Plan Review Stops For Permit 20091213 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
P |
Date |
2020-10-09 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2020-10-09 |
Time |
11:20 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2020-10-09 |
Time |
09:01 |
Sent To |
|
|
Notes |
2020-10-09 11:27:17 | BUILDING REVIEW APPROVED WITH PROVISO: | | 1-VERIFY HEADROOM CLEARANCE AT STAIR LANDING AREA AND | | SECOND FLOOR ABOVE. NEED 80 INCHES MIN. SEC. 1011.3 | | FBC-BUILDING. | | 2-VERIFY PLANTER HEIGHT TO COMPLY WITH THE BARRIER | | HEIGHT OF 27 INCHES AS REQUIRED BY SEC. 307.4 | | FBC-ACCESSIBILITY FOR REQUIRED VERTICAL CLEARANCE BELOW | | STAIRWAY. | | 3-) WELDED OR BOLTED CONNECTIONS | | THE CONTRACTOR IS REQUIRED TO PROVIDE WELD PROCEDURE | | SPECIFICATIONS & WELDER OPERATOR PERFORMANCE | | QUALIFICATION RECORDS IN ACCORDANCE WITH THE REFERENCED | | STANDARDS AT TIME OF INSPECTION. | | 2017 FBC-B 2204.1 WELDING | | 1. WELD PROCEDURES SPECIFICATIONS | | 2) QUALIFICATIONS OF WELDING PERSONAL | | 2017 FBC-B 2204.2 BOLTING. | | |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2020-10-06 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2020-10-06 |
Time |
12:02 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2020-10-06 |
Time |
11:58 |
Sent To |
|
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
1 |
Status |
P |
Date |
2020-10-08 |
|
|
Cont ID |
|
Sent By |
pleduc |
Date |
2020-10-08 |
Time |
|
Rev Time |
0.00 |
Received By |
pleduc |
Date |
2020-10-08 |
Time |
14:40 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2020-12-04 |
|
|
Cont ID |
|
Sent By |
lcrespo |
Date |
2020-12-04 |
Time |
14:37 |
Rev Time |
0.00 |
Received By |
lcrespo |
Date |
2020-12-02 |
Time |
14:52 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2020-10-20 |
|
|
Cont ID |
|
Sent By |
equinone |
Date |
2020-10-20 |
Time |
10:44 |
Rev Time |
0.00 |
Received By |
equinone |
Date |
2020-09-28 |
Time |
18:42 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
1 |
Status |
N |
Date |
2020-09-29 |
|
|
Cont ID |
|
Sent By |
medwards |
Date |
2020-09-29 |
Time |
07:08 |
Rev Time |
0.00 |
Received By |
medwards |
Date |
2020-09-29 |
Time |
06:58 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
P |
Date |
2020-12-04 |
|
|
Cont ID |
|
Sent By |
lcrespo |
Date |
2020-12-04 |
Time |
14:37 |
Rev Time |
0.00 |
Received By |
lcrespo |
Date |
2020-12-04 |
Time |
14:37 |
Sent To |
|
|
Notes |
2020-12-04 14:38:30 | 12/04/20 REVIEWED FOR CODE COMPLIANCE (PLUMBING) | | | | BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE | | COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN | | PROFESSIONAL, CONTRACTORS, OR THEIR REPRESENTATIVES | | FROM THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, | | STATE, AND NATIONAL CODES AND STANDARDS IN EFFECT AT | | THE TIME OF PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK | | OF EVERY ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM | | REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES | | / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO | | AVOID VOIDING OF THE PERMIT. | | | | LUIS A. CRESPO | | PLUMBING PLAN EXAMINER / INSPECTOR | | EMAIL: [email protected] OFFICE: 561 805-6720 | | |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
F |
Date |
2020-10-01 |
|
|
Cont ID |
|
Sent By |
lcrespo |
Date |
2020-10-01 |
Time |
15:28 |
Rev Time |
0.00 |
Received By |
lcrespo |
Date |
2020-10-01 |
Time |
13:52 |
Sent To |
|
|
Notes |
2020-10-01 15:29:16 | 010/01/20 1ND PLUMBING REVIEW**DENIED** WITH COMMENTS | | | | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS | | TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE | | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. | | | | 1. A SUB IRRIGATION PERMIT IS REQUIRED BY A LICENSED | | CONTRACTOR FOR THE SCOPE OF WORK PER THE WPB AMENDMENTS | | TO THE FBC SEC. 105.1. | | | | 2. PLEASE PROVIDE CALCULATIONS FOR STORM DRAIN SIZING | | INCLUDING THE EXISTING THAT THE NEW DRAIN IS TO CONNECT | | TO. INCLUDE THE IMPACT OF THE IRRIGATION SYSTEM ON THE | | DRAINAGE SYSTEM. | | | | 3. PLEASE DETAIL OR PROVIDE SPECIFIC SPECIFICATION AND | | TESTING STANDARDS IF CORRUGATED PIPE AND FITTINGS WILL | | BE USED TO PECULATE WATER FROM PLANTER IN COMPLIANCE | | WITH FBC PL TABLES 702.1 AND 702.4. | | | | 4. PLEASE PROVIVE WHERE ALL STORM DRAIN CONNECTIONS ARE | | SHOWN ON THE SITE/CIVIL DRAWINGS PER THE WPB FBC | | 107.2.1. | | | | WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION & | | REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS | | NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL | | REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE | | REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION | | PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO | | EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED | | COOPERATION. | | | | LUIS A. CRESPO | | PLUMBING PLAN EXAMINER / INSPECTOR | | EMAIL: [email protected] OFFICE: 561 805-6720 | | |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
2 |
Status |
P |
Date |
2020-12-04 |
|
|
Cont ID |
|
Sent By |
lcrespo |
Date |
2020-12-04 |
Time |
14:37 |
Rev Time |
0.00 |
Received By |
lcrespo |
Date |
2020-12-04 |
Time |
14:37 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
P |
Date |
2020-10-20 |
|
|
Cont ID |
|
Sent By |
equinone |
Date |
2020-10-20 |
Time |
10:43 |
Rev Time |
0.00 |
Received By |
equinone |
Date |
2020-10-20 |
Time |
10:43 |
Sent To |
|
|
Notes |
2020-10-06 12:03:35 | ELECTRIC PAGE SIGNATURE IS GOOD TO GO JLEAHY |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
P |
Date |
2020-10-13 |
|
|
Cont ID |
|
Sent By |
eschneid |
Date |
2020-10-13 |
Time |
11:10 |
Rev Time |
0.50 |
Received By |
eschneid |
Date |
2020-10-13 |
Time |
10:48 |
Sent To |
|
|
Notes |
|
|