Plan Review Details - Permit 20100812
Plan Review Stops For Permit 20100812
Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-11-02 Cont ID  
Sent By lcrespo Date 2020-11-02 Time 11:52 Rev Time 0.00
Received By lcrespo Date 2020-10-30 Time 00:48 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-10-20 Cont ID  
Sent By lcrespo Date 2020-10-20 Time 09:19 Rev Time 0.00
Received By lcrespo Date 2020-10-16 Time 10:21 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status P Date 2020-11-02 Cont ID  
Sent By lcrespo Date 2020-11-02 Time 11:52 Rev Time 0.00
Received By lcrespo Date 2020-11-02 Time 11:47 Sent To  
Notes
2020-11-02 11:52:4211/02/20 REVIEWED FOR CODE COMPLIANCE (PLUMBING)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS, OR THEIR REPRESENTATIVES
 FROM THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL,
 STATE, AND NATIONAL CODES AND STANDARDS IN EFFECT AT
 THE TIME OF PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK
 OF EVERY ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2020-10-20 Cont ID  
Sent By lcrespo Date 2020-10-20 Time 09:18 Rev Time 0.00
Received By lcrespo Date 2020-10-20 Time 08:52 Sent To  
Notes
2020-10-20 09:19:4010/20/20 1ST PLUMBING REVIEW**DENIED** WITH COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. PLEASE PROVIDE MANUFACTURERS INSTRUCTIONS AND
 SPECIFICATIONS OF THE SYSTEM YOU ARE USING TO LINE THE
 PIPES WITH THE STANDARD WHICH IT IS UNDER.
  
 2. A COMPACT DISC WILL BE REQUIRED AT THE FINAL
 INSPECTION OF THE PIPES BEFORE AND AFTER WORK IS DONE
 FOR REVIEW FROM THE CHIEF PLUMBING INSPECTOR. AT THAT
 TIME IF ALL IS CORRECT THE FINAL INSPECTION WILL BE
 COMPLETE.
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS
 NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2020-11-02 Cont ID  
Sent By lcrespo Date 2020-11-02 Time 11:51 Rev Time 0.00
Received By lcrespo Date 2020-11-02 Time 11:51 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status N Date 2020-10-20 Cont ID  
Sent By lcrespo Date 2020-10-20 Time 09:18 Rev Time 0.00
Received By lcrespo Date 2020-10-20 Time 09:18 Sent To  
Notes
***NONE***