Plan Review Details - Permit 20100670
Plan Review Stops For Permit 20100670
Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 2 Status P Date 2020-11-23 Cont ID  
Sent By jwitmer Date 2020-11-23 Time 16:37 Rev Time 0.00
Received By jwitmer Date   Time   Sent To  
Notes
***NONE***

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 1 Status F Date 2020-11-02 Cont ID  
Sent By jwitmer Date 2020-11-02 Time 09:22 Rev Time 0.00
Received By jwitmer Date 2020-11-02 Time 08:22 Sent To  
Notes
2020-11-02 09:22:20COMMERCIAL ASBESTOS
  
 TO THE BUILDING CONTRACTOR:
 PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE
 CONTRACTOR, ON LETTERHEAD, STATING THAT THE
 INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM
 COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH
 COUNTY WILL BE FOLLOWED, AND THAT NOTIFICATION WILL BE
 GIVEN TIMELY. ADDITIONAL INFORMATION REGARDING ASBESTOS
 REQUIREMENTS CAN BE FOUND ON THEIR WEBSITE:
  
 HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE
 S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION-
 RENOVATION.HTML
  
 THE CONTRACTOR ACKNOWLEDGEMENT CAN BE SENT VIA EMAIL TO
 [email protected]. THE INFORMATION SHOULD BE IN PDF
 FORMAT AS AN ATTACHMENT TO THE EMAIL. PLEASE INCLUDE
 THE PERMIT NUMBER AND "ASBESTOS" IN THE SUBJECT LINE.
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2020-11-02 Cont ID  
Sent By jwitmer Date 2020-11-02 Time 10:31 Rev Time 0.00
Received By jwitmer Date 2020-11-02 Time 08:22 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2020-11-16 Cont ID  
Sent By equinone Date 2020-11-16 Time 12:34 Rev Time 0.00
Received By equinone Date 2020-11-16 Time 12:27 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2020-10-27 Cont ID  
Sent By pleduc Date 2020-10-27 Time   Rev Time 0.00
Received By pleduc Date 2020-10-23 Time 14:30 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-11-24 Cont ID  
Sent By medwards Date 2020-11-24 Time 06:46 Rev Time 0.00
Received By medwards Date 2020-11-18 Time 12:08 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-11-16 Cont ID  
Sent By equinone Date 2020-11-16 Time 12:34 Rev Time 0.00
Received By equinone Date 2020-10-16 Time 07:56 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2020-11-24 Cont ID  
Sent By medwards Date 2020-11-24 Time 06:43 Rev Time 0.00
Received By medwards Date 2020-11-24 Time 06:35 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2020-11-04 Cont ID  
Sent By medwards Date 2020-11-04 Time 14:49 Rev Time 0.00
Received By medwards Date 2020-11-04 Time 13:57 Sent To  
Notes
2020-11-04 14:49:221ST REVIEW FBC-2017 MECHANICAL
 PERMIT-20100670
  
 CODES IN EFFECT:
  
 FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017
 FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017
 FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION
 2017
 FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017
 FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH EDITION
 2017
 FBC RES- FLORIDA RESIDENTIAL BUILDING CODE SIXTH
 EDITION 2017
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH
 EDITION 2017
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) PLEASE INDICATE THE SIZE OF EACH NEW DUCT SERVING
 THE NEW OFFICES. FBC 107.3.5
  
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT
 CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE OLD
 SHEETS FROM THE PLAN SETS, BIND THEM TOGETHER
 SEPARATELY AND MARK VOID OR OLD ON THEM. PLEASE RETAIN
 THEM FOR REFERENCE WITH THE NEW SUBMITTED PLANS. THIS
 PROCESS WILL ALSO APPLY TO ANY DOCUMENTS SUCH AS
 PRODUCT APPROVALS OR CALCULATIONS BEING REPLACED OR
 UPDATED.
  
 MICHAEL EDWARDS
 MECHANICAL EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL. 33401
 561-805-6728
 [email protected]
  

Review Stop P PLUMBING
Rev No 1 Status N Date 2020-10-29 Cont ID  
Sent By ccole Date 2020-10-29 Time 17:00 Rev Time 0.00
Received By ccole Date 2020-10-29 Time 16:09 Sent To  
Notes
2020-10-29 17:02:37PLUMBING PLANS NOT INCLUDED IN THE PLAN SET, NO
 PLUMBING WORK SHOWN ON THE SUBMITTED PLANS.
 A SEPARATE PERMIT IS REQUIRED FOR PLUMBING DEMOLITION
 AND ALTERATIONS.

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2020-11-24 Cont ID  
Sent By medwards Date 2020-11-24 Time 06:46 Rev Time 0.00
Received By medwards Date 2020-11-24 Time 06:46 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2020-11-16 Cont ID  
Sent By equinone Date 2020-10-20 Time 16:13 Rev Time 0.00
Received By equinone Date 2020-10-20 Time 16:13 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved