|
 |
 |
 |
 |
 |
Plan Review Details - Permit 20110455
Plan Review Stops For Permit 20110455 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
P |
Date |
2020-12-03 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2020-12-03 |
Time |
08:48 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2020-12-03 |
Time |
08:47 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2020-11-12 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2020-11-12 |
Time |
16:43 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2020-11-12 |
Time |
16:43 |
Sent To |
|
|
Notes |
2020-11-12 16:52:34 | PLAN | | REVIEW COMMENTS | | | | 1ST REVIEW: FBC SIXTH EDITION (2017) | | ROBERT MCDOUGAL, CBO | | COMMERCIAL COMBINATION PLANS EXAMINER | | (561) 805-6714 | | [email protected] | | | | DENIED BY BUILDING | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | 1) THE GARAGE DOOR OPENING IS ALSO ONE OF THE TWO | | REQUIRED FLOOD OPENINGS REQUIRED FOR THIS PROJECT. IN | | ADDITION TO THE 913 SQUARE INCH NET OPENING (ALLOWING | | FOR GRATE) ON THE NORTH WALL THERE IS 9, 273 SQUARE | | INCHES OF OPENING BELOW THE DESIGN FLOOD ELEVATION | | (DFE) THAT IS COUNTED TOWARD THE REQUIRED AREA OF FLOOD | | VENT OPENINGS. SEE ARCHITECTURAL SHEET A2.1 OF THE | | PLANS FOR NOTES ON THE FLOOD VENT OPENINGS. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2020-12-03 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2020-12-03 |
Time |
08:50 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2020-12-01 |
Time |
10:08 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2020-11-12 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2020-11-12 |
Time |
16:43 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2020-11-10 |
Time |
16:18 |
Sent To |
|
|
Notes |
|
|
Review Stop |
NFIP |
NFIP REVIEW ACTIVITY |
Rev No |
2 |
Status |
P |
Date |
2020-12-03 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2020-12-03 |
Time |
08:39 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2020-12-03 |
Time |
08:39 |
Sent To |
|
|
Notes |
2020-12-03 08:39:32 | MAP 12099C 0579F 10/5/2017 | | FLOOD ZONE AE | | BFE = 12.7' (NAVD88) | | DFE = 12.7' + 2' (NAVD88) | | 26* 41' 40.52"N | | 80* 04' 27.06"W |
|
|
Review Stop |
NFIP |
NFIP REVIEW ACTIVITY |
Rev No |
1 |
Status |
F |
Date |
2020-11-12 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2020-11-12 |
Time |
16:44 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2020-11-12 |
Time |
16:44 |
Sent To |
|
|
Notes |
2020-11-12 16:53:03 | SEE BUILDING COMMENTS. | | MAP 12099C 0579F 10/5/2017 | | FLOOD ZONE AE | | BFE = 12.7' (NAVD88) | | DFE = 12.7' + 2' (NAVD88) | | 26* 41' 40.52"N | | 80* 04' 27.06"W |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
2 |
Status |
P |
Date |
2020-12-03 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2020-12-03 |
Time |
08:49 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2020-12-03 |
Time |
08:49 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
F |
Date |
2020-11-12 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2020-11-12 |
Time |
15:39 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2020-11-12 |
Time |
15:39 |
Sent To |
|
|
Notes |
2020-11-12 15:46:33 | NO SIGNATURE OR SEAL FROM THE SURVEYOR ON THE FORM | | BOARD AND TIE IN SURVEYS. | | THE ELECTRONICALLY SUBMITTED ELEVATION CERTIFICATE IS | | NOT DIGITALLY SIGNED. |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |