Plan Review Stops For Permit 20100104 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
4 |
Status |
P |
Date |
2021-03-03 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2021-03-03 |
Time |
15:32 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2021-03-03 |
Time |
15:32 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
F |
Date |
2021-03-03 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2021-03-03 |
Time |
08:10 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2021-03-03 |
Time |
08:10 |
Sent To |
|
|
Notes |
2021-03-03 08:24:51 | PLAN | | REVIEW COMMENTS | | | | 3RD REVIEW: FBC SIXTH EDITION (2017) | | ROBERT MCDOUGAL, CBO | | COMMERCIAL COMBINATION PLANS EXAMINER | | (561) 805-6714 | | [email protected] | | | | DENIED BY BUILDING | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | 1) NOT RESOLVED. [THE OVERALL SITE PLAN DOES NOT SHOW | | THE CHANGES MADE TO AREA 2 WHERE AN ADDITIONAL CHARGING | | STATION WAS ADDED TO COMPLY WITH ACCESSIBILITY.] THE | | RE-SUBMITTED PLANS DO NOT COMPLETELY ADDRESS THE | | ACCESSIBILITY ISSUE. THE SITE PLAN INDICATES THAT THE | | EVC STATIONS ARE LOCATED IN TWO DIFFERENT PARKING AREAS | | WHICH ARE FOR TWO DIFFERENT BUILDINGS. THE AREAS ARE | | NAMED AREA 1 AND AREA 2. | | AREA 1 HAS SIX EXISTING ACCESSIBLE PARKING SPACES AND | | THIS PARKING LOT SERVES THE DIALYSIS CENTER. THERE WILL | | BE A TOTAL OF 5 EV SPACES IN THIS AREA. THE PLAN | | INDICATES THAT AN EVC STATION WILL BE INSTALLED AT ONE | | OF THE EXISTING ACCESSIBLE SPACES. THIS IS ACCEPTABLE. | | AREA 2 HAS EIGHT EXISTING ACCESSIBLE PARKING SPACES AND | | THIS LOT SERVES THE AMBULATORY SURGICAL CENTER. THERE | | WILL BE A TOTAL OF 8 EV SPACES IN THIS AREA. THERE ARE | | NO ACCESSIBLE EVC STATIONS INDICATED ON THE PLANS FOR | | AREA 2. AT LEAST ONE OF THESE CHARGING STATIONS SHOULD | | BE ACCESSIBLE. FBC ACCESSIBILITY CHAPTERS 3, 4 AND 5 | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
F |
Date |
2021-02-11 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2021-02-11 |
Time |
07:47 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2021-02-10 |
Time |
15:33 |
Sent To |
|
|
Notes |
2021-02-11 07:53:13 | PLAN | | REVIEW COMMENTS | | | | 2ND REVIEW: FBC SIXTH EDITION (2017) | | ROBERT MCDOUGAL, CBO | | COMMERCIAL COMBINATION PLANS EXAMINER | | (561) 805-6714 | | [email protected] | | | | DENIED BY BUILDING | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | 1) THE RE-SUBMITTED PLANS DO NOT COMPLETELY ADDRESS THE | | ACCESSIBILITY ISSUE. THE SITE PLAN INDICATES THAT THE | | EVC STATIONS ARE LOCATED IN TWO DIFFERENT PARKING AREAS | | WHICH ARE FOR TWO DIFFERENT BUILDINGS. THE AREAS ARE | | NAMED AREA 1 AND AREA 2. | | AREA 1 HAS SIX EXISTING ACCESSIBLE PARKING SPACES AND | | THIS PARKING LOT SERVES THE DIALYSIS CENTER. THERE WILL | | BE A TOTAL OF 5 EV SPACES IN THIS AREA. THE PLAN | | INDICATES THAT AN EVC STATION WILL BE INSTALLED AT ONE | | OF THE EXISTING ACCESSIBLE SPACES. THIS IS ACCEPTABLE. | | AREA 2 HAS EIGHT EXISTING ACCESSIBLE PARKING SPACES AND | | THIS LOT SERVES THE AMBULATORY SURGICAL CENTER. THERE | | WILL BE A TOTAL OF 8 EV SPACES IN THIS AREA. THERE ARE | | NO ACCESSIBLE EVC STATIONS INDICATED ON THE PLANS FOR | | AREA 2. AT LEAST ONE OF THESE CHARGING STATIONS SHOULD | | BE ACCESSIBLE. FBC ACCESSIBILITY CHAPTERS 3, 4 AND 5 | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2021-01-11 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2021-01-11 |
Time |
13:15 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2021-01-11 |
Time |
11:55 |
Sent To |
|
|
Notes |
2021-01-11 13:15:01 | PLAN | | REVIEW COMMENTS | | | | 1ST REVIEW: FBC SIXTH EDITION (2017) | | ROBERT MCDOUGAL, CBO | | COMMERCIAL COMBINATION PLANS EXAMINER | | (561) 805-6714 | | [email protected] | | | | DENIED BY BUILDING | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | 1) SPECIFY INTENDED USERS OF THE CAR CHARGING STATIONS. | | FOR EXAMPLE ARE THEY FOR THE USE OF THE PATIENTS, | | EMPLOYEES, FLEET VECHILES, ETC. | | | | 2) SHOW HOW THE CAR CHARGING STATIONS AND PARKING | | COMPLY WITH FBC ACCESSIBILITY. | | | | 3) WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A | | RESPONSE LETTER ADDRESSING EACH ITEM ALONG WITH THE | | CITY RE-SUBMITTAL FORM. | 2021-01-08 17:11:11 | THIS STOP WAS ADDED TO SEE IF THEY NEED TO COMPLY WITH | | ADA REQUIREMENTS. JLEAHY |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
6 |
Status |
P |
Date |
2021-03-03 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2021-03-03 |
Time |
08:18 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2021-03-03 |
Time |
06:53 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
5 |
Status |
F |
Date |
2021-02-12 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2021-02-12 |
Time |
08:16 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2021-02-10 |
Time |
17:10 |
Sent To |
|
|
Notes |
2021-02-11 12:57:07 | ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW. | | | | FLORIDA BUILDING CODE 2017 6TH EDITION | | FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 6TH ED | | NFPA 70 2014 EDITION | | | | JAKE LEAHY BN, BU, PX | | ELECTRICAL PLANS EXAMINER II | | 561-805-6713 | | [email protected] | | | | PAGE E-1 LOAD CALCULATION FOR FEEDER TO PANEL EV NOT IN | | ACCORDANCE WITH 625.40. | | | | PAGE E-2 LOAD CALCULATION FOR FEEDER TO EAST LOT PANEL | | NOT IN ACCORDANCE WITH 625.40. | | | | PAGE AREA 1 SHOWS A FEEDER WITH 3 #1 AND A #6 AND | | ANOTHER BRANCH GOING TO THE HANDICAP SPACE WHAT FEEDS | | THE HANDICAP SPACE. WHERE IS THE HANDICAP FED FROM? | | 125A MAIN/ 200A MAIN? | | | | PAGE AREA 2 SHOWS 3/0 GOING TO THE PANEL, LOAD | | CALCULATION SHOWN FOR THESE CONDUCTORS IS NOT PER | | 625.40. 200A MAIN/300A MAIN? | | | | PLEASE PROVIDE A VOLTAGE DROP CALCULATION BASED ON | | 625.40 LOAD CALCULATION. | | | | DO YOU HAVE LOAD MANAGEMENT IF SO PLEASE EXPLAN HOW IT | | WORKS. | | | | |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
4 |
Status |
F |
Date |
2021-01-08 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2021-01-08 |
Time |
16:32 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2021-01-08 |
Time |
16:27 |
Sent To |
|
|
Notes |
2021-01-08 17:05:44 | ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW. | | | | FLORIDA BUILDING CODE 2017 6TH EDITION | | FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 6TH ED | | NFPA 70 2014 EDITION | | | | JAKE LEAHY BN, BU, PX | | ELECTRICAL PLANS EXAMINER II | | 561-805-6713 | | [email protected] | | | | 1) VALUE OF JOB DOES NOT INCLUDE THE VALUE OF THE | | CHARGERS. | | | | FBC 109.3 BUILDING PERMIT VALUATION. FOR PERMITTING | | PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS SHALL BE | | TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL, | | ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH, | | RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES, | | MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING ONLY | | LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE LATEST | | PUBLISHED DATA OF NATIONAL CONSTRUCTION COST ANALYSIS | | SERVICES (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY | | INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT | | VALUATION SHALL BE SET BY THE BUILDING OFFICIAL. | | | | 2) ALL PAGES ARE NOT SIGNED IF THEY ARE FROM AN | | ENGINEERING FIRM THEY WILL NEED TO SIGNED AND SEALED BY | | THAT FIRM. SITE PLAN NOT SIGNED, | | | | PLAN IS NOT DIGITALLY SIGNED BY THE DESIGNER OF RECORD | | | | PLAN IS REQUIRED TO BE SIGNED AND SEALED BY A DESIGN | | PROFESSIONAL OR THE ELECTRICAL CONTRACTOR QUALIFIER. FS | | 471.003(2)(H); 471.025; FBC 107.2.1 | | | | 3) PLEASE SHOW A BETTER DETAIL OF EXACTLY WHERE | | PANELS(SERVICE) AND CHARGERS ARE TO BE INSTALLED IN | | PARKING LOT. SITE PLAN IS TO VAGUE. PLAN NEEDS TO SHOW | | IF BOLLARDS OR SOME OTHER TYPE OF PROTECTION WILL BE | | REQUIRED FOR PROTECTION OF THE SERVICE, PANELS, OR | | CHARGERS AS INSTALLED. | | | | 107.2.1.4 QUALITY OF BUILDING PLANS. BUILDING PLANS | | SHALL BE DRAWN TO A MINIMUM 1/8 INCH SCALE UPON | | SUBSTANTIAL PAPER, CLOTH OR OTHER ACCEPTABLE MEDIUM. | | THIS POLICY MAY INCLUDE SUCH THINGS AS MINIMUM SIZE, | | SHAPE, CONTRAST, CLARITY, OR OTHER ITEMS RELATED TO | | RECORDS MANAGEMENT. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
3 |
Status |
F |
Date |
2020-11-20 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2020-11-20 |
Time |
15:33 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2020-11-20 |
Time |
15:28 |
Sent To |
|
|
Notes |
2020-11-20 15:37:38 | ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW. | | | | FLORIDA BUILDING CODE 2017 6TH EDITION | | FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 6TH ED | | NFPA 70 2014 EDITION | | | | JAKE LEAHY BN, BU, PX | | ELECTRICAL PLANS EXAMINER II | | 561-805-6713 | | [email protected] | | | | APPLICATION STILL STATES 3 CHARGERS. IS IT 3 OR 12? | | | | SUBMIT A SIGNED CONTRACT FOR THE WORK INVOLVED | | (MATERIALS, LABOR ECT) THIS INCLUDES THE CHARGERS. | | FBC 109.3 BUILDING PERMIT VALUATION. FOR PERMITTING | | PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS SHALL BE | | TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL, | | ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH, | | RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES, | | MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING ONLY | | LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE LATEST | | PUBLISHED DATA OF NATIONAL CONSTRUCTION COST ANALYSIS | | SERVICES (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY | | INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT | | VALUATION SHALL BE SET BY THE BUILDING OFFICIAL | | | | SHOW ON SITE PLAN WHERE POWER IS COMING FROM IN AREA 1 | | AND 2 AND THE LOCATIONS OF THE SERVICES FOR THE | | CHARGERS. 215.5 |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
F |
Date |
2020-11-02 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2020-11-02 |
Time |
17:40 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2020-11-02 |
Time |
13:52 |
Sent To |
|
|
Notes |
2020-11-02 17:43:05 | ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW. | | | | FLORIDA BUILDING CODE 2017 6TH EDITION | | FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 6TH ED | | NFPA 70 2014 EDITION | | | | JAKE LEAHY BN, BU, PX | | ELECTRICAL PLANS EXAMINER II | | 561-805-6713 | | [email protected] | | | | 1) PAPER WORK SHOWS 6 CHARGERS ELECTRICAL PLAN SHOWS 4. | | | | 2) NEED A SITE PLAN TO SHOW WHERE CHARGERS ARTE GOING | | TO BE INSTALLED. | | | | 3) SENT TO ZONING FOR REVIEW. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
F |
Date |
2020-10-19 |
|
|
Cont ID |
|
Sent By |
fgiaquin |
Date |
2020-10-19 |
Time |
22:00 |
Rev Time |
0.00 |
Received By |
fgiaquin |
Date |
2020-10-19 |
Time |
21:31 |
Sent To |
|
|
Notes |
2020-10-19 22:00:15 | ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW. | | | | 1. PROVIDE ELECTRICAL PLAN FOR REVIEW, SIGNED AND | | SEALED BY A LICENSED DESIGN PROFESSIONAL OR SIGNED BY | | THE ELECTRICAL CONTRACTOR QUALIFIER. FS 471.003(2)(H); | | 471.025; WPB FBC 107.2.1, 107.3.5 | | | | END OF COMMENTS. | | | | PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN | | RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | RESUBMITTAL FORM. ADDITIONALLY, INSERT CORRECTED PAGES | | INTO THE ORIGINAL SUBMITTAL AND REMOVE OR VOID THE | | PREVIOUSLY REVIEWED SHEETS. | | CODES IN EFFECT: | | | | HTTP://WPB.ORG/DEPARTMENTS/DEVELOPMENT-SERVICES/FORMS/B | | UILDING-PERMIT-FORMS | | | | | | FBC = FLORIDA BUILDING CODE 2017 6TH EDITION | | WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FLORIDA | | BUILDING CODE 2017 6TH ED. | | FBC EB = FLORIDA BUILDING CODE EXISTING BUILDING 2017 | | 6TH EDITION | | FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 | | 6TH EDITION | | FBC RE = FLORIDA RESIDENTIAL CODE 2017 6TH EDITION | | NEC = NFPA 70 2014 EDITION, NATIONAL ELECTRICAL CODE | | FS = FLORIDA STATUTES | | | | V/R, | | | | FRANK GIAQUINTO III | | ELECTRICAL INSPECTOR | | ELECTRICAL PLANS EXAMINER | | CITY OF WEST PALM BEACH | | [email protected] | | CELL: 561-657-1653 | | | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
7 |
Status |
N |
Date |
2021-03-04 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2021-03-04 |
Time |
09:00 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2021-03-01 |
Time |
14:38 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
6 |
Status |
N |
Date |
2021-02-12 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2021-02-12 |
Time |
08:22 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2021-02-09 |
Time |
10:06 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
5 |
Status |
N |
Date |
2021-01-11 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2021-01-11 |
Time |
13:15 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2020-12-29 |
Time |
15:10 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
4 |
Status |
N |
Date |
2020-12-29 |
|
|
Cont ID |
|
Sent By |
lmarchan |
Date |
2020-12-29 |
Time |
11:47 |
Rev Time |
0.00 |
Received By |
lmarchan |
Date |
2020-12-17 |
Time |
22:34 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2020-11-20 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2020-11-20 |
Time |
15:38 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2020-11-10 |
Time |
13:34 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2020-11-06 |
|
|
Cont ID |
|
Sent By |
ccarvaja |
Date |
2020-11-06 |
Time |
10:19 |
Rev Time |
0.00 |
Received By |
ccarvaja |
Date |
2020-10-23 |
Time |
15:31 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2020-10-19 |
|
|
Cont ID |
|
Sent By |
fgiaquin |
Date |
2020-10-19 |
Time |
22:00 |
Rev Time |
0.00 |
Received By |
fgiaquin |
Date |
2020-10-02 |
Time |
15:04 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
6 |
Status |
P |
Date |
2021-03-03 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2021-03-03 |
Time |
08:18 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2021-03-03 |
Time |
08:18 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
5 |
Status |
P |
Date |
2021-02-12 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2021-02-12 |
Time |
08:19 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2021-02-12 |
Time |
08:19 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
4 |
Status |
F |
Date |
2021-01-08 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2021-01-08 |
Time |
17:09 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2021-01-08 |
Time |
17:08 |
Sent To |
|
|
Notes |
2021-01-08 17:09:49 | NOT ALL PAGES ARE SIGNED THAT WERE SUBMITED. JLEAHY |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
3 |
Status |
F |
Date |
2020-11-20 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2020-11-20 |
Time |
15:37 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2020-11-20 |
Time |
15:37 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
2 |
Status |
P |
Date |
2020-11-02 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2020-11-02 |
Time |
17:43 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2020-11-02 |
Time |
13:52 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
F |
Date |
2020-10-19 |
|
|
Cont ID |
|
Sent By |
fgiaquin |
Date |
2020-10-19 |
Time |
22:00 |
Rev Time |
0.00 |
Received By |
fgiaquin |
Date |
2020-10-19 |
Time |
22:00 |
Sent To |
|
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
5 |
Status |
P |
Date |
2021-03-04 |
|
|
Cont ID |
|
Sent By |
llouie |
Date |
2021-03-04 |
Time |
|
Rev Time |
0.00 |
Received By |
llouie |
Date |
2021-03-04 |
Time |
|
Sent To |
|
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
4 |
Status |
P |
Date |
2020-12-31 |
|
|
Cont ID |
|
Sent By |
llouie |
Date |
2020-12-31 |
Time |
|
Rev Time |
0.00 |
Received By |
llouie |
Date |
2020-12-31 |
Time |
|
Sent To |
|
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
3 |
Status |
F |
Date |
2020-12-28 |
|
|
Cont ID |
|
Sent By |
llouie |
Date |
2020-12-28 |
Time |
|
Rev Time |
0.00 |
Received By |
llouie |
Date |
2020-12-28 |
Time |
|
Sent To |
|
|
Notes |
2020-12-28 18:39:58 | ** FAILED ** | | | | PLEASE ADDRESS THE FOLLOWING COMMENTS. RESPOND TO THE | | COMMENTS IN WRITING AND/OR ON THE PLANS WHERE | | APPLICABLE: | | | | 1.) SITE PLAN SHOWING EXACT LOCATION OF THE CHARGING | | STATIONS, AS DISCUSSED WITH ANJUL CHOKSHI OF FPL, HAS | | NOT INCLUDED WITH THE LATEST RESUBMITTAL FOR THE | | PERMIT. MUST BE ADDRESSED PRIOR TO ZONING SIGN-OFF. | | | | NOTES: | | | | * ANY REVISIONS MAY RESULT IN ADDITIONAL COMMENTS. | | | | * CONTACT LINDA LOUIE @ (561) 822-1458 IF THERE ARE | | QUESTIONS. | | |
|
|
Review Stop |
Z |
ZONING |
Rev No |
2 |
Status |
F |
Date |
2020-11-18 |
|
|
Cont ID |
|
Sent By |
llouie |
Date |
2020-11-18 |
Time |
|
Rev Time |
0.00 |
Received By |
llouie |
Date |
2020-11-18 |
Time |
|
Sent To |
|
|
Notes |
2020-11-18 09:39:13 | ** FAILED ** | | | | PLEASE ADDRESS THE FOLLOWING COMMENTS. RESPOND TO THE | | COMMENTS IN WRITING AND/OR ON THE PLANS WHERE | | APPLICABLE: | | | | 1.) AN UPDATED SURVEY OF THE PROPERTY IS REQUIRED. | | [11/6/2020 REPEAT COMMENT: NOT ADDRESSED.] | | | | 2.) SITE PLAN, SHOWING THE EXACT LOCATION OF THE | | PROPOSED CHARGING STATIONS IS REQUIRED. ALSO PARKING | | CALCULATIONS FOR THE ENTIRE SITE IS REQUIRED. PLEASE | | NOTE THAT CHARGING STATIONS WOULD ONLY BE PERMITTED IF | | THE PROVIDED PARKING IS IN EXCESS TO THE REQUIRED | | PARKING FOR THE USE. [11/6/2020 REPEAT COMMENT: NOT | | ADDRESSED.] | | | | 3.) INFORMATION PROVIDED IN THE PERMIT PACKET IS | | INCONSISTENT. THE SCOPE OF WORK INDICATES THAT ONLY 3 | | CHARGING STATIONS ARE PROPOSED; HOWEVER, DOCUMENTS | | PROVIDED WITH THE PERMIT PACKET INDICATE A TOTAL OF 6 | | CHARGING STATIONS ARE PROPOSED FOR THE SITE. PLEASE | | CLARIFY. [11/6/2020 REPEAT COMMENT: NOT ADDRESSED.] | | | | | | NOTES: | | | | * ANY REVISIONS MAY RESULT IN ADDITIONAL COMMENTS. | | | | * CONTACT LINDA LOUIE @ (561) 822-1458 IF THERE ARE | | QUESTIONS. | | | | * ZONE: CSPD (TENANT ST. MARY'S) | | |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
F |
Date |
2020-11-06 |
|
|
Cont ID |
|
Sent By |
llouie |
Date |
2020-11-06 |
Time |
|
Rev Time |
0.00 |
Received By |
llouie |
Date |
2020-11-06 |
Time |
|
Sent To |
|
|
Notes |
2020-11-06 08:44:15 | ** FAILED ** | | | | PLEASE ADDRESS THE FOLLOWING COMMENTS. RESPOND TO THE | | COMMENTS IN WRITING AND/OR ON THE PLANS WHERE | | APPLICABLE: | | | | 1.) AN UPDATED SURVEY OF THE PROPERTY IS REQUIRED. | | | | 2.) SITE PLAN, SHOWING THE EXACT LOCATION OF THE | | PROPOSED CHARGING STATIONS IS REQUIRED. ALSO PARKING | | CALCULATIONS FOR THE ENTIRE SITE IS REQUIRED. PLEASE | | NOTE THAT CHARGING STATIONS WOULD ONLY BE PERMITTED IF | | THE PROVIDED PARKING IS IN EXCESS TO THE REQUIRED | | PARKING FOR THE USE. | | | | 3.) INFORMATION PROVIDED IN THE PERMIT PACKET IS | | INCONSISTENT. THE SCOPE OF WORK INDICATES THAT ONLY 3 | | CHARGING STATIONS ARE PROPOSED; HOWEVER, DOCUMENTS | | PROVIDED WITH THE PERMIT PACKET INDICATE A TOTAL OF 6 | | CHARGING STATIONS ARE PROPOSED FOR THE SITE. PLEASE | | CLARIFY. | | | | | | NOTES: | | | | * ANY REVISIONS MAY RESULT IN ADDITIONAL COMMENTS. | | | | * CONTACT LINDA LOUIE @ (561) 822-1458 IF THERE ARE | | QUESTIONS. | | | | * ZONE: CSPD (TENANT ST. MARY?S) | | | 2020-11-02 17:44:52 | CUSTOMER IS INSTALLING 4 TO 6 CHARGERS (ELECTRIC | | VEHICLES) SOMEWHERE IN THE PARKING LOT? |
|
|