Plan Review Details - Permit 20110676
Plan Review Stops For Permit 20110676
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2021-06-23 Cont ID  
Sent By rmcphers Date 2021-06-23 Time 10:11 Rev Time 0.00
Received By rmcphers Date 2021-06-23 Time 10:11 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2021-01-15 Cont ID  
Sent By rmcphers Date 2021-01-15 Time 08:42 Rev Time 0.00
Received By rmcphers Date 2021-01-15 Time 08:30 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2021-06-21 Cont ID  
Sent By jleahy Date 2021-06-21 Time 10:26 Rev Time 0.00
Received By jleahy Date 2021-06-18 Time 09:57 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2021-01-14 Cont ID  
Sent By jleahy Date 2021-01-14 Time 10:44 Rev Time 0.00
Received By jleahy Date 2021-01-14 Time 09:03 Sent To  
Notes
2021-01-14 10:47:39ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW.
  
 FLORIDA BUILDING CODE 2017 6TH EDITION
 FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 6TH ED
 NFPA 70 2014 EDITION
  
 JAKE LEAHY BN, BU, PX
 ELECTRICAL PLANS EXAMINER II
 561-805-6713
 [email protected]
  
 1) VALUE TOO LOW FOR THIS SIGN (2700), PLEASE SUBMIT A
 SIGNED CONTRACT WITH THE OWNER.
  
 FBC 109.3 BUILDING PERMIT VALUATION. FOR PERMITTING
 PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS SHALL BE
 TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL,
 ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH,
 RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES,
 MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING ONLY
 LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE LATEST
 PUBLISHED DATA OF NATIONAL CONSTRUCTION COST ANALYSIS
 SERVICES (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY
 INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT
 VALUATION SHALL BE SET BY THE BUILDING OFFICIAL.
  
 2) NO ELECTRIC SHOWN FOR SIGN, PLEASE SHOW INTERNAL
 ELECTRIC FOR SIGN AND DISCONNECT THAT IS REQUIRED BY
 600.5(B).
  
  
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2021-06-23 Cont ID  
Sent By rmcphers Date 2021-06-23 Time 10:12 Rev Time 0.00
Received By rmcphers Date 2021-06-10 Time 12:38 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2021-01-15 Cont ID  
Sent By rmcphers Date 2021-01-15 Time 08:43 Rev Time 0.00
Received By rmcphers Date 2020-12-31 Time 10:41 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2021-06-23 Cont ID  
Sent By rmcphers Date 2021-06-23 Time 10:12 Rev Time 0.00
Received By rmcphers Date 2021-06-23 Time 10:11 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2021-01-15 Cont ID  
Sent By rmcphers Date 2021-01-15 Time 08:42 Rev Time 0.00
Received By rmcphers Date 2021-01-15 Time 08:42 Sent To  
Notes
2021-01-15 08:43:36SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE
 DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR
 ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW.
 DRAWINGS DO NOT SHOW IN "ADOBE READER" AS
 DIGITALLY/ELECTRONICALLY SIGNED. - OR - IF YOUR
 ARCHITECT OR ENGINEER DOES NOT HAVE AN ELECTRONIC OR
 DIGITAL SIGNATURE ? YOU CAN MAIL IN OR DROP OFF THE
 ORIGINAL SIGNED AND SEALED DRAWINGS/DOCUMENTS TO THE
 FRONT DESK IN THE BUILDING DEPT. AT THE CITY HALL

Review Stop Z ZONING
Rev No 2 Status P Date 2021-06-22 Cont ID  
Sent By aaponte Date 2021-06-22 Time 17:01 Rev Time 0.00
Received By aaponte Date 2021-06-22 Time 16:59 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2021-01-07 Cont ID  
Sent By elevesqu Date 2021-01-07 Time 08:56 Rev Time 0.00
Received By elevesqu Date 2021-01-07 Time 08:56 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved