Plan Review Details - Permit 21010553
Plan Review Stops For Permit 21010553
Review Stop AD ADDRESSING
Rev No 1 Status P Date 2021-01-20 Cont ID  
Sent By cpuell Date 2021-01-20 Time 09:09 Rev Time 0.00
Received By cpuell Date 2021-01-20 Time 09:09 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2021-03-29 Cont ID  
Sent By rmcphers Date 2021-03-29 Time 10:47 Rev Time 0.00
Received By rmcphers Date 2021-03-29 Time 10:47 Sent To  
Notes
2021-03-29 10:53:20BUILDING VALUE CHANGED FROM 110,000.00 TO 190,970.00
 1469SQ.FT. X 130.00

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2021-02-11 Cont ID  
Sent By rmcphers Date 2021-02-11 Time 12:47 Rev Time 0.00
Received By rmcphers Date 2021-02-11 Time 11:11 Sent To  
Notes
2021-02-11 12:47:08NEW SFR
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1
 AMENDMENTS
  
 CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107
 1) THE CODE IN EFFECT HAS CHANGED - PLEASE REVISE THE
 DRAWINGS TO SHOW THE DESIGN BASED ON THE CODE IN EFFECT
 (2020 FBC AND ASCE 7-16)
 2) JOB VALUE SHOWN ON THE BUILDING PERMIT APPLICATION
 APPEARS TO BE LOW - THE TOTAL BUILDING COST NEEDS TO BE
 SHOWN ON THE BUILDING PERMIT APPLICATION MARKED
 STRUCTURAL - COST FBC WPB AMENDMENTS ? FOR PERMITTING
 PURPOSES THE VALUE OF ALL LABOR AND MATERIALS REQUIRED
 TO COMPLETE THE PROJECT ARE REQUIRED TO BE INCLUDED IN
 THE COST. FBC 109.3 BUILDING PERMIT VALUATION. FOR
 PERMITTING PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS
 SHALL BE TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL,
 ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH,
 RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES,
 MARKETING COST, OVERHEAD AND PROFIT; EXCLUDING ONLY
 LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE LATEST
 PUBLISHED DATA OF NATIONAL CONSTRUCTION COST ANALYSIS
 SERVICES (MARSHALL ? SWIFT, MEANS, ETC.) AS PUBLISHED
 BY INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT
 VALUATION SHALL BE SET BY THE BUILDING OFFICIAL.

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2021-03-15 Cont ID  
Sent By equinone Date 2021-03-15 Time 11:03 Rev Time 0.00
Received By equinone Date 2021-03-15 Time 11:02 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2021-02-02 Cont ID  
Sent By equinone Date 2021-02-02 Time 09:21 Rev Time 0.00
Received By equinone Date 2021-02-02 Time 09:20 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2021-03-29 Cont ID  
Sent By rmcphers Date 2021-03-29 Time 10:54 Rev Time 0.00
Received By rmcphers Date 2021-03-12 Time 12:12 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date   Cont ID  
Sent By kalexand Date 2021-02-11 Time 13:24 Rev Time 0.00
Received By lmarchan Date 2021-01-19 Time 08:19 Sent To  
Notes
***NONE***

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 2 Status P Date 2021-04-12 Cont ID  
Sent By lmarchan Date 2021-04-12 Time 15:24 Rev Time 0.00
Received By lmarchan Date 2021-03-29 Time 13:09 Sent To  
Notes
2021-04-12 10:34:49MU-2021-16533 - $4236.78 - PAID
2021-03-29 13:09:523/29/21 EMAILED IMPACT FEE OFFICE FOR REVIEW. LEM

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 1 Status F Date 2021-02-11 Cont ID  
Sent By rmcphers Date 2021-02-11 Time 12:47 Rev Time 0.00
Received By rmcphers Date 2021-02-11 Time 12:47 Sent To  
Notes
2021-02-11 12:56:08PLANS WILL BE REVIEWED BY THE PBC IMPACT FEE OFFICE
 DIGITALLY VIA PROJECTDOX UPON NOTIFICATION BY THIS
 OFFICE. NOTIFICATION MAY OCCUR WHEN PLANS ARE NEAREST
 FINAL FORM. YOU MAY COORDINATE WITH THE IMPACT FEE
 OFFICE AT (561) 233-5025 OR SIMPLY UPLOAD THE MUNICIPAL
 IMPACT FEE QUESTIONNAIRE FORM TO YOUR PROJECT AND NAME
 THE FILE MUNICIPAL IMPACT FEE QUESTIONNAIRE. THE FORM
 CAN BE FOUND AT: HTTP://DISCOVER.PBCGOV.ORG/PZB/ADMINIS
 TRATION/PDF/IMPACTFEES/FORMS/QUESTIONNAIRE.PDF
  
 UPON APPROVAL AND FEE PAYMENT, PLEASE UPLOAD THE
 RECEIPT TO YOUR PROJECT OR EMAIL IT TO
 [email protected] .
  

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2021-03-25 Cont ID  
Sent By medwards Date 2021-03-25 Time 12:57 Rev Time 0.00
Received By medwards Date 2021-03-25 Time 12:57 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2021-01-27 Cont ID  
Sent By medwards Date 2021-01-27 Time 05:56 Rev Time 0.00
Received By medwards Date 2021-01-27 Time 05:51 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status P Date 2021-03-19 Cont ID  
Sent By lcrespo Date 2021-03-19 Time 11:25 Rev Time 0.00
Received By lcrespo Date 2021-03-19 Time 10:57 Sent To  
Notes
2021-03-19 11:27:0303/19/21 REVIEWED FOR CODE COMPLIANCE (PLUMBING)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS, OR THEIR REPRESENTATIVES
 FROM THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL,
 STATE, AND NATIONAL CODES AND STANDARDS IN EFFECT AT
 THE TIME OF PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK
 OF EVERY ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop P PLUMBING
Rev No 1 Status P Date 2021-01-21 Cont ID  
Sent By lcrespo Date 2021-01-21 Time 12:06 Rev Time 0.00
Received By lcrespo Date 2021-01-21 Time 12:06 Sent To  
Notes
2021-01-21 12:07:0701/21/21 REVIEWED FOR CODE COMPLIANCE (PLUMBING)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS, OR THEIR REPRESENTATIVES
 FROM THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL,
 STATE, AND NATIONAL CODES AND STANDARDS IN EFFECT AT
 THE TIME OF PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK
 OF EVERY ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status P Date 2021-02-11 Cont ID  
Sent By rmcphers Date 2021-02-11 Time 12:47 Rev Time 0.00
Received By rmcphers Date 2021-02-11 Time 12:47 Sent To  
Notes
2021-02-11 12:48:34A BUILDING PERMIT APPLICATION IS REQUIRED (MARKED
 ROOFING)

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2021-03-25 Cont ID  
Sent By medwards Date 2021-03-25 Time 13:00 Rev Time 0.00
Received By medwards Date 2021-03-25 Time 13:00 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2021-02-11 Cont ID  
Sent By rmcphers Date 2021-02-11 Time 12:53 Rev Time 0.00
Received By rmcphers Date 2021-02-11 Time 12:53 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2021-03-25 Cont ID  
Sent By kalexand Date 2021-03-25 Time 10:59 Rev Time 0.00
Received By kalexand Date 2021-03-25 Time 10:59 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2021-02-11 Cont ID  
Sent By kalexand Date 2021-02-11 Time 13:20 Rev Time 0.00
Received By kalexand Date 2021-02-11 Time 13:19 Sent To I
Notes
2021-02-11 13:24:28ZONING PLAN REVIEW
 ________________________________________
  
 REVIEW STATUS: FAILED
 ________________________________________
  
 PLEASE PROVIDE A WRITTEN RESPONSE TO THE FOLLOWING PLAN
 REVIEW COMMENTS:
  
 1. PROVIDE THE TOTAL HEIGHT OF THE PROPOSED HOME ON AN
 ELEVATION PLAN. PURSUANT TO THE ZLDR, SECTION 94-611,
 HEIGHT OF STRUCTURE MEANS THE VERTICAL DISTANCE FROM
 THE AVERAGE ELEVATION OF THE FINISHED GRADE OF THE
 STRUCTURE TO THE HIGHEST PORTION OF THE STRUCTURE,
 SUBJECT TO SPECIFIED HEIGHT REQUIREMENTS OF THIS
 CHAPTER. FOR BUILDINGS, THE HEIGHT SHALL BE MEASURED AS
 THE VERTICAL DISTANCE FROM THE AVERAGE ELEVATION OF THE
 FINISHED GRADE OF THE BUILDING TO THE HIGHEST POINT OF
 THE TOP OF THE STRUCTURE OF A FLAT ROOF, OR TO THE DECK
 LINE OF A MANSARD ROOF, OR TO THE MEAN HEIGHT LEVEL
 BETWEEN EAVES AND RIDGE FOR GABLE, HIP, AND GAMBREL
 ROOFS.
  
 ________________________________________
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
  
 IF YOU SUBMITTED A PAPER APPLICATION, AND YOU WOULD
 LIKE TO RESUBMIT ELECTRONICALLY, EMAIL
 [email protected] AND REQUEST TO HAVE YOUR
 PROJECT CONVERTED TO PROJECTDOX. YOU WILL RECEIVE LOG
 IN INFORMATION AND A LINK TO UPLOAD YOUR RESUBMITTAL.
 PLEASE BE SURE TO ?COMPLETE THE UPLOAD TASK? WHEN YOU
 ARE FINISHED UPLOADING.
 ________________________________________
  
 QUESTIONS/COMMENTS, PLEASE CONTACT THE FOLLOWING:
  
 KIZZI ALEXANDRE, ASSOCIATE PLANNER
 CITY OF WEST PALM BEACH
 DEVELOPMENT SERVICES DEPARTMENT ? PLANNING DIVISION
 401 CLEMATIS STREET - P.O. BOX 3147
 WEST PALM BEACH, FLORIDA 33402
  
 E: [email protected]
  
 W: WPB.ORG
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved