM. YOU ALSO HAVE THE OPTION TO
 SUBMIT THE SIGNED AND SEALED PAPER VERSION OF DRAWINGS.
 AFTER THE ELECTRONIC PLANS HAVE BEEN APPROVED, YOU CAN
 SUBMIT THE CORRESPONDING PAPER DRAWINGS AT THE BUILDING
 DEPARTMENT TO BE VERIFIED. THE ENGINEER'S ORIGINAL
 HANDWRITTEN SIGNATURE AND SEAL IS REQUIRED TO BE ON THE
 DRAWINGS. NO PHOTOCOPY OR OTHER FACSIMILES OF THE
 SIGNATURE ARE ACCEPTABLE. FS 471 & 61G15
  

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2021-03-02 Cont ID  
Sent By jleahy Date 2021-03-02 Time 09:32 Rev Time 0.00
Received By jleahy Date 2021-02-26 Time 13:16 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status P Date 2021-03-02 Cont ID  
Sent By cthroop Date 2021-03-02 Time 10:49 Rev Time 0.00
Received By cthroop Date 2021-03-02 Time 10:29 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2021-05-25 Cont ID  
Sent By lcrespo Date 2021-05-25 Time 16:44 Rev Time 0.00
Received By lcrespo Date 2021-04-26 Time 09:17 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2021-03-29 Cont ID  
Sent By lmarchan Date 2021-03-29 Time 17:17 Rev Time 0.00
Received By lmarchan Date 2021-02-24 Time 13:25 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status N Date 2021-03-02 Cont ID  
Sent By cthroop Date 2021-03-02 Time 10:30 Rev Time 0.00
Received By cthroop Date 2021-03-02 Time 10:30 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2021-05-03 Cont ID  
Sent By rmcdouga Date 2021-05-03 Time 15:44 Rev Time 0.00
Received By rmcdouga Date 2021-05-03 Time 15:44 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2021-03-01 Cont ID  
Sent By rmcdouga Date 2021-03-01 Time 09:00 Rev Time 0.00
Received By rmcdouga Date 2021-03-01 Time 09:00 Sent To  
Notes
2021-03-01 09:00:57THE ENGINEER'S DIGITAL SIGNATURE ON THE GENERATOR PAD
 DRAWING CAN NOT BE VERIFIED. COPIES OF DIGITALLY SIGNED
 DOCUMENTS ARE NOT ACCEPTABLE. ELECTRONICALLY SUBMITTED
 DRAWINGS ARE REQUIRED TO HAVE THE ENGINEER'S DIGITAL
 SIGNATURE ON THEM. YOU ALSO HAVE THE OPTION TO SUBMIT
 THE SIGNED AND SEALED PAPER VERSION OF DRAWINGS. AFTER
 THE ELECTRONIC PLANS HAVE BEEN APPROVED, YOU CAN SUBMIT
 THE CORRESPONDING PAPER DRAWINGS AT THE BUILDING
 DEPARTMENT TO BE VERIFIED. THE ENGINEER'S ORIGINAL
 HANDWRITTEN SIGNATURE AND SEAL IS REQUIRED TO BE ON THE
 DRAWINGS. NO PHOTOCOPY OR OTHER FACSIMILES OF THE
 SIGNATURE ARE ACCEPTABLE. FS 471 & 61G15
  

Review Stop Z ZONING
Rev No 2 Status P Date 2021-05-24 Cont ID  
Sent By kalexand Date 2021-05-24 Time 10:49 Rev Time 0.00
Received By kalexand Date 2021-05-24 Time 10:49 Sent To I
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2021-03-29 Cont ID  
Sent By kalexand Date 2021-03-29 Time 09:08 Rev Time 0.00
Received By kalexand Date 2021-03-29 Time 09:08 Sent To I
Notes
2021-03-29 09:17:55ZONING PLAN REVIEW
 ________________________________________
  
 REVIEW STATUS: FAILED
 ________________________________________
  
 PLEASE PROVIDE A WRITTEN RESPONSE TO THE FOLLOWING PLAN
 REVIEW COMMENTS:
  
 1. GENERATOR EQUIPMENT ENCROACHES TOO FAR INTO REQUIRED
 SETBACK. PURSUANT TO THE CITY OF WEST PALM BEACH ZONING
 AND LAND DEVELOPMENT REGULATIONS (ZLDR), SECTION
 94-305(B)(4): MECHANICAL EQUIPMENT MAY NOT PROJECT MORE
 THAN 4 FEET INTO A REQUIRED SETBACK.
  
 -- THE REAR SETBACK FOR THIS DISTRICT IS 15 FT OR 10%
 OF THE LOT DEPTH; THERFORE THE REAR SETBACK OF THIS
 PARCEL IS 8.15 FT.
 -- THE MINIMUM REAR SETBACK FOR THE GENERATOR SHALL BE
 4.15 FT.
  
  
 ________________________________________
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
  
 IF YOU SUBMITTED A PAPER APPLICATION, AND YOU WOULD
 LIKE TO RESUBMIT ELECTRONICALLY, EMAIL
 [email protected] AND REQUEST TO HAVE YOUR
 PROJECT CONVERTED TO PROJECTDOX. YOU WILL RECEIVE LOG
 IN INFORMATION AND A LINK TO UPLOAD YOUR RESUBMITTAL.
 PLEASE BE SURE TO ?COMPLETE THE UPLOAD TASK? WHEN YOU
 ARE FINISHED UPLOADING.
 ________________________________________
  
 QUESTIONS/COMMENTS, PLEASE CONTACT THE FOLLOWING:
  
 KIZZI ALEXANDRE, ASSOCIATE PLANNER
 CITY OF WEST PALM BEACH
 DEVELOPMENT SERVICES DEPARTMENT ? PLANNING DIVISION
 401 CLEMATIS STREET - P.O. BOX 3147
 WEST PALM BEACH, FLORIDA 33402
  
 TTY: 800.955.8771
 E: [email protected]
  
 W: WPB.ORG
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved