Plan Review Stops For Permit 20111124 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
P |
Date |
2021-03-08 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2021-03-08 |
Time |
14:48 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2021-03-08 |
Time |
14:47 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2020-12-15 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2020-12-15 |
Time |
08:06 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2020-12-15 |
Time |
08:04 |
Sent To |
|
|
Notes |
2020-12-15 08:07:23 | LIGHT POLE | | REVIEWED BY ROGER MCPHERSON | | 561-805-6716 | | [email protected]. | | CODE USED FOR REVIEW - 2017 FBC WITH WPB CHAPTER 1 | | AMENDMENTS | | | | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 | | SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE | | DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR | | ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW. | | DRAWINGS DO NOT SHOW IN "ADOBE READER" AS | | DIGITALLY/ELECTRONICALLY SIGNED. - OR - IF YOUR | | ARCHITECT OR ENGINEER DOES NOT HAVE AN ELECTRONIC OR | | DIGITAL SIGNATURE ? YOU CAN DROP OFF THE ORIGINAL | | SIGNED AND SEALED DRAWINGS/DOCUMENTS TO THE FRONT DESK | | IN THE BUILDING DEPT. AT THE CITY HALL |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2020-12-11 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2020-12-11 |
Time |
13:17 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2020-12-10 |
Time |
08:04 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2021-10-25 |
|
|
Cont ID |
|
Sent By |
mpeterso |
Date |
2021-10-25 |
Time |
09:43 |
Rev Time |
0.00 |
Received By |
mpeterso |
Date |
2021-10-25 |
Time |
09:43 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2021-03-31 |
|
|
Cont ID |
|
Sent By |
equinone |
Date |
2021-03-31 |
Time |
08:01 |
Rev Time |
0.00 |
Received By |
equinone |
Date |
2021-02-16 |
Time |
05:22 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2021-02-10 |
|
|
Cont ID |
|
Sent By |
cpuell |
Date |
2021-02-10 |
Time |
18:09 |
Rev Time |
0.00 |
Received By |
cpuell |
Date |
2020-11-25 |
Time |
06:44 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
4 |
Status |
P |
Date |
2021-10-25 |
|
|
Cont ID |
|
Sent By |
mpeterso |
Date |
2021-10-25 |
Time |
10:24 |
Rev Time |
0.00 |
Received By |
mpeterso |
Date |
2021-10-25 |
Time |
10:24 |
Sent To |
|
|
Notes |
2021-10-25 10:27:24 | LIGHT POLE NOT BEING USED FOR THIS PROJECT. DOCUMENT | | CRYSTAL CONDO 22FT POLE SS.PDF IS LOCKED AND WILL NOT | | BE ISSUED WITH PERMIT. MPETERSON |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
3 |
Status |
F |
Date |
2021-10-25 |
|
|
Cont ID |
|
Sent By |
mpeterso |
Date |
2021-10-25 |
Time |
09:38 |
Rev Time |
0.00 |
Received By |
mpeterso |
Date |
2021-10-25 |
Time |
09:38 |
Sent To |
|
|
Notes |
2021-10-25 09:42:52 | THE LIGHT POLE ENGINEERING IN PROJECTDOX "SUPPORTING | | DOC" FOLDER SIGNED AND SEALED BY SHAWN ANDERSON P.E. | | STILL APPEARS AS A COPY OF A PAPER SIGNED AND SEALED | | DOCUMENT. | | | | EITHER UPLOAD A DIGITALLY OR ELECTRONICALLY SIGNED | | DOCUMENT TO THE SIGNATURE FOLDER WITH YOUR RESUBMITTAL | | (IF APPLICABLE) AND COMPLETE THE UPLOAD TASK IN | | PROJECTDOX, OR YOU CAN SUBMIT ONE ORIGINAL SIGNED AND | | SEALED PAPER ORIGINAL WITH A WET SIGNATURE TO THE | | BUILDING DIVISION. SIGNATURE DOCUMENTS ARE TYPICALLY | | REVIEWED WITHIN TWO BUSINESS DAYS AFTER SUBMITTAL; | | DIGITALLY SIGNED DOCUMENTS ARE PREFERRED. ' | | | | PLEASE EMAIL [email protected] AND CC TO | | [email protected] | | | | MICHAEL PETERSON | | ELECTRICAL PLANS EXAMINER | | [email protected] | | |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
2 |
Status |
F |
Date |
2021-03-08 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2021-03-08 |
Time |
14:48 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2021-03-08 |
Time |
14:48 |
Sent To |
|
|
Notes |
2021-03-08 14:52:19 | THE LIGHT POLE ENGINEERING IN PROJECTDOX "SUPPORTING | | DOC" FOLDER SIGNED AND SEALED BY SHAWN ANDERSON P.E. | | | | SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE | | DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR | | ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW. | | DRAWINGS DO NOT SHOW IN "ADOBE READER" AS | | DIGITALLY/ELECTRONICALLY SIGNED. - OR - IF YOUR | | ARCHITECT OR ENGINEER DOES NOT HAVE AN ELECTRONIC OR | | DIGITAL SIGNATURE ? YOU CAN MAIL IN OR DROP OFF THE | | ORIGINAL SIGNED AND SEALED DRAWINGS/DOCUMENTS TO THE | | FRONT DESK IN THE BUILDING DEPT. AT THE CITY HALL |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
P |
Date |
2020-12-11 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2020-12-11 |
Time |
13:17 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2020-12-11 |
Time |
13:17 |
Sent To |
|
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
3 |
Status |
P |
Date |
2021-10-22 |
|
|
Cont ID |
|
Sent By |
llouie |
Date |
2021-10-22 |
Time |
|
Rev Time |
0.00 |
Received By |
llouie |
Date |
2021-10-22 |
Time |
|
Sent To |
|
|
Notes |
2021-10-22 14:08:50 | ZONING APPROVED WITH THE FOLLOWING PROVISO: | | | | 1.) ALL OUTDOOR LIGHTING SHALL BE SHIELDED TO REDUCE | | GLARE AND SHALL BE ARRANGED TO REFLECT LIGHT OR GLARE | | AWAY FROM ALL ADJACENT RESIDENTIAL DISTRICTS, ADJACENT | | RESIDENCES, OR PUBLIC THOROUGHFARES. |
|
|
Review Stop |
Z |
ZONING |
Rev No |
2 |
Status |
F |
Date |
2021-03-30 |
|
|
Cont ID |
|
Sent By |
llouie |
Date |
2021-03-30 |
Time |
|
Rev Time |
0.00 |
Received By |
llouie |
Date |
2021-03-30 |
Time |
|
Sent To |
|
|
Notes |
2021-03-30 10:52:40 | ** FAILED ** | | | | PLEASE ADDRESS THE FOLLOWING COMMENTS. RESPOND TO THE | | COMMENTS IN WRITING AND/OR ON THE PLANS WHERE | | APPLICABLE: | | | | 1.) SETBACK DISTANCE FROM THE LIGHT POLE FIXTURES TO | | THE PROPERTY LINES SHALL BE SHOWN IN THE SITE PLAN (IN | | ADDITION TO THE SITE PLAN EXHIBIT (SHEET SPE-1)). | | PLEASE NOTE THAT THE LIGHT POLE FIXTURES MUST BE | | SETBACK A MINIMUM OF 25 FT. FROM THE FRONT PROPERTY | | LINE; 5 FT. FROM THE SIDE AND REAR PROPERTY LINES. THE | | LIGHT FIXTURES DO NOT SEEM TO COMPLY WITH THE SETBACK | | REQUIREMENTS. AN ALTERNATIVE MAY BE TO PROVIDE LIGHTING | | ON THE BUILDING IF THE MINIMUM REQUIRED SETBACKS CANNOT | | BE MET. [ZLDR S.94-304(B)] | | | | 2.) THE PHOTOMETRIC PLAN SHALL CONTAIN THE FOLLOWING | | NOTE: ALL OUTDOOR LIGHTING SHALL BE SHIELDED TO REDUCE | | GLARE AND SHALL BE ARRANGED TO REFLECT LIGHT OR GLARE | | AWAY FROM ALL ADJACENT RESIDENTIAL DISTRICTS, ADJACENT | | RESIDENCES, OR PUBLIC THOROUGHFARES. [ZLDR S.94-309(A)] | | | | 3.) PROVIDED PLANS IN THE PERMIT ARE INCONSISTENT WITH | | THE PROPOSED CHANGES AS PART OF APPLICATION FSPR | | 16-03B, SUBMITTED TO THE PLANNING DIVISION FOR A MINOR | | SITE PLAN AMENDMENT (PENDING REVIEW). PLANS SHALL BE | | CONSISTENT WITH THE PROPOSED CHANGES TO THE SITE. | | | | 4.) APPROVAL OF FSPR 16-03B IS REQUIRED PRIOR TO THE | | APPROVAL OF THIS PERMIT. | | | | | | NOTES: | | | | * ANY CHANGES WHICH DEVIATE FROM THE PLANS APPROVED BY | | THE CITY COMMISSION WILL REQUIRE AN AMENDMENT TO THE | | OCPD (OFFICE COMMERCIAL PLANNED DEVELOPMENT). THE | | AMENDMENT WILL REQUIRE REVIEW AND APPROVAL BY THE | | PLANNING DIVISION PRIOR TO THE APPROVAL OF SUCH CHANGES | | FOR BUILDING PERMIT. | | | | * ANY REVISIONS MAY RESULT IN ADDITIONAL COMMENTS. | | | | * CONTACT LINDA LOUIE @ (561) 822-1458 IF THERE ARE | | QUESTIONS. | | | | * ZONE: MF32 | | | | * REFERENCE: FSPR 16-03B (MINOR SITE PLAN AMENDMENT | | APPLICATION) | | |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
F |
Date |
2021-02-10 |
|
|
Cont ID |
|
Sent By |
llouie |
Date |
2021-02-10 |
Time |
|
Rev Time |
0.00 |
Received By |
llouie |
Date |
2021-02-10 |
Time |
|
Sent To |
|
|
Notes |
2021-02-10 15:27:58 | ** FAILED ** | | | | PLEASE ADDRESS THE FOLLOWING COMMENTS. RESPOND TO THE | | COMMENTS IN WRITING AND/OR ON THE PLANS WHERE | | APPLICABLE: | | | | 1.) SHOW SETBACK DISTANCE FROM THE LIGHT POLE FIXTURES | | TO THE PROPERTY LINE. PLEASE NOTE THAT THE LIGHT POLES | | MUST BE SETBACK AT LEAST 5 FT. FROM THE PROPERTY | | LINE(S). | | | | 2.) THE FOLLOWING NOTE SHALL BE PROVIDED IN THE PLAN | | FOR CONSISTENCY WITH THE LIGHTING REQUIREMENTS OF THE | | ZONING AND LAND DEVELOPMENT REGULATIONS (ZLDRS): ALL | | OUTDOOR LIGHTING SHALL BE SHIELDED TO REDUCE GLARE AND | | SHALL BE ARRANGED TO REFLECT LIGHT OR GLARE AWAY FROM | | ALL ADJACENT RESIDENTIAL DISTRICTS, ADJACENT RESIDENCES | | OR PUBLIC THOROUGHFARES. [ZLDR S.94-309(A)] | | | | | | NOTES: | | | | MINOR SITE PLAN AMENDMENT REQUIRED FOR THE AS-BUILT | | PRIOR TO THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY | | (C.O.). | | | | * ANY REVISIONS MAY RESULT IN ADDITIONAL COMMENTS. | | | | * CONTACT LINDA LOUIE @ (561) 822-1458 IF THERE ARE | | QUESTIONS. | | | | * ZONE: MF20 (THE CRYSTAL) | | |
|
|