Plan Review Stops For Permit 20101413 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
P |
Date |
2021-05-26 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2021-05-26 |
Time |
08:58 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2021-05-26 |
Time |
08:58 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
F |
Date |
2021-02-05 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2021-02-05 |
Time |
10:12 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2021-02-05 |
Time |
09:36 |
Sent To |
|
|
Notes |
2021-02-05 10:09:08 | SFR ADDITION | | REVIEWED BY ROGER MCPHERSON | | 561-805-6716 | | [email protected]. | | CODE USED FOR REVIEW - 2017 FBC WITH WPB CHAPTER 1 | | AMENDMENTS | | | | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 | | 1) FOR AIR-PERMEABLE RAFTER SPACE INSULATION - PLEASE | | SHOW THE RIGID BOARD OR SHEET INSULATION ON TOP OF THE | | ROOF SHEATHING TO COMPLY WITH FBC R806.5 UNVENTED ATTIC | | AND UNVENTED ENCLOSED RAFTER ASSEMBLIES. UNVENTED | | ATTICS AND UNVENTED ENCLOSED ROOF FRAMING ASSEMBLIES | | CREATED BY CEILINGS THAT ARE APPLIED DIRECTLY TO THE | | UNDERSIDE OF THE ROOF FRAMING MEMBERS AND STRUCTURAL | | ROOF SHEATHING APPLIED DIRECTLY TO THE TOP OF THE ROOF | | FRAMING MEMBERS/RAFTERS, SHALL BE PERMITTED WHERE ALL | | THE FOLLOWING CONDITIONS ARE MET: | | | | 5.INSULATION SHALL BE LOCATED IN ACCORDANCE WITH THE | | FOLLOWING: | | | | 5.1.ITEM 5.1.1, 5.1.2, 5.1.3 OR 5.1.4 SHALL BE MET, | | DEPENDING ON THE AIR PERMEABILITY OF THE INSULATION | | DIRECTLY UNDER THE STRUCTURAL ROOF SHEATHING. | | | | 5.1.1.WHERE ONLY AIR-IMPERMEABLE INSULATION IS | | PROVIDED, IT SHALL BE APPLIED IN DIRECT CONTACT WITH | | THE UNDERSIDE OF THE STRUCTURAL ROOF SHEATHING. | | | | 5.1.2.WHERE AIR-PERMEABLE INSULATION IS PROVIDED INSIDE | | THE BUILDING THERMAL ENVELOPE, IT SHALL BE INSTALLED IN | | ACCORDANCE WITH SECTION 5.1.1. IN ADDITION TO THE | | AIR-PERMEABLE INSULATION INSTALLED DIRECTLY BELOW THE | | STRUCTURAL SHEATHING, RIGID BOARD OR SHEET INSULATION | | SHALL BE INSTALLED DIRECTLY ABOVE THE STRUCTURAL ROOF | | SHEATHING IN ACCORDANCE WITH THE R-VALUES IN TABLE | | R806.5 FOR CONDENSATION CONTROL. | | | | | | 2) PLEASE PROVIDE A COMPLETE MIAMI DADE OR FLORIDA | | STATE PRODUCT APPROVAL FOR THE ROOFING TILE - PLEASE | | CIRCLE THE TILE ATTACHMENT TO BE USED IN THE PRODUCT | | APPROVAL - IF USING ADHESIVE PLEASE PROVIDE THE PRODUCT | | APPROVAL FOR THE ADHESIVE. | | | | 3) THE POOL CABANA WILL NEED A SEPARATE PERMIT - WHICH | | WILL ALLOW FOR SEPARATE BUILDING INSPECTIONS FOR EACH | | BUILDING. | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2020-11-16 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2020-11-16 |
Time |
11:25 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2020-11-16 |
Time |
10:06 |
Sent To |
|
|
Notes |
2020-11-16 11:25:45 | SFR ADDITION | | REVIEWED BY ROGER MCPHERSON | | 561-805-6716 | | [email protected]. | | CODE USED FOR REVIEW - 2017 FBC WITH WPB CHAPTER 1 | | AMENDMENTS | | | | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 | | 1) PLEASE SHOW THE SMOKE DETECTOR LOCATIONS PER FBC | | R314.2.2 ALTERATIONS, REPAIRS AND ADDITIONS. | | WHERE ALTERATIONS, REPAIRS OR ADDITIONS REQUIRING A | | PERMIT OCCUR, OR WHERE ONE OR MORE SLEEPING ROOMS ARE | | ADDED OR CREATED IN EXISTING DWELLINGS, THE INDIVIDUAL | | DWELLING UNIT SHALL BE EQUIPPED WITH SMOKE ALARMS | | LOCATED AS REQUIRED FOR NEW DWELLINGS. | | 2) PLEASE SHOW THE VENTILATION FOR THE RAFTER SPACES | | PER FBC R806.1 VENTILATION REQUIRED. | | ENCLOSED ATTICS AND ENCLOSED RAFTER SPACES FORMED WHERE | | CEILINGS ARE APPLIED DIRECTLY TO THE UNDERSIDE OF ROOF | | RAFTERS SHALL HAVE CROSS VENTILATION FOR EACH SEPARATE | | SPACE BY VENTILATING OPENINGS PROTECTED AGAINST THE | | ENTRANCE OF RAIN OR SNOW. | | 3) PLEASE SHOW THE ROOF SLOPE AT THE TILE ROOF AREA FBC | | R905.3.2 | | 4) PLEASE PROVIDE A COMPLETE MIAMI DADE OR FLORIDA | | STATE PRODUCT APPROVAL FOR THE ROOFING TILE - PLEASE | | CIRCLE THE TILE ATTACHMENT TO BE USED IN THE PRODUCT | | APPROVAL - IF USING ADHESIVE PLEASE PROVIDE THE PRODUCT | | APPROVAL FOR THE ADHESIVE. | | |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
P |
Date |
2021-01-29 |
|
|
Cont ID |
|
Sent By |
equinone |
Date |
2021-01-29 |
Time |
12:54 |
Rev Time |
0.00 |
Received By |
equinone |
Date |
2021-01-29 |
Time |
12:46 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2020-11-13 |
|
|
Cont ID |
|
Sent By |
equinone |
Date |
2020-11-13 |
Time |
12:04 |
Rev Time |
0.00 |
Received By |
equinone |
Date |
2020-11-13 |
Time |
12:04 |
Sent To |
|
|
Notes |
|
|
Review Stop |
G |
GAS REVIEW |
Rev No |
1 |
Status |
N |
Date |
2020-11-03 |
|
|
Cont ID |
|
Sent By |
lcrespo |
Date |
2020-11-03 |
Time |
18:00 |
Rev Time |
0.00 |
Received By |
lcrespo |
Date |
2020-11-03 |
Time |
18:00 |
Sent To |
|
|
Notes |
2020-11-03 18:01:27 | GAS PLAN REVIEW, A GAS PLAN HAS NOT BEEN INCLUDED IN | | THIS SUBMITTAL PACKAGE. A GAS PLAN REVIEW HAS NOT BEEN | | PERFORMED AT THIS TIME. A SEPARATE GAS PERMIT AND PLANS | | WILL BE REQUIRED FOR A CONTRACTOR TO PERFORM THE | | RELATED WORK. PROVIDE COMPLETE PLANS AND GAS RISER THAT | | REFLECTS THE ENTIRE SCOPE OF GAS WORK TO BE DONE PER | | THE WPB AMENDMENTS TO FBC SEC. 107.2.1. | | | | A SUB GAS PERMIT IS REQUIRED BY A LICENSED CONTRACTOR | | FOR THE SCOPE OF WORK PER THE WPB AMENDMENTS TO THE FBC | | SEC. 105.1. | | |
|
|
Review Stop |
HIST |
HISTORICAL |
Rev No |
1 |
Status |
P |
Date |
2020-11-23 |
|
|
Cont ID |
|
Sent By |
fmittner |
Date |
2020-11-23 |
Time |
12:15 |
Rev Time |
0.00 |
Received By |
fmittner |
Date |
2020-11-23 |
Time |
12:15 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2021-02-05 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2021-02-05 |
Time |
10:13 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2021-01-22 |
Time |
16:33 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2020-12-02 |
|
|
Cont ID |
|
Sent By |
lmarchan |
Date |
2020-12-02 |
Time |
10:53 |
Rev Time |
0.00 |
Received By |
lmarchan |
Date |
2020-10-30 |
Time |
10:25 |
Sent To |
|
|
Notes |
|
|
Review Stop |
IMPACT |
COUNTY IMPACT FEES |
Rev No |
2 |
Status |
P |
Date |
2021-08-13 |
|
|
Cont ID |
|
Sent By |
ccarvaja |
Date |
2021-08-13 |
Time |
14:39 |
Rev Time |
0.00 |
Received By |
ccarvaja |
Date |
2021-05-05 |
Time |
15:27 |
Sent To |
|
|
Notes |
2021-05-05 15:27:43 | 5/5/21 EMAILED IMPACT OFFICE FOR REVIEW. LEM |
|
|
Review Stop |
IMPACT |
COUNTY IMPACT FEES |
Rev No |
1 |
Status |
F |
Date |
2020-11-16 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2020-11-16 |
Time |
11:26 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2020-11-16 |
Time |
11:26 |
Sent To |
|
|
Notes |
2020-11-16 11:26:43 | PLANS WILL BE REVIEWED BY THE PBC IMPACT FEE OFFICE | | DIGITALLY VIA PROJECTDOX UPON NOTIFICATION BY THIS | | OFFICE. NOTIFICATION MAY OCCUR WHEN PLANS ARE NEAREST | | FINAL FORM. YOU MAY COORDINATE WITH THE IMPACT FEE | | OFFICE AT (561) 233-5025 OR SIMPLY UPLOAD THE MUNICIPAL | | IMPACT FEE QUESTIONNAIRE FORM TO YOUR PROJECT AND NAME | | THE FILE MUNICIPAL IMPACT FEE QUESTIONNAIRE. THE FORM | | CAN BE FOUND AT: HTTP://DISCOVER.PBCGOV.ORG/PZB/ADMINIS | | TRATION/PDF/IMPACTFEES/FORMS/QUESTIONNAIRE.PDF | | | | UPON APPROVAL AND FEE PAYMENT, PLEASE UPLOAD THE | | RECEIPT TO YOUR PROJECT OR EMAIL IT TO | | [email protected] . | | |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
2 |
Status |
N |
Date |
2021-01-25 |
|
|
Cont ID |
|
Sent By |
medwards |
Date |
2021-01-25 |
Time |
17:14 |
Rev Time |
0.00 |
Received By |
medwards |
Date |
2021-01-25 |
Time |
17:04 |
Sent To |
|
|
Notes |
2021-01-25 17:15:14 | APPROVED 1ST CYCLE NO CHANGES THIS CYCLE. ME |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
1 |
Status |
P |
Date |
2020-11-04 |
|
|
Cont ID |
|
Sent By |
medwards |
Date |
2020-11-04 |
Time |
13:56 |
Rev Time |
0.00 |
Received By |
medwards |
Date |
2020-11-04 |
Time |
13:41 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
P |
Date |
2021-01-26 |
|
|
Cont ID |
|
Sent By |
lcrespo |
Date |
2021-01-26 |
Time |
17:22 |
Rev Time |
0.00 |
Received By |
lcrespo |
Date |
2021-01-26 |
Time |
17:22 |
Sent To |
|
|
Notes |
2021-01-26 17:22:43 | 01/26/21 REVIEWED FOR CODE COMPLIANCE (PLUMBING) | | | | BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE | | COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN | | PROFESSIONAL, CONTRACTORS, OR THEIR REPRESENTATIVES | | FROM THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, | | STATE, AND NATIONAL CODES AND STANDARDS IN EFFECT AT | | THE TIME OF PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK | | OF EVERY ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM | | REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES | | / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO | | AVOID VOIDING OF THE PERMIT. | | | | LUIS A. CRESPO | | PLUMBING PLAN EXAMINER / INSPECTOR | | EMAIL: [email protected] OFFICE: 561 805-6720 | | |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
P |
Date |
2020-11-03 |
|
|
Cont ID |
|
Sent By |
lcrespo |
Date |
2020-11-03 |
Time |
18:19 |
Rev Time |
0.00 |
Received By |
lcrespo |
Date |
2020-11-03 |
Time |
18:01 |
Sent To |
|
|
Notes |
2020-11-03 18:20:22 | 11/03/20 REVIEWED FOR CODE COMPLIANCE (PLUMBING) | | | | BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE | | COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN | | PROFESSIONAL, CONTRACTORS, OR THEIR REPRESENTATIVES | | FROM THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, | | STATE, AND NATIONAL CODES AND STANDARDS IN EFFECT AT | | THE TIME OF PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK | | OF EVERY ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM | | REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES | | / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO | | AVOID VOIDING OF THE PERMIT. | | | | LUIS A. CRESPO | | PLUMBING PLAN EXAMINER / INSPECTOR | | EMAIL: [email protected] OFFICE: 561 805-6720 | | |
|
|
Review Stop |
R |
ROOF PLAN REVIEW |
Rev No |
3 |
Status |
N |
Date |
2021-05-26 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2021-05-26 |
Time |
08:51 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2021-05-26 |
Time |
08:51 |
Sent To |
|
|
Notes |
2021-05-26 08:52:24 | ROOFING TO BE DEFERRED AT THIS TIME | | ITEMS NEEDED FOR ROOFING SYSTEM | | REVIEWED BY ROGER MCPHERSON | | 561-805-6716 | | [email protected]. | | CODE USED FOR REVIEW - 2017 FBC WITH WPB CHAPTER 1 | | AMENDMENTS | | | | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 | | 1) FOR AIR-PERMEABLE RAFTER SPACE INSULATION - PLEASE | | SHOW THE RIGID BOARD OR SHEET INSULATION ON TOP OF THE | | ROOF SHEATHING TO COMPLY WITH FBC R806.5 UNVENTED ATTIC | | AND UNVENTED ENCLOSED RAFTER ASSEMBLIES. UNVENTED | | ATTICS AND UNVENTED ENCLOSED ROOF FRAMING ASSEMBLIES | | CREATED BY CEILINGS THAT ARE APPLIED DIRECTLY TO THE | | UNDERSIDE OF THE ROOF FRAMING MEMBERS AND STRUCTURAL | | ROOF SHEATHING APPLIED DIRECTLY TO THE TOP OF THE ROOF | | FRAMING MEMBERS/RAFTERS, SHALL BE PERMITTED WHERE ALL | | THE FOLLOWING CONDITIONS ARE MET: | | | | 5.INSULATION SHALL BE LOCATED IN ACCORDANCE WITH THE | | FOLLOWING: | | | | 5.1.ITEM 5.1.1, 5.1.2, 5.1.3 OR 5.1.4 SHALL BE MET, | | DEPENDING ON THE AIR PERMEABILITY OF THE INSULATION | | DIRECTLY UNDER THE STRUCTURAL ROOF SHEATHING. | | | | 5.1.1.WHERE ONLY AIR-IMPERMEABLE INSULATION IS | | PROVIDED, IT SHALL BE APPLIED IN DIRECT CONTACT WITH | | THE UNDERSIDE OF THE STRUCTURAL ROOF SHEATHING. | | | | 5.1.2.WHERE AIR-PERMEABLE INSULATION IS PROVIDED INSIDE | | THE BUILDING THERMAL ENVELOPE, IT SHALL BE INSTALLED IN | | ACCORDANCE WITH SECTION 5.1.1. IN ADDITION TO THE | | AIR-PERMEABLE INSULATION INSTALLED DIRECTLY BELOW THE | | STRUCTURAL SHEATHING, RIGID BOARD OR SHEET INSULATION | | SHALL BE INSTALLED DIRECTLY ABOVE THE STRUCTURAL ROOF | | SHEATHING IN ACCORDANCE WITH THE R-VALUES IN TABLE | | R806.5 FOR CONDENSATION CONTROL. | | | | | | 2) PLEASE PROVIDE A COMPLETE MIAMI DADE OR FLORIDA | | STATE PRODUCT APPROVAL FOR THE ROOFING TILE - PLEASE | | CIRCLE THE TILE ATTACHMENT TO BE USED IN THE PRODUCT | | APPROVAL - IF USING ADHESIVE PLEASE PROVIDE THE PRODUCT | | APPROVAL FOR THE ADHESIVE. | | | | | | |
|
|
Review Stop |
R |
ROOF PLAN REVIEW |
Rev No |
2 |
Status |
F |
Date |
2021-02-05 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2021-02-05 |
Time |
10:09 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2021-02-05 |
Time |
10:09 |
Sent To |
|
|
Notes |
2021-02-05 10:11:34 | SEE BUILDING PLAN REVIEW |
|
|
Review Stop |
R |
ROOF PLAN REVIEW |
Rev No |
1 |
Status |
F |
Date |
2020-11-16 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2020-11-16 |
Time |
11:26 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2020-11-16 |
Time |
11:26 |
Sent To |
|
|
Notes |
2020-11-16 11:27:11 | SEE BUILDING PLAN REVIEW |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
3 |
Status |
P |
Date |
2021-08-18 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2021-08-18 |
Time |
16:08 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2021-08-18 |
Time |
16:08 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
2 |
Status |
F |
Date |
2021-01-25 |
|
|
Cont ID |
|
Sent By |
medwards |
Date |
2021-01-25 |
Time |
06:55 |
Rev Time |
0.00 |
Received By |
medwards |
Date |
2021-01-25 |
Time |
06:53 |
Sent To |
|
|
Notes |
2021-01-25 06:58:18 | ORIGINAL SIGNED AND SEALED PAPER DRAWINGS OR DIGITALLY | | SUBMITTED SIGNED AND SEALED DRAWINGS WILL NEED TO BE | | SUBMITTED FOR REVIEW. THESE COPIES APPEAR TO BE COPIES | | OF A DIGITALLY SIGNED AND SEALED DRAWINGS. AS OF DEC. | | 30 2020 WE CAN NO LONGER ACCEPT A COPY OF A DIGITAL | | SIGNATURE. | | | | PER THE WPB AMENDMENTS TO THE FBC, EACH SHEET OF PLAN | | (INCLUDING THE SUPPORTING DOCUMENTS) IS REQUIRED TO BE | | SIGNED AND SEALED BY THE PERSON RESPONSIBLE FOR THE | | DESIGN. A DIGITAL PLAN REQUIRES A DIGITAL SIGNATURE | | WITH THE PROPER THIRD PARTY VERIFICATION. PROVIDE | | CORRECTION. ALTERNATIVELY, A SIGNED/SEALED PAPER SET | | MAY BE SUPPLIED TO THE BUILDING DEPARTMENT WHEN ALL | | TRADES ARE APPROVED. WPB FBC 107.1; FS 471/481 | | | | MICHAEL EDWARDS | | MECHANICAL EXAMINER | | 401 CLEMATIS STREET | | WEST PALM BEACH FL. 33401 | | 561-805-6728 | | [email protected] | | |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
P |
Date |
2020-10-30 |
|
|
Cont ID |
|
Sent By |
equinone |
Date |
2020-10-30 |
Time |
14:46 |
Rev Time |
0.00 |
Received By |
equinone |
Date |
2020-10-30 |
Time |
14:46 |
Sent To |
|
|
Notes |
2020-10-30 14:47:14 | PAPER DRAWINGS HAVE ORIGINAL SEAL AND SIGNATURE. ROUTED | | TO STORAGE. EQ |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
P |
Date |
2020-11-23 |
|
|
Cont ID |
|
Sent By |
fmittner |
Date |
2020-11-23 |
Time |
12:15 |
Rev Time |
0.00 |
Received By |
fmittner |
Date |
2020-11-23 |
Time |
12:15 |
Sent To |
|
|
Notes |
|
|