Plan Review Details - Permit 20121105
Plan Review Stops For Permit 20121105
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2021-08-23 Cont ID  
Sent By rmcdouga Date 2021-08-23 Time 13:45 Rev Time 0.00
Received By rmcdouga Date 2021-08-23 Time 13:45 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2021-07-23 Cont ID  
Sent By rmcdouga Date 2021-07-23 Time 09:22 Rev Time 0.00
Received By rmcdouga Date 2021-07-23 Time 09:22 Sent To  
Notes
2021-07-23 09:33:31PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC SEVENTH EDITION (2020)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) THE ENGINEER'S DRAWINGS SPECIFY ASCE7-10 WHICH IS
 THE STANDARD REFERENCED IN THE FBC SIXTH EDITION
 (2017). THE CURRENT CODE IS THE FBC SEVENTH EDITION
 (2020) WHICH REFERENCES ASCE7-16 AND WENT INTO EFFECT
 ON DECEMBER 31, 2020. ALL NEW PERMITS APPLIED FOR ON OR
 AFTER THAT DATE ARE REQUIRED TO COMPLY WITH AND
 REFERENCE THE 2020 FBC SEVENTH EDITION AND ASCE7-16. FS
 CHAPTER 553
  
 2) THE ENGINEERING DOCUMENT REQUIRES THE AWNING COVERS
 TO BE REMOVED WHEN WINDS ARE EXPECTED TO EXCEED 75 MPH.
 SUBMIT TWO SETS OF DETAILED AWNING REMOVAL INSTRUCTIONS
 WITH PHOTOGRAPHS/DRAWINGS THAT SHOW HOW THIS IS DONE IN
 TERMS THAT A LAYMAN WILL UNDERSTAND. THESE INSTRUCTIONS
 ARE TO BE PROVIDED TO THE PROPERTY OWNER, OWNER'S
 REPRESENTATIVE OR LESSEE. FBC 107.2.1
  

Review Stop HIST HISTORICAL
Rev No 2 Status P Date 2021-08-16 Cont ID  
Sent By fmittner Date 2021-08-16 Time 08:42 Rev Time 0.00
Received By fmittner Date 2021-08-16 Time 08:42 Sent To  
Notes
***NONE***

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2021-08-03 Cont ID  
Sent By fmittner Date 2021-08-03 Time 12:56 Rev Time 0.00
Received By fmittner Date 2021-08-03 Time 12:56 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2021-08-23 Cont ID  
Sent By rmcdouga Date 2021-08-23 Time 13:46 Rev Time 0.00
Received By rmcdouga Date 2021-08-04 Time 10:27 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2021-08-03 Cont ID  
Sent By lmarchan Date 2021-08-03 Time 13:25 Rev Time 0.00
Received By lmarchan Date 2021-06-30 Time 14:23 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2021-08-23 Cont ID  
Sent By rmcdouga Date 2021-08-23 Time 13:46 Rev Time 0.00
Received By rmcdouga Date 2021-08-23 Time 13:46 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2021-07-23 Cont ID  
Sent By rmcdouga Date 2021-07-23 Time 09:23 Rev Time 0.00
Received By rmcdouga Date 2021-07-23 Time 09:22 Sent To  
Notes
2021-07-23 09:24:00SIGNATURE WILL NEED TO BE VERIFIED WHEN UPDATED
 ENGINEERING IS SUBMITTED.

Review Stop Z ZONING
Rev No 1 Status P Date 2021-08-03 Cont ID  
Sent By fmittner Date 2021-08-03 Time 12:58 Rev Time 0.00
Received By fmittner Date 2021-08-03 Time 12:58 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved