Plan Review Details - Permit 20100124
Plan Review Stops For Permit 20100124
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2020-10-20 Cont ID  
Sent By rmcdouga Date 2020-10-20 Time 16:10 Rev Time 0.00
Received By rmcdouga Date 2020-10-20 Time 16:02 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2020-10-21 Cont ID  
Sent By ppetty Date 2020-10-21 Time 11:26 Rev Time 0.00
Received By ppetty Date 2020-10-21 Time 11:02 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2020-10-05 Cont ID  
Sent By lcrespo Date 2020-10-05 Time 10:56 Rev Time 0.00
Received By lcrespo Date 2020-10-05 Time 10:55 Sent To  
Notes
2020-10-05 10:57:30GAS PLAN REVIEW, A GAS PLAN HAS NOT BEEN INCLUDED IN
 THIS SUBMITTAL PACKAGE. A GAS PLAN REVIEW HAS NOT BEEN
 PERFORMED AT THIS TIME. A SEPARATE GAS PERMIT AND PLANS
 WILL BE REQUIRED FOR A CONTRACTOR TO PERFORM THE
 RELATED WORK. PROVIDE COMPLETE PLANS AND GAS RISER THAT
 REFLECTS THE ENTIRE SCOPE OF GAS WORK TO BE DONE PER
 THE WPB AMENDMENTS TO FBC SEC. 107.2.1.
  
 A SUB GAS PERMIT IS REQUIRED BY A LICENSED CONTRACTOR
 FOR THE SCOPE OF WORK PER THE WPB AMENDMENTS TO THE FBC
 SEC. 105.1.

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-11-02 Cont ID  
Sent By jgomez Date 2020-11-02 Time 10:41 Rev Time 0.00
Received By jgomez Date 2020-10-02 Time 15:32 Sent To  
Notes
2020-11-02 10:42:25LAST REVIEW DONE ON 10/30/2020 BY ZONING. JG.

Review Stop P PLUMBING
Rev No 1 Status P Date 2020-10-05 Cont ID  
Sent By lcrespo Date 2020-10-05 Time 10:31 Rev Time 0.00
Received By lcrespo Date 2020-10-05 Time 10:31 Sent To  
Notes
2020-10-05 10:55:2210/05/20 REVIEWED FOR CODE COMPLIANCE (PLUMBING/POOL)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS, OR THEIR REPRESENTATIVES
 FROM THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL,
 STATE, AND NATIONAL CODES AND STANDARDS IN EFFECT AT
 THE TIME OF PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK
 OF EVERY ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2020-11-02 Cont ID  
Sent By jgomez Date 2020-11-02 Time 10:50 Rev Time 0.00
Received By jgomez Date 2020-11-02 Time 10:40 Sent To I
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2020-10-20 Cont ID  
Sent By rmcdouga Date 2020-10-20 Time 16:09 Rev Time 0.00
Received By rmcdouga Date 2020-10-20 Time 16:09 Sent To  
Notes
2020-10-20 16:10:27ELECTRONICALLY SUBMITTED DRAWINGS ARE REQUIRED TO HAVE
 THE ENGINEER'S DIGITAL SIGNATURE ON THEM. YOU ALSO HAVE
 THE OPTION TO SUBMIT THE SIGNED AND SEALED PAPER
 VERSION OF DRAWINGS. AFTER THE ELECTRONIC PLANS HAVE
 BEEN APPROVED, YOU CAN SUBMIT THE CORRESPONDING PAPER
 DRAWINGS AT THE BUILDING DEPARTMENT TO BE VERIFIED. THE
 ENGINEER'S ORIGINAL HANDWRITTEN SIGNATURE AND SEAL IS
 REQUIRED TO BE ON THE DRAWINGS. NO PHOTOCOPY OR OTHER
 FACSIMILES OF THE SIGNATURE ARE ACCEPTABLE. FS 471 &
 61G15

Review Stop Z ZONING
Rev No 1 Status P Date 2020-10-30 Cont ID  
Sent By rthermid Date 2020-10-30 Time   Rev Time  
Received By rthermid Date 2020-10-30 Time   Sent To I
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved