Plan Review Details - Permit 20120429
Plan Review Stops For Permit 20120429
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2020-12-23 Cont ID  
Sent By rmcphers Date 2020-12-23 Time 10:52 Rev Time 0.00
Received By rmcphers Date 2020-12-23 Time 10:52 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2020-12-11 Cont ID  
Sent By rmcphers Date 2020-12-11 Time 12:56 Rev Time 0.00
Received By rmcphers Date 2020-12-11 Time 12:18 Sent To  
Notes
2020-12-11 12:55:52STAIR SHOP DRAWINGS
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2017 FBC WITH WPB CHAPTER 1
 AMENDMENTS
  
 CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107
 1) PLEASE SHOW STAIR RISER HEIGHT AND TREAD DEPTH TO
 COMPLY WITH FBC 1011.5.2 RISER HEIGHT AND TREAD DEPTH.
 STAIR RISER HEIGHTS SHALL BE 7 INCHES (178 MM) MAXIMUM
 AND 4 INCHES (102 MM) MINIMUM. THE RISER HEIGHT SHALL
 BE MEASURED VERTICALLY BETWEEN THE NOSINGS OF ADJACENT
 TREADS. RECTANGULAR TREAD DEPTHS SHALL BE 11 INCHES
 (279 MM) MINIMUM MEASURED HORIZONTALLY BETWEEN THE
 VERTICAL PLANES OF THE FOREMOST PROJECTION OF ADJACENT
 TREADS AND AT A RIGHT ANGLE TO THE TREAD?S NOSING.
 2) SHOP DRAWINGS SHOULD BE REVIEWED AND MARKED APPROVED
 BY THE BUILDING DESIGNER OF RECORD FBC WPB 107.3.4.1
 3) PLEASE SHOW THE STAIR RISERS TO COMPLY WITH FBC
 1011.5.5.3 (1).SOLID RISERS ARE NOT REQUIRED FOR
 STAIRWAYS THAT ARE NOT REQUIRED TO COMPLY WITH SECTION
 1009, PROVIDED THAT THE OPENING BETWEEN TREADS DOES NOT
 PERMIT THE PASSAGE OF A SPHERE WITH A DIAMETER OF 4
 INCHES (102 MM). (DRAWINGS SHOW = 4" WHICH WILL NOT
 REJECT A 4" OBJECT).

Review Stop ENG ENGINEERING CSD
Rev No 1 Status N Date 2020-12-18 Cont ID  
Sent By rrossano Date 2020-12-18 Time   Rev Time 0.00
Received By rrossano Date 2020-12-18 Time   Sent To I
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-12-23 Cont ID  
Sent By rmcphers Date 2020-12-23 Time 10:53 Rev Time 0.00
Received By rmcphers Date 2020-12-22 Time 11:08 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-12-18 Cont ID  
Sent By lmarchan Date 2020-12-18 Time 14:31 Rev Time 0.00
Received By lmarchan Date 2020-12-10 Time 17:38 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2020-12-23 Cont ID  
Sent By rmcphers Date 2020-12-23 Time 10:52 Rev Time 0.00
Received By rmcphers Date 2020-12-23 Time 10:52 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2020-12-11 Cont ID  
Sent By rmcphers Date 2020-12-11 Time 12:56 Rev Time 0.00
Received By rmcphers Date 2020-12-11 Time 12:56 Sent To  
Notes
2020-12-11 12:56:59SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE
 DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR
 ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW.
 DRAWINGS DO NOT SHOW IN "ADOBE READER" AS
 DIGITALLY/ELECTRONICALLY SIGNED. - OR - IF YOUR
 ARCHITECT OR ENGINEER DOES NOT HAVE AN ELECTRONIC OR
 DIGITAL SIGNATURE ? YOU CAN DROP OFF THE ORIGINAL
 SIGNED AND SEALED DRAWINGS/DOCUMENTS TO THE FRONT DECK
 IN THE BUILDING DEPT. AT THE CITY HALL