Plan Review Details - Permit 20101176
Plan Review Stops For Permit 20101176
Review Stop AD ADDRESSING
Rev No 1 Status P Date 2020-11-06 Cont ID  
Sent By cpuell Date 2020-11-06 Time 11:49 Rev Time 0.00
Received By cpuell Date 2020-11-06 Time 11:49 Sent To  
Notes
2020-11-06 11:50:27APPLICANT REACHED PUT TO ME 6/2/2020 NEW ADDRESS
 ESTANLISHED AS 221 A E ISAACS AVE.

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2021-01-14 Cont ID  
Sent By cthroop Date 2021-01-14 Time 16:39 Rev Time 0.00
Received By cthroop Date 2021-01-14 Time 15:21 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2020-11-06 Cont ID  
Sent By cthroop Date 2020-11-06 Time 08:24 Rev Time 0.00
Received By cthroop Date 2020-11-05 Time 16:30 Sent To  
Notes
2020-11-06 08:40:31PLAN REVIEW / BUILDING
  
 CHRISTOPHER S. THROOP, C.B.O.
 PLANS EXAMINER BUILDING - PX3169
 PLANS EXAMINER 1&2 FAMILY - SFP306
 CONSTRUCTION SERVICES DIVISION
 TEL: 561-805-6726
 FAX: 561-805-6676
 E-MAIL: [email protected]
  
 CODES IN EFFECT:
 2017 FLORIDA BUILDING CODE, 6TH EDITION W/2017 WEST
 PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE,
 CHAPTER 1 ADMINISTRATION
 NEC 2014
  
 1ST REVIEW
  
 RESULTS: DENIED
 ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT
  
 RE:
  
 1. PROVIDE A SOILS REPORT.
 GEOTECHNICAL INVESTIGATIONS
 FBC 1803.1 GENERAL. GEOTECHNICAL INVESTIGATIONS SHALL
 BE CONDUCTED IN ACCORDANCE WITH SECTION 1803.2 AND
 REPORTED IN ACCORDANCE WITH SECTION 1803.6. WHERE
 REQUIRED BY THE BUILDING OFFICIAL OR WHERE GEOTECHNICAL
 INVESTIGATIONS INVOLVE IN-SITU TESTING, LABORATORY
 TESTING OR ENGINEERING CALCULATIONS, SUCH
 INVESTIGATIONS SHALL BE CONDUCTED BY A REGISTERED
 DESIGN PROFESSIONAL.
  
 2. PROVIDE THE FINISHED FLOOR ELEVATION.
 R403.1.7.3 FOUNDATION ELEVATION.
 ON GRADED SITES, THE TOP OF ANY EXTERIOR FOUNDATION
 SHALL EXTEND ABOVE THE ELEVATION OF THE STREET GUTTER
 AT POINT OF DISCHARGE OR THE INLET OF AN APPROVED
 DRAINAGE DEVICE A MINIMUM OF 12 INCHES (305 MM) PLUS 2
 PERCENT. ALTERNATE ELEVATIONS ARE PERMITTED SUBJECT TO
 THE APPROVAL OF THE BUILDING OFFICIAL, PROVIDED IT CAN
 BE DEMONSTRATED THAT REQUIRED DRAINAGE TO THE POINT OF
 DISCHARGE AND AWAY FROM THE STRUCTURE IS PROVIDED AT
 ALL LOCATIONS ON THE SITE.
  
 FINISHED FLOOR ELEVATIONS SHALL BE PLACED ON FOUNDATION
 PLAN AND/OR FLOOR PLAN.
  
 3. PROVIDE A SITE DRAINAGE PLAN AND SURVEY.
 FBC R401.3 SITE DRAINAGE
 PROVIDE A SITE DRAINAGE PLAN SHOWING COMPLIANCE WITH
 FBC R401.3 DRAINAGE.
 SURFACE DRAINAGE SHALL BE DIVERTED TO A STORM SEWER
 CONVEYANCE OR OTHER APPROVED POINT OF COLLECTION THAT
 DOES NOT CREATE A HAZARD.
 LOTS SHALL BE GRADED TO DRAIN SURFACE WATER AWAY FROM
 FOUNDATION WALLS. THE GRADE SHALL FALL A MINIMUM OF 6
 INCHES WITHIN THE FIRST 10 FEET.
  
 NOTE-1: VALUE HAS BEEN ADJUSTED TO $219,741.00 BASED ON
 THE ICC BUILDING VALUATION TABLES.
  
 NOTE-2: PALM BEACH COUNTY IMPACT FEES REQUIRED. SEE
 COMMENTS UNDER IMPACT FEE REVIEW.
  
 WHEN RESUBMITING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT
 CORRECTED PAGES INTO SUBMITTAL AND LEAVE THE PREVIOUSLY
 REVIEWED SHEETS DETACHED.
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
  
  
  

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2021-01-15 Cont ID  
Sent By equinone Date 2021-01-15 Time 12:31 Rev Time 0.00
Received By equinone Date 2021-01-15 Time 12:31 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2020-11-12 Cont ID  
Sent By equinone Date 2020-11-12 Time 13:27 Rev Time 0.00
Received By equinone Date 2020-11-12 Time 13:27 Sent To  
Notes
2020-11-12 13:27:34CODES IN EFFECT
 CODES IN EFFECT:
 FBC = FLORIDA BUILDING CODE 2017 6TH EDITION
 WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2017
 6TH ED, CHAPTER 1.
 FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017
 6TH EDITION
 FBC EX = FLORIDA BUILDING CODE EXISTING BUILDING 2017
 6TH EDITION
 FBC RE = FLORIDA RESIDENTIAL CODE 2017 6TH EDITION
 NEC = NFPA 70 2014 EDITION, NATIONAL ELECTRICAL CODE
 FS = FLORIDA STATUTES
 FAC = FLORIDA ADMINISTRATIVE CODE
  
 REVIEW STATUS: FAILED
  
 1) OUTDOOR RECEPTACLE REQUIRED ON BACK OF STRUCTURE.
 MUST BE WEATHERPROOF AND GFCI PROTECTED. FBC RE
 E3902.3, E3901.7
 2) RECEPTACLE IN LAUNDRY AREA MUST BE GFCI PROTECTED.
 FBC RE E3902.9
 3) BEDROOM 2 AND HALLWAY AREA IN FRONT OF BEDROOMS 1
 AND 2 SEEM TO BE MISSING SOME REQUIRED GENERAL-PURPOSE
 RECEPTACLES. FBC RE E3901.2, FBC RE E3901.10
  
 END OF COMMENTS.
  
 PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN
 RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RESUBMITTAL FORM.
  
 SINCERELY,
  
 ENRIQUE QUINONEZ
 ELECTRICAL PLANS EXAMINER
 561-805-6746
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2021-01-19 Cont ID  
Sent By lmarchan Date 2021-01-19 Time 15:52 Rev Time 0.00
Received By lmarchan Date 2021-01-08 Time 19:14 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-11-16 Cont ID  
Sent By jleahy Date 2020-11-16 Time 09:07 Rev Time 0.00
Received By jleahy Date 2020-10-28 Time 16:14 Sent To  
Notes
***NONE***

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 2 Status P Date 2021-02-09 Cont ID  
Sent By ccarvaja Date 2021-02-08 Time 12:44 Rev Time 0.00
Received By ccarvaja Date 2021-01-19 Time 15:52 Sent To  
Notes
2021-02-09 12:45:4402/08/21 RECEIPT MU-2021-002912-000 - $4,458.88 - PAID.
 CC
2021-01-19 15:53:151/19/21 EMAILED IMPACT OFFICE FOR REVIEW. LEM

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 1 Status F Date 2020-11-06 Cont ID  
Sent By cthroop Date 2020-11-06 Time 08:17 Rev Time 0.00
Received By cthroop Date 2020-11-06 Time 08:17 Sent To  
Notes
2020-11-06 08:18:32IMPACT FEES - DIGITAL SUBMITTALS
  
 PLANS WILL BE REVIEWED BY THE PBC IMPACT FEE OFFICE
 DIGITALLY VIA PROJECTDOX UPON NOTIFICATION BY THIS
 OFFICE. NOTIFICATION MAY OCCUR WHEN PLANS ARE NEAREST
 FINAL FORM. YOU MAY COORDINATE WITH THE IMPACT FEE
 OFFICE AT (561) 233-5025 OR SIMPLY UPLOAD THE MUNICIPAL
 IMPACT FEE QUESTIONNAIRE FORM TO YOUR PROJECT AND NAME
 THE FILE MUNICIPAL IMPACT FEE QUESTIONNAIRE. THE FORM
 CAN BE FOUND AT: HTTP://DISCOVER.PBCGOV.ORG/PZB/ADMINIS
 TRATION/PDF/IMPACTFEES/FORMS/QUESTIONNAIRE.PDF UPON
 APPROVAL AND FEE PAYMENT, PLEASE UPLOAD THE RECEIPT TO
 YOUR PROJECT OR EMAIL IT TO [email protected]
  

Review Stop M MECHANICAL (A/C)
Rev No 3 Status P Date 2021-01-19 Cont ID  
Sent By medwards Date 2021-01-19 Time 12:58 Rev Time 0.00
Received By medwards Date 2021-01-19 Time 12:58 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status F Date 2021-01-12 Cont ID  
Sent By medwards Date 2021-01-12 Time 06:07 Rev Time 0.00
Received By medwards Date 2021-01-12 Time 06:07 Sent To  
Notes
2021-01-12 06:10:48PLEASE ADDRESS THE FIRST COMMENT OF THE ORIGINAL
 REVIEW. THE MECHANICAL EQUIPMENT SIZING CALCULATIONS DO
 NOT MATCH UP WITH SHEET M-1. THE SQUARE FOOTAGE UNDER
 A/C MUST MATCH. FBC 107.2
  
 MICHAEL EDWARDS
 MECHANICAL EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL. 33401
 561-805-6728
 [email protected]
  
  

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2020-11-02 Cont ID  
Sent By medwards Date 2020-11-02 Time 16:44 Rev Time 0.00
Received By medwards Date 2020-11-02 Time 16:04 Sent To  
Notes
2020-11-02 16:44:271ST REVIEW FBC-2017 MECHANICAL
 PERMIT-20101176
  
 CODES IN EFFECT:
  
 FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017
 FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017
 FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION
 2017
 FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017
 FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH EDITION
 2017
 FBC RES- FLORIDA RESIDENTIAL BUILDING CODE SIXTH
 EDITION 2017
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH
 EDITION 2017
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) HVAC LOAD CALCULATIONS ARE FOR 1,257 SQ. FT. BUT
 SHEET M-1 INDICATES THAT THERE IS 1,362 SQ.FT. UNDER
 A/C. PLEASE MAKE SURE THEY MATCH. FBC 107.2
  
 2) SHEET M-1: NOTE 1- PLEASE SHOW THE BATH EXHAUST FANS
 AND THE TERMINATION LOCATIONS ON THE DRAWING. FBC 107.2
  
 3) SHEET M-1: NOTE 2- PLEASE SHOW THE MICROWAVE EXHAUST
 TERMINATION LOCATION ON THE DRAWING. FBC 107.2
  
 4) SHEET M-1: NOTE 5 PLEASE SHOW THE DRYER EXHAUST
 TERMINATION LOCATION ON THE DRAWING. FBC 107.2
  
 5) PLEASE LABEL THE AIR CONDENSING UNIT LOCATION AND
 PROVIDE ANCHORAGE DETAILS. FBC RES M1307.2
  
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT
 CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE OLD
 SHEETS FROM THE PLAN SETS, BIND THEM TOGETHER
 SEPARATELY AND MARK VOID OR OLD ON THEM. PLEASE RETAIN
 THEM FOR REFERENCE WITH THE NEW SUBMITTED PLANS. THIS
 PROCESS WILL ALSO APPLY TO ANY DOCUMENTS SUCH AS
 PRODUCT APPROVALS OR CALCULATIONS BEING REPLACED OR
 UPDATED.
  
 MICHAEL EDWARDS
 MECHANICAL EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL. 33401
 561-805-6728
 [email protected]
  

Review Stop P PLUMBING
Rev No 2 Status P Date 2021-01-11 Cont ID  
Sent By lcrespo Date 2021-01-11 Time 12:48 Rev Time 0.00
Received By lcrespo Date 2021-01-11 Time 11:37 Sent To  
Notes
2021-01-11 12:49:3701/11/21 REVIEWED FOR CODE COMPLIANCE (PLUMBING)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS, OR THEIR REPRESENTATIVES
 FROM THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL,
 STATE, AND NATIONAL CODES AND STANDARDS IN EFFECT AT
 THE TIME OF PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK
 OF EVERY ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2020-10-29 Cont ID  
Sent By lcrespo Date 2020-10-29 Time 08:19 Rev Time 0.00
Received By lcrespo Date 2020-10-29 Time 08:05 Sent To  
Notes
2020-10-29 08:19:0410/29/20 1ST PLUMBING REVIEW**DENIED** WITH COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. A SUB PLUMBING PERMIT IS REQUIRED BY A LICENSED
 CONTRACTOR FOR THE SCOPE OF WORK PER THE WPB AMENDMENTS
 TO THE FBC SEC. 105.1.
  
 2. PLUMBING RISER DIAGRAM REQUIRED PER THE WPB
 AMENDMENTS TO THE FBC SEC. 107.3.5.3 (11) RESIDENTIAL
 PLUMBING.
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS
 NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
  
 HTTPS://CODES.ICCSAFE.ORG/CODES/FLORIDA
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status P Date 2020-11-06 Cont ID  
Sent By cthroop Date 2020-11-06 Time 08:18 Rev Time 0.00
Received By cthroop Date 2020-11-05 Time 16:30 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status N Date 2021-07-13 Cont ID  
Sent By medwards Date 2021-07-13 Time 07:14 Rev Time 0.00
Received By medwards Date 2021-07-13 Time 07:14 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2021-01-08 Cont ID  
Sent By medwards Date 2021-01-08 Time 13:55 Rev Time 0.00
Received By medwards Date 2021-01-08 Time 13:55 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2020-10-28 Cont ID  
Sent By equinone Date 2020-10-28 Time 15:15 Rev Time 0.00
Received By equinone Date 2020-10-28 Time 15:15 Sent To  
Notes
2020-10-28 15:16:23PAPER DRAWINGS HAVE DIGITAL SIGNATURE AND SEAL. ROUTED
 TO STORAGE. EQ

Review Stop Z ZONING
Rev No 2 Status P Date 2021-01-19 Cont ID  
Sent By rthermid Date 2021-01-19 Time   Rev Time 0.00
Received By rthermid Date 2021-01-19 Time   Sent To I
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2020-11-05 Cont ID  
Sent By rthermid Date 2020-11-05 Time   Rev Time  
Received By rthermid Date 2020-11-05 Time   Sent To I
Notes
2020-11-05 09:42:17ZONING PLAN REVIEW
 ________________________________________
  
 DATE OF REVIEW: 11/5/2020
 ________________________________________
  
 REVIEW STATUS: FAILED
 ________________________________________
  
 PLEASE PROVIDE A WRITTEN RESPONSE TO THE FOLLOWING PLAN
 REVIEW COMMENTS:
  
 1. PLEASE PROVIDE A SURVEY OF THE PROPERTY INDICATING
 THE SETBACKS OF THE PROPOSED STRUCTURE TO ALL PROPERTY
 LINES.
 ________________________________________
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
  
 IF YOU SUBMITTED A PAPER APPLICATION, AND YOU WOULD
 LIKE TO RESUBMIT ELECTRONICALY, EMAIL
 [email protected] AND REQUEST TO HAVE YOUR
 PROJECT CONVERTED TO PROJECTDOX. YOU WILL RECEIVE LOGIN
 INFORMATION AND A LINK TO UPLOAD YOUR RESUBMITTAL.
 PLEASE BE SURE TO ?COMPLETE THE UPLOAD TASK? WHEN YOU
 ARE FINISHED UPLOADING.
  
 ________________________________________
  
 QUESTIONS/COMMENTS, PLEASE CONTACT THE FOLLOWING:
  
 RAFAELA THERMIDOR, ASSOCIATE PLANNER
 CITY OF WEST PALM BEACH
 DEVELOPMENT SERVICES DEPARTMENT ? PLANNING DIVISION
 401 CLEMATIS STREET - P.O. BOX 3147
 WEST PALM BEACH, FLORIDA 33402
  
 TTY: 800.955.8771
 E: [email protected]
 W: WPB.ORG
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved