Plan Review Stops For Permit 20100012 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
P |
Date |
2020-11-19 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2020-11-19 |
Time |
14:32 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2020-11-19 |
Time |
14:32 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2020-10-27 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2020-10-27 |
Time |
15:46 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2020-10-27 |
Time |
15:32 |
Sent To |
|
|
Notes |
2020-10-27 15:46:45 | GENERATOR | | REVIEWED BY ROGER MCPHERSON | | 561-805-6716 | | [email protected]. | | CODE USED FOR REVIEW - 2017 FBC WITH WPB CHAPTER 1 | | AMENDMENTS | | | | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 | | 1) PLEASE PROVIDE STRUCTURAL CALCULATIONS FOR THE SITE | | SPECIFIC WIND DESIGN PRESSURES OR PROVIDE SIGNED AND | | SEALED SITE SPECIFIC WIND DESIGN PRESSURES FROM AN | | ARCHITECT OR ENGINEER. (WIND DESIGN TO BE BASED ON | | 150MPH, EXPOSURE"C") (SEE NOTE NUMBER 2 ON THE ENGINEER | | SLAB DRAWING). | | |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
P |
Date |
2020-11-12 |
|
|
Cont ID |
|
Sent By |
fgiaquin |
Date |
2020-11-12 |
Time |
21:22 |
Rev Time |
0.00 |
Received By |
fgiaquin |
Date |
2020-11-12 |
Time |
20:19 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
F |
Date |
2020-10-29 |
|
|
Cont ID |
|
Sent By |
fgiaquin |
Date |
2020-10-29 |
Time |
21:18 |
Rev Time |
0.00 |
Received By |
fgiaquin |
Date |
2020-10-29 |
Time |
19:43 |
Sent To |
|
|
Notes |
2020-10-29 21:18:22 | ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW. | | | | 1. VALUE LOW FOR AMOUNT OF WORK SHOWN, RAISE VALUE OR | | VALUE WILL BE SET BY BUILDING OFFICAL. FBC 109.3 | | | | END OF COMMENTS. | | | | PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN | | RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | RESUBMITTAL FORM. ADDITIONALLY, INSERT CORRECTED PAGES | | INTO THE ORIGINAL SUBMITTAL AND REMOVE OR VOID THE | | PREVIOUSLY REVIEWED SHEETS. | | CODES IN EFFECT: | | | | IF THE RESUBMITTAL IS NOT PREPARED BY A DESIGN | | PROFESSIONAL (ARCHITECT OR ENGINEER), AND THE PAGES ARE | | 11X17 OR SMALLER, YOU MAY RESUBMIT, ALONG WITH A | | COMPLETED RESUBMITTAL FORM, VIA EMAIL TO | | [email protected]. THE EMAIL SHOULD INCLUDE THE PERMIT | | NUMBER AND "RESUBMITTAL" IN THE SUBJECT LINE. THE | | RESUBMITTAL FORM CAN BE FOUND AT THIS WEBSITE: | | | | HTTP://WPB.ORG/DEPARTMENTS/DEVELOPMENT-SERVICES/FORMS/B | | UILDING-PERMIT-FORMS | | | | | | FBC = FLORIDA BUILDING CODE 2017 6TH EDITION | | WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FLORIDA | | BUILDING CODE 2017 6TH ED. | | FBC EB = FLORIDA BUILDING CODE EXISTING BUILDING 2017 | | 6TH EDITION | | FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 | | 6TH EDITION | | FBC RE = FLORIDA RESIDENTIAL CODE 2017 6TH EDITION | | NEC = NFPA 70 2014 EDITION, NATIONAL ELECTRICAL CODE | | FS = FLORIDA STATUTES | | | | V/R, | | | | FRANK GIAQUINTO III | | ELECTRICAL INSPECTOR | | ELECTRICAL PLANS EXAMINER | | CITY OF WEST PALM BEACH | | [email protected] | | CELL: 561-657-1653 | | |
|
|
Review Stop |
G |
GAS REVIEW |
Rev No |
4 |
Status |
P |
Date |
2020-12-02 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2020-12-02 |
Time |
11:18 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2020-12-02 |
Time |
10:34 |
Sent To |
|
|
Notes |
|
|
Review Stop |
G |
GAS REVIEW |
Rev No |
3 |
Status |
F |
Date |
2020-12-01 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2020-12-01 |
Time |
14:30 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2020-12-01 |
Time |
14:30 |
Sent To |
|
|
Notes |
2020-12-01 14:31:02 | 3RD REVIEW FBC-2017 RES. FUEL GAS | | PERMIT- 20100012 | | 12/1/2020 | | | | CODES IN EFFECT: | | FBC RES- FLORIDA RESIDENTIAL BUILDING CODE SIXTH | | EDITION 2017 | | FBC P- FLORIDA PLUMBING CODE SIXTH EDITION 2017 | | FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017 | | FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017 | | FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION | | 2017 | | FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017 | | FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH | | FS- FLORIDA STATUTES | | FAC- FLORIDA ADMINISTRATIVE CODE | | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH | | EDITION 2017 | | | | PLAN REVIEW RESULTS: DENIED. | | FAILED COMMENTS FROM THE 1ST AND 2ND REVIEW ARE LISTED | | BELOW WITH ADDITIONAL NOTES. | | | | 3) FAILED. SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE | | 500-GALLON UG LP TANK SHOWING THE TANK AND DOME HAVE | | BEEN DESIGNED, FABRICATED, TESTED AND MARKED (STAMPED) | | IN ACCORDANCE WITH THE REGULATIONS AS REQUIRED BY THE | | REGULATORY AGENCIES AND COMPLIANCE STANDARDS LISTED IN | | SECTION 5.2.1.1 NFPA 58. TANK SPECS NOT SUBMITTED. | | PLEASE PROVIDE THE TANK SPEC SHEET. | | | | 4A) FAILED. PROVIDE LP TANK INSTALLATION DETAILS AS | | REQUIRED BY NFPA 58- ENGINEERING FOR ANCHORING THE TANK | | TO PREVENT FLOTATION, COLLAPSE, OR LATERAL MOVEMENT- | | SECTION 6.6.1.6. PLEASE INCLUDE A FRONT AND SIDE | | ELEVATION VIEW THAT SHOWS THE BURIAL DEPTH, ANCHORING | | BASE MATERIAL, AND THE TYPES, SIZES, AND NUMBERS OF | | ANCHORS, CABLES OR STRAPS, AND THE TYPE OF PROTECTIVE | | SLEEVES FOR THE CABLES OR STRAPS. PLEASE PROVIDE | | ENGINEERING FOR INSTALLATION OF THE LP TANK. | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | RE-SUBMITTAL FORM. | | | | CHRISTOPHER L. COLE | | MECHANICAL/PLUMBING PLANS EXAMINER | | 401 CLEMATIS STREET | | WEST PALM BEACH FL 33401 | | 561-805-6719 | | [email protected] | | |
|
|
Review Stop |
G |
GAS REVIEW |
Rev No |
2 |
Status |
F |
Date |
2020-11-18 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2020-11-18 |
Time |
12:37 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2020-11-18 |
Time |
11:57 |
Sent To |
|
|
Notes |
2020-11-18 12:37:45 | 2ND REVIEW FBC-2017 RES. FUEL GAS | | PERMIT- 20100012 | | 11/18/2020 | | | | CODES IN EFFECT: | | FBC RES- FLORIDA RESIDENTIAL BUILDING CODE SIXTH | | EDITION 2017 | | FBC P- FLORIDA PLUMBING CODE SIXTH EDITION 2017 | | FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017 | | FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017 | | FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION | | 2017 | | FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017 | | FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH | | FS- FLORIDA STATUTES | | FAC- FLORIDA ADMINISTRATIVE CODE | | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH | | EDITION 2017 | | | | PLAN REVIEW RESULTS: DENIED. | | FAILED COMMENTS FROM THE 1ST REVIEW ARE LISTED BELOW | | WITH ADDITIONAL NOTES. | | | | 1) FAILED. SURVEY: INDICATE THE REQUIRED 10 FT. | | CLEARANCE DISTANCE FOR THE UG TANK TO THE DRIVEWAY- | | SECTION 6.6.6.1(B) & (C) NFPA 58-14. TANKS INSTALLED | | WITH 10 FT. SHALL BE INSTALLED 18 IN. BELOW GRADE OR | | VEHICLE PROTECTION SHALL BE PROVIDED. THE CLEARANCE | | DISTANCE FROM THE UG TANK TO THE DRIVEWAY NOT SHOWN. | | INSTALLATION DETAILS FOR DOME AND COVER NOT PROVIDED. | | | | 3) FAILED. SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE | | 500-GALLON UG LP TANK SHOWING THE TANK AND DOME HAVE | | BEEN DESIGNED, FABRICATED, TESTED AND MARKED (STAMPED) | | IN ACCORDANCE WITH THE REGULATIONS AS REQUIRED BY THE | | REGULATORY AGENCIES AND COMPLIANCE STANDARDS LISTED IN | | SECTION 5.2.1.1 NFPA 58. TANK SPECS NOT SUBMITTED. | | | | 4) FAILED. PROVIDE LP TANK INSTALLATION DETAILS AS | | REQUIRED BY NFPA 58: | | | | A) FAILED. ENGINEERING FOR ANCHORING THE TANK TO | | PREVENT FLOTATION, COLLAPSE, OR LATERAL MOVEMENT- | | SECTION 6.6.1.6. PLEASE INCLUDE A FRONT AND SIDE | | ELEVATION VIEW THAT SHOWS THE BURIAL DEPTH, ANCHORING | | BASE MATERIAL, AND THE TYPES, SIZES, AND NUMBERS OF | | ANCHORS, CABLES OR STRAPS, AND THE TYPE OF PROTECTIVE | | SLEEVES FOR THE CABLES OR STRAPS. PLEASE PROVIDE A | | COMPLETE DETAIL THAT INCLUDES THE ATTACHMENT OF THE | | DOME AND COVER. | | | | B) FAILED. SHOW HOW THE TANK WILL BE PROTECTED AGAINST | | CORROSION BY INSTALLATION OF A CATHODIC PROTECTION | | SYSTEM CONSISTING OF A SACRIFICIAL ANODE OR AN | | IMPRESSED CURRENT ANODE PER SECTIONS 5.2.1.11 & 6.6.6.1 | | (1) NFPA 58. INDICATE THE TYPE OF PROTECTION AND HOW IT | | WILL BE TESTED- SECTION 6.17.1. DETAIL FOR ANODE BAG | | INSTALLATION NOT PROVIDED. | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | RE-SUBMITTAL FORM. | | | | CHRISTOPHER L. COLE | | MECHANICAL/PLUMBING PLANS EXAMINER | | 401 CLEMATIS STREET | | WEST PALM BEACH FL 33401 | | 561-805-6719 | | [email protected] | | |
|
|
Review Stop |
G |
GAS REVIEW |
Rev No |
1 |
Status |
F |
Date |
2020-10-26 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2020-10-26 |
Time |
14:06 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2020-10-26 |
Time |
12:39 |
Sent To |
|
|
Notes |
2020-10-26 14:06:41 | 1ST REVIEW FBC-2017 RES. FUEL GAS | | PERMIT- 20100012 | | 10/26/2020 | | | | CODES IN EFFECT: | | FBC RES- FLORIDA RESIDENTIAL BUILDING CODE SIXTH | | EDITION 2017 | | FBC P- FLORIDA PLUMBING CODE SIXTH EDITION 2017 | | FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017 | | FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017 | | FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION | | 2017 | | FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017 | | FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH | | FS- FLORIDA STATUTES | | FAC- FLORIDA ADMINISTRATIVE CODE | | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH | | EDITION 2017 | | | | PLAN REVIEW RESULTS: DENIED. | | | | 1) SURVEY: INDICATE THE REQUIRED 10 FT. CLEARANCE | | DISTANCE FOR THE UG TANK TO THE DRIVEWAY- SECTION | | 6.6.6.1(B) & (C) NFPA 58-14. TANKS INSTALLED WITH 10 | | FT. SHALL BE INSTALLED 18 IN. BELOW GRADE OR VEHICLE | | PROTECTION SHALL BE PROVIDED. | | | | 2) SURVEY: CORRECT THE 5 FT. GENERATOR EXHAUST | | CLEARANCE TO OPENINGS INTO THE BUILDING. A 10 FT. | | CLEARANCE IS REQUIRED TO MECHANICAL AND GRAVITY AIR | | INTAKES INTO THE BUILDING PER SECTION R303.5.1 FBC RES. | | | | 3) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE | | 500-GALLON UG LP TANK SHOWING THE TANK AND DOME HAVE | | BEEN DESIGNED, FABRICATED, TESTED AND MARKED (STAMPED) | | IN ACCORDANCE WITH THE REGULATIONS AS REQUIRED BY THE | | REGULATORY AGENCIES AND COMPLIANCE STANDARDS LISTED IN | | SECTION 5.2.1.1 NFPA 58. | | | | 4) PROVIDE LP TANK INSTALLATION DETAILS AS REQUIRED BY | | NFPA 58: | | A) ENGINEERING FOR ANCHORING THE TANK TO PREVENT | | FLOTATION, COLLAPSE, OR LATERAL MOVEMENT- SECTION | | 6.6.1.6. PLEASE INCLUDE A FRONT AND SIDE ELEVATION VIEW | | THAT SHOWS THE BURIAL DEPTH, ANCHORING BASE MATERIAL, | | AND THE TYPES, SIZES, AND NUMBERS OF ANCHORS, CABLES OR | | STRAPS, AND THE TYPE OF PROTECTIVE SLEEVES FOR THE | | CABLES OR STRAPS. | | B) SHOW HOW THE TANK WILL BE PROTECTED AGAINST | | CORROSION BY INSTALLATION OF A CATHODIC PROTECTION | | SYSTEM CONSISTING OF A SACRIFICIAL ANODE OR AN | | IMPRESSED CURRENT ANODE PER SECTIONS 5.2.1.11 & 6.6.6.1 | | (1) NFPA 58. INDICATE THE TYPE OF PROTECTION AND HOW IT | | WILL BE TESTED- SECTION 6.17.1 | | | | 5) THE CONTRACTOR OR QUALIFIER WHO PREPARED THE DRAWING | | SHALL PROVIDE HIS/HER SIGNATURE ON IT- SECTION 107.2.1 | | WPB, AND FLORIDA STATUTES 471.003(2)(H) & 471.025. | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | RE-SUBMITTAL FORM. | | | | CHRISTOPHER L. COLE | | MECHANICAL/PLUMBING PLANS EXAMINER | | 401 CLEMATIS STREET | | WEST PALM BEACH FL 33401 | | 561-805-6719 | | [email protected] | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2020-12-11 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2020-12-11 |
Time |
10:21 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2020-11-24 |
Time |
11:29 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2020-11-19 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2020-11-19 |
Time |
14:32 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2020-11-13 |
Time |
10:31 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2020-10-29 |
|
|
Cont ID |
|
Sent By |
fgiaquin |
Date |
2020-10-29 |
Time |
21:18 |
Rev Time |
0.00 |
Received By |
fgiaquin |
Date |
2020-10-14 |
Time |
10:31 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
3 |
Status |
N |
Date |
2020-12-02 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2020-12-02 |
Time |
11:18 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2020-12-02 |
Time |
10:34 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
N |
Date |
2020-11-18 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2020-11-18 |
Time |
12:37 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2020-11-18 |
Time |
11:57 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
N |
Date |
2020-10-26 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2020-10-26 |
Time |
14:06 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2020-10-26 |
Time |
12:39 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
3 |
Status |
P |
Date |
2020-12-03 |
|
|
Cont ID |
|
Sent By |
medwards |
Date |
2020-12-03 |
Time |
06:47 |
Rev Time |
0.00 |
Received By |
medwards |
Date |
2020-12-03 |
Time |
06:47 |
Sent To |
|
|
Notes |
2020-12-02 11:27:39 | A SIGNED AND SEALED HARD COPY OF THE LP TANK HOLD DOWN | | AND ANODE BAG INSTALLATION DETAIL SHEET SHALL BE | | DROPPED OFF AT THE WPB BUILDING DEPT. FOR PERMIT | | ISSUANCE. | | THE CONTRACTOR SHALL ATTACH A PLAN REVIEW REQUEST WITH | | THE SPEC SHEET TO EXPLAIN THE PURPOSE OF THE SUBMITTAL. | | | | CCOLE | | 12/2/2020 |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
2 |
Status |
F |
Date |
2020-11-19 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2020-11-19 |
Time |
14:25 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2020-11-19 |
Time |
14:25 |
Sent To |
|
|
Notes |
2020-11-19 14:26:39 | FOR THE PREFAB SLAB DRAWING = SIGNED AND SEALED | | DRAWINGS IN PROJECTDOX NEED TO BE | | DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR | | ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW. | | DRAWINGS DO NOT SHOW IN "ADOBE READER" AS | | DIGITALLY/ELECTRONICALLY SIGNED. - OR - IF YOUR | | ARCHITECT OR ENGINEER DOES NOT HAVE AN ELECTRONIC OR | | DIGITAL SIGNATURE - PLEASE DROP OFF (CITY HALL DROP | | BOX) THE ORIGINAL SIGNED AND SEALED DRAWINGS/DOCUMENTS | | ALONG WITH A "PLAN REVIEW REQUEST FORM" EXPLAINING THE | | REASON FOR SUBMITTING THE DOCUMENT OR DRAWINGS. PLAN | | REVIEW REQUEST FORM CAN BE OBTAINED BY E MAILING | | [email protected] AND ASKING FOR THE FORM. |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
F |
Date |
2020-10-27 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2020-10-27 |
Time |
15:47 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2020-10-27 |
Time |
15:47 |
Sent To |
|
|
Notes |
2020-10-27 15:48:16 | FOR THE PREFAB SLAB DRAWING = SIGNED AND SEALED | | DRAWINGS IN PROJECTDOX NEED TO BE | | DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR | | ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW. | | DRAWINGS DO NOT SHOW IN "ADOBE READER" AS | | DIGITALLY/ELECTRONICALLY SIGNED. - OR - IF YOUR | | ARCHITECT OR ENGINEER DOES NOT HAVE AN ELECTRONIC OR | | DIGITAL SIGNATURE - PLEASE DROP OFF (CITY HALL DROP | | BOX) THE ORIGINAL SIGNED AND SEALED DRAWINGS/DOCUMENTS | | ALONG WITH A "PLAN REVIEW REQUEST FORM" EXPLAINING THE | | REASON FOR SUBMITTING THE DOCUMENT OR DRAWINGS. PLAN | | REVIEW REQUEST FORM CAN BE OBTAINED BY E MAILING | | [email protected] AND ASKING FOR THE FORM.-------------------- | | ------------------------------------------------------- | | ------------------------------------------------------- | | ------------------------------------------------------- | | ------------------------------------------------------- | | --------------------------------------------- | 2020-10-26 14:09:20 | THE CONTRACTOR OR QUALIFIER WHO PREPARED THE DRAWING | | SHALL PROVIDE HIS/HER SIGNATURE ON IT- SECTION 107.2.1 | | WPB, AND FLORIDA STATUTES 471.003(2)(H) & 471.025. | | CCOLE 10/26/2020. |
|
|
Review Stop |
Z |
ZONING |
Rev No |
2 |
Status |
P |
Date |
2020-12-09 |
|
|
Cont ID |
|
Sent By |
rthermid |
Date |
2020-12-09 |
Time |
|
Rev Time |
0.00 |
Received By |
rthermid |
Date |
2020-12-09 |
Time |
|
Sent To |
I |
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
P |
Date |
2020-10-20 |
|
|
Cont ID |
|
Sent By |
rthermid |
Date |
2020-10-20 |
Time |
|
Rev Time |
|
Received By |
rthermid |
Date |
2020-10-20 |
Time |
|
Sent To |
I |
|
Notes |
|
|