Plan Review Details - Permit 20110464
Plan Review Stops For Permit 20110464
Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2020-11-24 Cont ID  
Sent By rrossano Date 2020-11-24 Time   Rev Time 0.00
Received By rrossano Date 2020-11-24 Time   Sent To I
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2020-11-19 Cont ID  
Sent By rrossano Date 2020-11-19 Time   Rev Time  
Received By rrossano Date 2020-11-19 Time   Sent To  
Notes
2020-11-19 22:27:09PLEASE ADDRESS PLUMBING COMMENTS.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-11-25 Cont ID  
Sent By ccarvaja Date 2020-11-25 Time 06:46 Rev Time 0.00
Received By ccarvaja Date 2020-11-24 Time 18:03 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-11-24 Cont ID  
Sent By lcrespo Date 2020-11-19 Time 18:03 Rev Time 0.00
Received By lcrespo Date 2020-11-12 Time 13:47 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status P Date 2020-11-24 Cont ID  
Sent By lcrespo Date 2020-11-24 Time 18:14 Rev Time 0.00
Received By lcrespo Date 2020-11-24 Time 18:14 Sent To  
Notes
2020-11-24 18:17:5611/23/20 REVIEWED FOR CODE COMPLIANCE (PLUMBING)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS, OR THEIR REPRESENTATIVES
 FROM THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL,
 STATE, AND NATIONAL CODES AND STANDARDS IN EFFECT AT
 THE TIME OF PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK
 OF EVERY ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2020-11-17 Cont ID  
Sent By lcrespo Date 2020-11-17 Time 09:49 Rev Time 0.00
Received By lcrespo Date 2020-11-17 Time 09:49 Sent To  
Notes
2020-11-17 09:50:0211/17/20 1ST PLUMBING REVIEW**DENIED** WITH COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. PLEASE PROVIDE FACTORY SIZING CALCULATION BY SCHIER
 PER THE 2017 FBC SEC. 1003.2.
  
 NOTE: SCHIER HAS A PROGRAM TO COMPLY WITH THE
 CALCULATIONS NEEDED.
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS
 NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2020-11-24 Cont ID  
Sent By lcrespo Date 2020-11-24 Time 18:07 Rev Time 0.00
Received By lcrespo Date 2020-11-24 Time 18:07 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved