Plan Review Details - Permit 20100911
Plan Review Stops For Permit 20100911
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2020-11-12 Cont ID  
Sent By rmcdouga Date 2020-11-12 Time 14:58 Rev Time 0.00
Received By rmcdouga Date 2020-11-12 Time 14:21 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2020-10-22 Cont ID  
Sent By rmcdouga Date 2020-10-22 Time 09:04 Rev Time 0.00
Received By rmcdouga Date 2020-10-22 Time 08:19 Sent To  
Notes
2020-10-22 09:19:08PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC SIXTH EDITION (2017)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) THE REVISION TO SHEET AE407 TO REPLACE THE WALL HUNG
 LAVATORIES WITH VANITIES IN RESTROOMS 268 AND 269
 APPEARS TO CAUSE AN ISSUE. THE VANITIES APPEAR TO
 ENCROACH INTO THE REQUIRED MINIMUM 60" DIAMETER TURNING
 SPACE WITHOUT ALLOWING FOR KNEE AND TOE CLEARANCE. FBC
 ACCESSIBILITY 603
  
 2) THE REVISION TO SHEET AE404 IS TO REPLACE THE WALL
 HUNG LAVATORIES WITH VANITIES IN RESTROOMS E135 AND
 E136. SHOW THE REQUIRED CLEARANCES AT THE PLUMBING
 FIXTURES AND THE TURNING SPACE IN THE REVISED RESTROOMS
 ON SHEET AE404. FBC ACCESSIBILITY 603
  
 3) WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A
 RESPONSE LETTER ADDRESSING EACH ITEM ALONG WITH THE
 CITY RE-SUBMITTAL FORM.

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2020-10-21 Cont ID  
Sent By jleahy Date 2020-10-21 Time 09:08 Rev Time 0.00
Received By jleahy Date 2020-10-21 Time 08:52 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2020-11-03 Cont ID  
Sent By pleduc Date 2020-11-03 Time   Rev Time 0.00
Received By pleduc Date 2020-11-03 Time 15:27 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2020-10-21 Cont ID  
Sent By pleduc Date 2020-10-21 Time   Rev Time 0.00
Received By pleduc Date 2020-10-21 Time 15:27 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status P Date 2020-10-27 Cont ID  
Sent By lcrespo Date 2020-10-27 Time 11:45 Rev Time 0.00
Received By lcrespo Date 2020-10-27 Time 11:45 Sent To  
Notes
2020-10-27 11:45:4510/27/20 REVIEWED FOR CODE COMPLIANCE (GAS)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS, OR THEIR REPRESENTATIVES
 FROM THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL,
 STATE, AND NATIONAL CODES AND STANDARDS IN EFFECT AT
 THE TIME OF PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK
 OF EVERY ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-11-12 Cont ID  
Sent By rmcdouga Date 2020-11-12 Time 14:59 Rev Time 0.00
Received By rmcdouga Date 2020-11-02 Time 11:54 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-10-27 Cont ID  
Sent By medwards Date 2020-10-27 Time 16:19 Rev Time 0.00
Received By medwards Date 2020-10-20 Time 07:54 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2020-10-27 Cont ID  
Sent By medwards Date 2020-10-27 Time 16:15 Rev Time 0.00
Received By medwards Date 2020-10-27 Time 15:43 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2020-10-27 Cont ID  
Sent By lcrespo Date 2020-10-27 Time 11:45 Rev Time 0.00
Received By lcrespo Date 2020-10-27 Time 11:45 Sent To  
Notes
2020-10-27 11:46:2810/27/20 REVIEWED FOR CODE COMPLIANCE (PLUMBING)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS, OR THEIR REPRESENTATIVES
 FROM THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL,
 STATE, AND NATIONAL CODES AND STANDARDS IN EFFECT AT
 THE TIME OF PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK
 OF EVERY ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2020-11-12 Cont ID  
Sent By rmcdouga Date 2020-11-12 Time 14:59 Rev Time 0.00
Received By rmcdouga Date 2020-11-12 Time 14:21 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2020-10-22 Cont ID  
Sent By rmcdouga Date 2020-10-22 Time 09:04 Rev Time 0.00
Received By rmcdouga Date 2020-10-22 Time 09:04 Sent To  
Notes
2020-10-21 09:09:22ELECTRICAL PAGES OK FOR SIGNATURES JLEAHY


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved