Plan Review Details - Permit 20110337
Plan Review Stops For Permit 20110337
Review Stop G GAS REVIEW
Rev No 2 Status P Date 2020-11-13 Cont ID  
Sent By ccole Date 2020-11-13 Time 08:50 Rev Time 0.00
Received By ccole Date 2020-11-13 Time 08:50 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2020-11-10 Cont ID  
Sent By ccole Date 2020-11-10 Time 11:51 Rev Time 0.00
Received By ccole Date 2020-11-10 Time 11:30 Sent To  
Notes
2020-11-10 11:51:561ST REVIEW FBC-2017 RES. FUEL GAS
 PERMIT- 20110337
 11/10/2020
  
 CODES IN EFFECT:
 FBC RES- FLORIDA RESIDENTIAL BUILDING CODE SIXTH
 EDITION 2017
 FBC P- FLORIDA PLUMBING CODE SIXTH EDITION 2017
 FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017
 FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017
 FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION
 2017
 FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017
 FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH
 EDITION 2017
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) REVISE THE GAS RISER DRAWING TO SHOW THE COMPLETE
 PIPING SYSTEM INCLUDING THE PIPING FOR THE FUTURE AND
 EXISTING APPLIANCES AND EQUIPMENT- SECTIONS G2412.3 &
 G2412.4 FBC RES.FG.
  
 A) SHOW THE TOTAL LOAD AND THE INDIVIDUAL LOADS OF THE
 MODIFIED SYSTEM- SECTIONS G2412.3, G2412.4, & G2413.2
 FBC RES.FG.
  
 B) SHOW THE TOTAL LENGTH DEVELOPED LENGTH OF THE PIPING
 FROM THE METER TO THE MOST REMOTE OUTLET, AND THE
 INDIVIDUAL BRANCH LENGTHS, INCLUDING ALL CUT LENGTHS OF
 PIPING- SECTIONS G2413.4.1 AND G2413.4.2 FBC RES.FG.
  
 C) INDICATE THE PIPING TO THE FUTURE GENERATOR AND
 BARBECUES WILL BE CAPPED GAS TIGHT- SECTION G2415.15
 FBC RES.FG.
  
 3) THE CONTRACTOR OR QUALIFIER WHO PREPARED THE DRAWING
 SHALL PROVIDE HIS/HER SIGNATURE ON IT- SECTION 107.2.1
 WPB, AND FLORIDA STATUTES 471.003(2)(H) & 471.025.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM.
  
 CHRISTOPHER L. COLE
 MECHANICAL/PLUMBING PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date   Cont ID  
Sent By   Date 2020-11-13 Time   Rev Time 0.00
Received By lmarchan Date 2020-11-12 Time 14:04 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date   Cont ID  
Sent By   Date 2020-11-10 Time   Rev Time 0.00
Received By lmarchan Date 2020-11-06 Time 15:43 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status N Date 2020-11-13 Cont ID  
Sent By ccole Date 2020-11-13 Time 08:50 Rev Time 0.00
Received By ccole Date 2020-11-13 Time 08:50 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status N Date 2020-11-10 Cont ID  
Sent By ccole Date 2020-11-10 Time 11:53 Rev Time 0.00
Received By ccole Date 2020-11-10 Time 11:30 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2020-11-13 Cont ID  
Sent By ccole Date 2020-11-13 Time 08:51 Rev Time 0.00
Received By ccole Date 2020-11-13 Time 08:51 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2020-11-10 Cont ID  
Sent By ccole Date 2020-11-10 Time 11:53 Rev Time 0.00
Received By ccole Date 2020-11-10 Time 11:30 Sent To  
Notes
2020-11-10 11:55:57SIGNATURE REVIEW
 11/10/2020
  
 1) THE CONTRACTOR OR QUALIFIER WHO PREPARED THE DRAWING
 SHALL PROVIDE HIS/HER SIGNATURE ON IT- SECTION 107.2.1
 WPB, AND FLORIDA STATUTES 471.003(2)(H) & 471.025.
  
 CHRISTOPHER L. COLE
 MECHANICAL/PLUMBING PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved