Plan Review Stops For Permit 21010260 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
4 |
Status |
P |
Date |
2021-04-16 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2021-04-16 |
Time |
07:42 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2021-04-16 |
Time |
07:42 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
P |
Date |
2021-03-12 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2021-03-12 |
Time |
13:40 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2021-03-12 |
Time |
13:40 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
F |
Date |
2021-02-16 |
|
|
Cont ID |
|
Sent By |
mcphers |
Date |
2021-02-16 |
Time |
09:42 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2021-02-16 |
Time |
09:42 |
Sent To |
|
|
Notes |
2021-02-16 10:00:43 | ROOFING | | REVIEWED BY ROGER MCPHERSON | | 561-805-6716 | | [email protected]. | | CODE USED FOR REVIEW - 2017 FBC WITH WPB CHAPTER 1 | | AMENDMENTS | | | | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 | | 1) ROOFING SYSTEM TO BE USED ON THE PROVIDED PRODUCT | | APPROVAL REQUIRES ADDITIONAL SIGNED AND SEALED | | ATTACHMENT DETAILS FROM AN ARCHITECT OR ENGINEER FOR | | ROOF WIND ZONES 2 AND 3 WHICH REQUIRE A HIGHER PRESSURE | | THAN THE MAXIMUM SHOWN ON THE PRODUCT APPROVAL (-52.5) | | - SEE GENERAL LIMITATION NOTE NUMBER 7 ON THE PRODUCT | | APPROVAL. (ZONE 1 = -31.0 ZONE 2 = -52.0 ZONE 3 = | | -78.0) | | 2) PLEASE PROVIDE THE ADDITIONAL JOB COST ON THE | | REVISION FORM. | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2021-01-22 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2021-01-22 |
Time |
13:27 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2021-01-22 |
Time |
13:13 |
Sent To |
|
|
Notes |
2021-01-22 13:21:26 | ROOFING | | REVIEWED BY ROGER MCPHERSON | | 561-805-6716 | | [email protected]. | | CODE USED FOR REVIEW - 2017 FBC WITH WPB CHAPTER 1 | | AMENDMENTS | | | | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 | | 1) DRAWINGS FOR PERMIT 20020932 DO NOT SHOW A FLAT | | ROOF. PLEASE PROVIDE A SITE PLAN SHOWING THE LOCATION | | OF THE FLAT ROOF TO BE INSTALLED. | | 2) ROOFING SYSTEM TO BE USED ON THE PROVIDED PRODUCT | | APPROVAL REQUIRES ADDITIONAL SIGNED AND SEALED | | ATTACHMENT DETAILS FROM AN ARCHITECT OR ENGINEER FOR | | ROOF WIND ZONES 2 AND 3 WHICH REQUIRE A HIGHER PRESSURE | | THAN THE MAXIMUM SHOWN ON THE PRODUCT APPROVAL (-52.5) | | - SEE GENERAL LIMITATION NOTE NUMBER 7 ON THE PRODUCT | | APPROVAL. | | 3) PLEASE PROVIDE THE ADDITIONAL JOB COST ON THE | | REVISION FORM. | | |
|
|
Review Stop |
HIST |
HISTORICAL |
Rev No |
2 |
Status |
P |
Date |
2021-02-01 |
|
|
Cont ID |
|
Sent By |
aborngra |
Date |
2021-02-01 |
Time |
10:36 |
Rev Time |
0.00 |
Received By |
aborngra |
Date |
2021-02-01 |
Time |
10:02 |
Sent To |
|
|
Notes |
|
|
Review Stop |
HIST |
HISTORICAL |
Rev No |
1 |
Status |
F |
Date |
2021-01-27 |
|
|
Cont ID |
|
Sent By |
aborngra |
Date |
2021-01-27 |
Time |
12:42 |
Rev Time |
0.00 |
Received By |
aborngra |
Date |
2021-01-27 |
Time |
12:41 |
Sent To |
|
|
Notes |
2021-01-27 12:42:23 | PERMIT HAS FAILED: | | | | WHAT IS THE FLAT ROOF BEING USED FOR? THE HOUSE DOES | | NOT HAVE A FLAT ROOF. | | | | AARON BORNGRABER | | HISTORIC PRESERVATION PLANNER | DEVELOPMENT SERVICES | | PLANNING DIVISION | | [email protected] | OFFICE: 561.822.1428 | TTY: | | 800.955.8771 | | 401 CLEMATIS STREET | P.O BOX 3147 | WEST PALM BEACH, | | FL 33402 | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
6 |
Status |
N |
Date |
2021-05-19 |
|
|
Cont ID |
|
Sent By |
equinone |
Date |
2021-05-19 |
Time |
08:46 |
Rev Time |
0.00 |
Received By |
equinone |
Date |
2021-05-18 |
Time |
17:08 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
5 |
Status |
N |
Date |
2021-05-03 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2021-05-03 |
Time |
16:40 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2021-05-03 |
Time |
15:52 |
Sent To |
I |
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
4 |
Status |
N |
Date |
2021-04-16 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2021-04-16 |
Time |
07:43 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2021-04-12 |
Time |
11:25 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2021-03-12 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2021-03-12 |
Time |
13:41 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2021-02-25 |
Time |
07:52 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2021-02-16 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2021-02-16 |
Time |
10:01 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2021-01-28 |
Time |
16:51 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2021-01-27 |
|
|
Cont ID |
|
Sent By |
cpuell |
Date |
2021-01-27 |
Time |
12:51 |
Rev Time |
0.00 |
Received By |
cpuell |
Date |
2021-01-11 |
Time |
13:58 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
6 |
Status |
P |
Date |
2021-05-19 |
|
|
Cont ID |
|
Sent By |
equinone |
Date |
2021-05-19 |
Time |
08:46 |
Rev Time |
0.00 |
Received By |
equinone |
Date |
2021-05-19 |
Time |
08:46 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
5 |
Status |
F |
Date |
2021-05-03 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2021-05-03 |
Time |
16:21 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2021-05-03 |
Time |
16:00 |
Sent To |
|
|
Notes |
2021-05-03 16:37:39 | DIGITAL REVIEW COMMENT: | | | | 1- ROOF FRAMING PLAN DATED 3/16/21 HAVE A COPY OF THE | | ARCHITECT'S DIGITAL SIGNATURE. THIS IS NOT ALLOWED. | | DRAWINGS WITH DIGITAL SIGNATURE NEED TO BE UPLOADED TO | | PROJECTDOX. SEC. 61G1-16.005 . | | | | ARCHITECTS | | 61G1-16.005 PROCEDURES FOR DIGITALLY SIGNING AND | | SEALING AND FOR ELECTRONICALLY TRANSMITTING PLANS, | | SPECIFICATIONS, REPORTS OR OTHER DOCUMENTS. | | | | | | OR PROVIDE HARD COPY PLANS WITH THE ORIGINAL SEAL AND | | SIGNATURE WHEN SUBMITTING DOCUMENTS FOR PUBLIC RECORDS | | AS REQUIRED BY 61G1-16.003 FAC. | | | | | | NOTE: | | RAS 117 CALCULATIONS WITH ENGINEER'S EMBOSSED SEAL AND | | ORIGINAL SIGNATURE MATCH APPROVED ONE. JG. | | | | | | PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY | | QUESTIONS REGARDING THESE COMMENTS, | | JULIO GOMEZ | | COMMERCIAL COMBINATION PLANS EXAMINER | | DEVELOPMENT SERVICES DEPARTMENT | | BUILDING DIVISION | | (561)805-6712 | | [email protected] | | |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
4 |
Status |
F |
Date |
2021-04-16 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2021-04-16 |
Time |
07:42 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2021-04-16 |
Time |
07:42 |
Sent To |
|
|
Notes |
2021-04-16 07:43:03 | THE ADDITIONAL ATTACHMENT LETTER FROM THE ENGINEER = | | SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE | | DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR | | ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW. | | DRAWINGS DO NOT SHOW IN "ADOBE READER" AS | | DIGITALLY/ELECTRONICALLY SIGNED. - OR - IF YOUR | | ARCHITECT OR ENGINEER DOES NOT HAVE AN ELECTRONIC OR | | DIGITAL SIGNATURE ? YOU CAN MAIL IN OR DROP OFF THE | | ORIGINAL SIGNED AND SEALED DRAWINGS/DOCUMENTS TO THE | | FRONT DESK IN THE BUILDING DEPT. AT THE CITY HALL |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
3 |
Status |
F |
Date |
2021-03-12 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2021-03-12 |
Time |
13:40 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2021-03-12 |
Time |
13:40 |
Sent To |
|
|
Notes |
2021-03-12 13:40:59 | SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE | | DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR | | ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW. | | DRAWINGS DO NOT SHOW IN "ADOBE READER" AS | | DIGITALLY/ELECTRONICALLY SIGNED. - OR - IF YOUR | | ARCHITECT OR ENGINEER DOES NOT HAVE AN ELECTRONIC OR | | DIGITAL SIGNATURE ? YOU CAN MAIL IN OR DROP OFF THE | | ORIGINAL SIGNED AND SEALED DRAWINGS/DOCUMENTS TO THE | | FRONT DESK IN THE BUILDING DEPT. AT THE CITY HALL |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
2 |
Status |
N |
Date |
2021-02-16 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2021-02-16 |
Time |
10:00 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2021-02-16 |
Time |
10:00 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
N |
Date |
2021-01-22 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2021-01-22 |
Time |
13:27 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2021-01-22 |
Time |
13:27 |
Sent To |
|
|
Notes |
|
|