Plan Review Details - Permit 20111036
Plan Review Stops For Permit 20111036
Review Stop B BUILDING (STRUCTURAL)
Rev No 5 Status P Date 2021-04-06 Cont ID  
Sent By pvalenti Date 2021-04-06 Time 17:45 Rev Time 0.00
Received By pvalenti Date 2021-04-06 Time 17:44 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status F Date 2021-03-18 Cont ID  
Sent By jgomez Date 2021-03-18 Time 15:09 Rev Time 0.00
Received By jgomez Date 2021-03-18 Time 14:53 Sent To  
Notes
2021-03-18 15:13:2903/18/21 TALKED TO DUANE BURROWES (ARCH.) TO GO OVER
 COMMENTS. NEED TO REVISE THE RAMP EXTENSION DETAILS.
 SEE COMMENTS BELOW. JG.
  
 FOURTH BUILDING REVIEW COMMENTS FOR REVISED DRAWINGS TO
 COMPLY WITH PROVISO:
  
 1- SHEET A4.2:
 A)OK.
  
 ORIGINAL COMMENT:
 B)DETAIL #16 RAMP AND STAIR DETAILS: NEED TO SHOW THE
 TOP AND BOTTOM EXTENSIONS AT RAMP. AND PROVIDE DETAILS.
 SEC. 505.10.1 FBC-ACCESSIBILITY.
  
 NOTE: SEE SECTION 505.10.1 FBC-ACCESSIBILITY AND FIGURE
 505.10.1 FBC-ACCESSIBILITY FOR HANDRAIL EXTENSION
 DETAIL AT RAMPS AND PROVIDE DETAIL AS REQUIRED.
  
  
 RESPONSE:
 TALKED TO DUANE BURROWES (ARCH.). BOTTOM EXTENSION AT
 RAMP SHOWN ON NEW DETAIL #19/A4.2 DOESN'T COMPLY. THE
 EXTENSIONS (TOP AND BOTTOM) SHALL RETURN TO A WALL,
 GUARD, OR THE LANDING SURFACE, OR SHALL BE CONTINUOUS
 TO THE HANDRAIL OF AN ADJACENT RAMP RUN AS REQUIRED BY
 SECTION 505.10.1 FBC-ACCESSIBILITY. REVISE AS REQUIRED.
 ALSO REVISE DETAIL 24/A4.3 AS REQUIRED. AND, PROVIDE
 DETAILS FOR TOP RAMP EXTENSION. SEE FIGURE 505.10.1
 FBC-ACCESSIBILITY.
  
  
 IMPORTANT:
 ACCORDING TO PICTURE UPLOADED TO PROJECTDOX ON 03/01/21
 THE RAMP EXTENSIONS DON'T COMPLY. TOP AND BOTTOM RAMP
 EXTENSIONS DON'T COMPLY AND IS MISSING A PORTION OF THE
 HANDRAIL. COORDINATE WITH DETAIL #23 ON SHEET A4.3 AND
 ABOVE COMMENTS.
  
 PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY
 QUESTIONS REGARDING THESE COMMENTS,
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2021-03-05 Cont ID  
Sent By jgomez Date 2021-03-05 Time 14:18 Rev Time 0.00
Received By jgomez Date 2021-03-05 Time 14:17 Sent To  
Notes
2021-03-05 14:25:1103/05/21 TALKED TO DUANE BURROWES (ARCH.) TO GO OVER
 COMMENTS. STAIRS EXTENSION DETAIL WAS CLARIFIED. NEED
 RAMP EXTENSION DETAILS. JG.
  
  
 SECOND BUILDING REVIEW COMMENTS FOR REVISED DRAWINGS TO
 COMPLY WITH PROVISO:
  
 1- SHEET A4.2:
 A)OK.
  
 ORIGINAL COMMENT:
 B)DETAIL #16 RAMP AND STAIR DETAILS: NEED TO SHOW THE
 TOP AND BOTTOM EXTENSIONS AT RAMP. AND PROVIDE DETAILS.
 SEC. 505.10.1 FBC-ACCESSIBILITY.
  
 RESPONSE:
 REPEAT COMMENT. NO ADDRESSED. RAMP SHOWS TOP AND BOTTOM
 EXTENSIONS BUT DETAILS WERE NOT PROVIDED. NOTE: SEE
 FIGURE 505.10.1 FBC-ACCESSIBILITY FOR HANDRAIL
 EXTENSION DETAIL AT RAMPS AND PROVIDE DETAIL AS
 REQUIRED.
  
 PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY
 QUESTIONS REGARDING THESE COMMENTS,
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2021-03-04 Cont ID  
Sent By jgomez Date 2021-03-04 Time 09:51 Rev Time 0.00
Received By jgomez Date 2021-03-04 Time 09:27 Sent To  
Notes
2021-03-04 09:56:41SECOND BUILDING REVIEW COMMENTS FOR REVISED DRAWINGS TO
 COMPLY WITH PROVISO:
  
 ARCHITECTS-ENGINEERS
 FLORIDA STATUTE 553.80(2)(B):
 WITH RESPECT TO EVALUATION OF DESIGN PROFESSIONALS
 DOCUMENTS, IF A LOCAL GOVERNMENT FINDS IT NECESSARY, IN
 ORDER TO ENFORCE COMPLIANCE WITH THE FLORIDA BUILDING
 CODE AND ISSUE A PERMIT, TO REJECT DESIGN DOCUMENTS
 REQUIRED BY THE CODE THREE OR MORE TIMES FOR FAILURE TO
 CORRECT A CODE VIOLATION SPECIFICALLY AND CONTINUOUSLY
 NOTED IN EACH REJECTION, INCLUDING, BUT NOT LIMITED TO,
 EGRESS, FIRE PROTECTION, STRUCTURAL STABILITY, ENERGY,
 ACCESSIBILITY, LIGHTING, VENTILATION, ELECTRICAL,
 MECHANICAL, PLUMBING, AND GAS SYSTEMS, OR OTHER
 REQUIREMENTS IDENTIFIED BY RULE OF THE FLORIDA BUILDING
 COMMISSION ADOPTED PURSUANT TO CHAPTER 120, THE LOCAL
 GOVERNMENT SHALL IMPOSE, EACH TIME AFTER THE THIRD SUCH
 REVIEW THE PLANS ARE REJECTED FOR THAT CODE VIOLATION,
 A FEE OF FOUR TIMES THE AMOUNT OF THE PROPORTION OF THE
 PERMIT FEE ATTRIBUTED TO PLANS REVIEW
  
  
 1- SHEET A4.2:
 A)OK.
  
 ORIGINAL COMMENT:
 B)DETAIL #16 RAMP AND STAIR DETAILS: NEED TO SHOW THE
 TOP AND BOTTOM EXTENSION AT RAMP. AND PROVIDE DETAILS.
 SEC. 505.10.1 FBC-ACCESSIBILITY.
  
 RESPONSE:
 REPEAT COMMENT. NO ADDRESSED. RAMP SHOWS TOP AND BOTTOM
 EXTENSIONS BUT DETAILS WERE NOT PROVIDED. NOTE: SEE
 FIGURE 505.10.1 FBC-ACCESSIBILITY FOR HANDRAIL
 EXTENSION DETAIL AT RAMPS AND PROVIDE DETAIL AS
 REQUIRED.
  
 C)DETAIL #14 AND DETAIL #17: THE BOTTOM EXTENSION AT
 STAIRS NEED TO EXTEND AT THE SLOPE OF THE STAIR FLIGHT
 AS REQUIRED BY SEC. 505.10.3 FBC-ACCESSIBILITY.
  
 RESPONSE:
 REPEAT COMMENT. DETAIL #17 AND DETAIL #14 DON'T SHOW
 THE BOTTOM EXTENSION AT THE SLOPE OF THE STAIR FLIGHT
 AS REQUIRED BY SEC. 505.10.3 FBC-ACCESSIBILITY. REVISE
 AS REQUIRED.
 NOTE: REVISE DETAIL #22 ON SHEET A4.3 ALSO TO AVOID
 CONFLICTS/DELAYS.
  
 2- OK.
  
 PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY
 QUESTIONS REGARDING THESE COMMENTS,
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2020-11-25 Cont ID  
Sent By jgomez Date 2020-11-25 Time 14:03 Rev Time 0.00
Received By jgomez Date 2020-11-25 Time 11:25 Sent To  
Notes
2020-11-25 14:04:10BUILDING REVIEW COMMENTS FOR REVISED DRAWINGS TO COMPLY
 WITH PROVISO:
  
 1- SHEET A4.2:
 A)OK.
  
 B)DETAIL #16 RAMP AND STAIR DETAILS: NEED TO SHOW THE
 TOP AND BOTTOM EXTENSION AT RAMP. AND PROVIDE DETAILS.
 SEC. 505.10.1 FBC-ACCESSIBILITY.
  
 RESPONSE:
 SEMI COMPLIED. RAMP SHOWS TOP AND BOTTOM EXTENSIONS BUT
 DETAILS WERE NOT PROVIDED.
  
 C)DETAIL #14 AND DETAIL #17: THE BOTTOM EXTENSION AT
 STAIRS NEED TO EXTEND AT THE SLOPE OF THE STAIR FLIGHT
 AS REQUIRED BY SEC. 505.10.3 FBC-ACCESSIBILITY.
  
 RESPONSE:
 DETAIL #17 WAS REVISED BUT DETAIL #14 WAS NOT. ALSO,
 THE EXTENSION SHALL RETURN TO A WALL, GUARD, OR THE
 LANDING SURFACE AS REQUIRED BY SEC. 505.10.3
 FBC-ACCESSIBILITY. REVISE AS REQUIRED.
 NOTE: REVISE DETAIL #22 ON SHEET A4.3 ALSO TO AVOID
 CONFLICTS/DELAYS.
  
 2- OK.
  
 PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY
 QUESTIONS REGARDING THESE COMMENTS,
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2021-04-06 Cont ID  
Sent By pvalenti Date 2021-04-06 Time 17:45 Rev Time 0.00
Received By pvalenti Date 2021-03-31 Time 12:51 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2021-03-18 Cont ID  
Sent By jgomez Date 2021-03-18 Time 18:00 Rev Time 0.00
Received By jgomez Date 2021-03-08 Time 09:50 Sent To I
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2021-03-04 Cont ID  
Sent By jgomez Date 2021-03-04 Time 10:09 Rev Time 0.00
Received By jgomez Date 2021-03-01 Time 12:51 Sent To I
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-12-11 Cont ID  
Sent By cpuell Date 2020-12-11 Time 15:23 Rev Time 0.00
Received By cpuell Date 2020-11-23 Time 13:52 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 4 Status P Date 2021-04-06 Cont ID  
Sent By pvalenti Date 2021-04-06 Time 17:45 Rev Time 0.00
Received By pvalenti Date 2021-04-06 Time 17:44 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status P Date 2021-03-18 Cont ID  
Sent By jgomez Date 2021-03-18 Time 15:32 Rev Time 0.00
Received By jgomez Date 2021-03-18 Time 15:31 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2021-03-04 Cont ID  
Sent By jgomez Date 2021-03-04 Time 10:09 Rev Time 0.00
Received By jgomez Date 2021-03-04 Time 10:09 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2020-11-25 Cont ID  
Sent By jgomez Date 2020-11-25 Time 14:09 Rev Time 0.00
Received By jgomez Date 2020-11-25 Time 14:08 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2020-12-11 Cont ID  
Sent By jroach Date 2020-12-11 Time 14:03 Rev Time 0.00
Received By jroach Date 2020-12-11 Time 14:03 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved