Plan Review Details - Permit 21010733
Plan Review Stops For Permit 21010733
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status N Date 2022-03-22 Cont ID  
Sent By lmarchan Date 2022-03-22 Time 12:59 Rev Time 0.00
Received By lmarchan Date 2022-03-22 Time 12:59 Sent To  
Notes
2022-03-22 12:59:20SEE 21030310

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2021-01-25 Cont ID  
Sent By shill Date 2021-01-25 Time 18:00 Rev Time 0.00
Received By shill Date 2021-01-25 Time 18:00 Sent To  
Notes
2021-01-25 18:16:38****CORRECTIONS****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 1. FS553, THE WORK SHOWN ON THE PLAN IS MORE THAN
 PLUMBING WORK. HAVE A CONTRACTOR LICENSED FOR THE SCOPE
 SUBMIT APPLICATION AND PLANS. THIS PERMIT WILL BE MADE
 THE PRIMARY PERMIT (INTERIOR RENOVATION PERMIT) AND
 YOUR PERMIT WILL BE THE PLUMBING SUB.
  
 FIRE SPRINKLER WORK IS SHOWN AS INCLUDED IN THE SCOPE
 OF WORK FOR PLUMBING. DOES THIS PLUMBING CONTRACTOR
 HAVE A FIRE SPRINKLER LICENSE? IF YES, A SEPARATE
 PERMIT WILL BE REQUIRED. THIS IS NOT INCLUDED IN A
 PLUMBING PERMIT. REVISE THE NOTE TO CLARIFY THAT THIS
 IS NOT INCLUDED IN SCOPE FOR PLUMBING.
  
  

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2021-02-05 Cont ID  
Sent By lcrespo Date 2021-02-05 Time 15:10 Rev Time 0.00
Received By lcrespo Date 2021-01-21 Time 09:43 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status N Date 2021-01-27 Cont ID  
Sent By lcrespo Date 2021-01-27 Time 13:54 Rev Time 0.00
Received By lcrespo Date 2021-01-26 Time 13:07 Sent To  
Notes
2021-01-27 13:55:0001/27/21 1ST PLUMBING REVIEW**DENIED** WITH COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME, AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. PLEASE PROVIDE WHAT TYPE OF OCCUPANCY THIS INTERIOR
 BUILD-OUT WILL BE AND THE OCCUPANCY LOAD PER THE WPB
 AMENDMENT TO FBC TO 107.3.5.1.1.
  
 2. WHERE TOILET ROOMS ARE PROVIDED, EACH TOILET ROOM
 SHALL COMPLY WITH 603. WHERE BATHING ROOMS ARE
 PROVIDED, EACH BATHING ROOM SHALL COMPLY WITH 603. THE
 BATHROOM ON THE SECOND FLOOR HAS TO COMPLY WITH THE
 2020 ACCESSIBILITY CODE;
  
 A. THE TURNING SPACE COMPLYING WITH 304 SHALL BE
 PROVIDED WITHIN THE ROOM PER THE 2020 FBC ACC SECTION
 603.2.1.
  
 B. DOORS SHALL NOT SWING INTO THE CLEAR FLOOR SPACE OR
 CLEARANCE REQUIRED FOR ANY FIXTURE. DOORS SHALL BE
 PERMITTED TO SWING INTO THE REQUIRED TURNING SPACE PER
 THE 2020 FBC ACC SECTION 60.3.2.3.
  
 C. A CLEAR FLOOR SPACE COMPLYING WITH 305, POSITIONED
 FOR A FORWARD APPROACH, AND KNEE AND TOE CLEARANCE
 COMPLYING WITH 306 SHALL BE PROVIDED PER THE 2020 ACC
 FBC SECTION 606.2.
  
 D. SHOWER COMPARTMENTS SHALL HAVE SIZES AND CLEARANCES
 COMPLYING WITH 2020 FBC SECTION 608.2.
  
 E. THE CONTROLS, FAUCETS, AND SHOWER SPRAY UNITS SHALL
 COMPLY WITH 309.4. PER THE 2020 FBC ACC SECTION 608.5.
  
 F. THE GRAB BARS FOR WATER CLOSETS SHALL COMPLY WITH
 609. GRAB BARS SHALL BE PROVIDED ON THE SIDEWALL
 CLOSEST TO THE WATER CLOSET AND ON THE REAR WALL.
 PLEASE REFER TO EXCEPTION 1 ON REINFORCEMENT PER THE
 2020 FBC SECTION 604.5 (1).
  
 3. THIS IS A 2021 PERMIT, AND ON-PAGE P0.1 AND P3.1, IT
 REFERS TO THE 2017 CODE. PLEASE CHANGE TO REFER TO THE
 CURRENT CODE PER THE WPB AMENDMENTS TO FBC 102.4.
  
 4. PLEASE PROVIDE CLEAR FLOOR SPACE FOR ACCESSIBLE
 EMPLOYEE BRAKE KITCHEN AND GIVE A CABINET HEIGHT DETAIL
 THAT COMPLIES WITH 2020 FBC ACC SEC. 606.3.
  
 5. ON SHEET P2.1 ON NOTE 3 FOR THE ICEMAKER AND COFFEE
 MAKER, ADD TO THE NOTE THAT THE BACKFLOW DEVICE SHALL
 COMPLY WITH THE ASSE 1024 NON-CARBONATED.
  
 6. PLEASE SHOW A HAMMER ARRESTOR FOR THE REFRIGERATOR
 ICEMAKER TO CONFORM TO ASSE 1010 PER THE 2020 FBC
 SECTION 609.4.
  
 7. PLEASE SHOW ALL SHUTOFF VALVES ON ISOMETRIC DRAWING
 PER THE WPB AMENDMENTS TO FBC 107.2.1.
  
 8. PLEASE PROVIDE A SHUTOFF VALVE TO THE RISER TO THE
 SECOND-FLOOR BATHROOM WITH ACCESS PER THE 2020 FBC
 SECTION P 606.1(4).
  
 WHEN RESUBMITTING PLANS, PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY NECESSARY PAGES.
 A TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW
 COMMENT NUMBER, WITH A DESCRIPTION OF THE REVISION
 MADE, IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE
 THE CHANGES CAN BE FOUND WILL HELP TO EXPEDITE YOUR
 PERMIT. THANK YOU FOR YOUR ANTICIPATED COOPERATION.
  
 HTTPS://CODES.ICCSAFE.ORG/CODES/FLORIDA
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status N Date 2021-02-05 Cont ID  
Sent By lcrespo Date 2021-02-05 Time 15:10 Rev Time 0.00
Received By lcrespo Date 2021-02-05 Time 15:10 Sent To  
Notes
2021-02-05 15:11:38SIGNED AND SEALED DRAWINGS NEED TO BE
 DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR
 ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW - OR -
 IF YOUR ENGINEER DOES NOT HAVE AN ELECTRONIC OR DIGITAL
 SIGNATURE - PLEASE DROP OFF (CITY HALL DROPBOX) THE
 ORIGINAL SIGNED AND SEALED DOCUMENT ALONG WITH A "PLAN
 REVIEW REQUEST FORM" EXPLAINING THE REASON FOR
 SUBMITTING THE DOCUMENT OR DRAWINGS. THE PLAN REVIEW
 REQUEST FORM CAN BE OBTAINED BY EMAILING [email protected] AND
 ASKING FOR THE FORM.


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved