Plan Review Details - Permit 20101379
Plan Review Stops For Permit 20101379
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2020-12-08 Cont ID  
Sent By rmcphers Date 2020-12-08 Time 13:27 Rev Time 0.00
Received By rmcphers Date 2020-12-08 Time 13:11 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2020-12-03 Cont ID  
Sent By ppetty Date 2020-12-03 Time 11:14 Rev Time 0.00
Received By ppetty Date 2020-12-03 Time 11:13 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2020-12-03 Cont ID  
Sent By lcrespo Date 2020-12-03 Time 11:06 Rev Time 0.00
Received By lcrespo Date 2020-12-03 Time 11:06 Sent To  
Notes
2020-12-03 11:10:53GAS PLAN REVIEW, A GAS PLAN HAS NOT BEEN INCLUDED IN
 THIS SUBMITTAL PACKAGE. A GAS PLAN REVIEW HAS NOT BEEN
 PERFORMED AT THIS TIME. A SEPARATE GAS PERMIT AND PLANS
 WILL BE REQUIRED FOR A CONTRACTOR TO PERFORM THE
 RELATED WORK. PROVIDE COMPLETE PLANS AND GAS RISER THAT
 REFLECTS THE ENTIRE SCOPE OF GAS WORK TO BE DONE PER
 THE WPB AMENDMENTS TO FBC SEC. 107.2.1.
  
 A SUB GAS PERMIT IS REQUIRED BY A LICENSED CONTRACTOR
 FOR THE SCOPE OF WORK PER THE WPB AMENDMENTS TO THE FBC
 SEC. 105.1.
  

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2020-12-17 Cont ID  
Sent By fmittner Date 2020-12-17 Time 13:04 Rev Time 0.00
Received By fmittner Date 2020-12-17 Time 13:04 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-12-23 Cont ID  
Sent By jleahy Date 2020-12-23 Time 11:47 Rev Time 0.00
Received By jleahy Date 2020-11-24 Time 16:45 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2020-12-03 Cont ID  
Sent By lcrespo Date 2020-12-03 Time 11:44 Rev Time 0.00
Received By lcrespo Date 2020-12-03 Time 10:57 Sent To  
Notes
2020-12-03 11:44:5012/03/20 REVIEWED FOR CODE COMPLIANCE (PLUMBING/POOL)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS, OR THEIR REPRESENTATIVES
 FROM THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL,
 STATE, AND NATIONAL CODES AND STANDARDS IN EFFECT AT
 THE TIME OF PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK
 OF EVERY ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2021-01-07 Cont ID  
Sent By jgomez Date 2021-01-07 Time 09:46 Rev Time 0.00
Received By jgomez Date 2021-01-07 Time 09:44 Sent To  
Notes
2021-01-07 09:48:04DRAWINGS AND CALCULATIONS WITH ENGINEER'S ORIGINAL
 SEAL/SIGNATURE MATCHES APPROVED ONES. JG.

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2020-12-08 Cont ID  
Sent By rmcphers Date 2020-12-08 Time 13:27 Rev Time 0.00
Received By rmcphers Date 2020-12-08 Time 13:27 Sent To  
Notes
2020-12-08 13:28:31SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE
 DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR
 ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW.
 DRAWINGS DO NOT SHOW IN "ADOBE READER" AS
 DIGITALLY/ELECTRONICALLY SIGNED. - OR - IF YOUR
 ARCHITECT OR ENGINEER DOES NOT HAVE AN ELECTRONIC OR
 DIGITAL
 SIGNATURE - YOU CAN SUBMIT THE ORIGINAL SIGNED AND
 SEALED DRAWINGS/DOCUMENTS TO THE BUILDING DIVISION AT
 CITY HALL.
  

Review Stop Z ZONING
Rev No 1 Status P Date 2020-12-17 Cont ID  
Sent By fmittner Date 2020-12-17 Time 13:04 Rev Time 0.00
Received By fmittner Date 2020-12-17 Time 13:04 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved