Plan Review Details - Permit 20090731
Plan Review Stops For Permit 20090731 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
P |
Date |
2020-10-06 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2020-10-06 |
Time |
14:21 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2020-10-06 |
Time |
14:21 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2020-09-29 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2020-09-29 |
Time |
10:50 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2020-09-29 |
Time |
10:32 |
Sent To |
|
|
Notes |
2020-09-29 11:22:57 | PLAN | | REVIEW COMMENTS | | | | 1ST REVIEW: FBC SIXTH EDITION (2017) | | ROBERT MCDOUGAL, CBO | | COMMERCIAL COMBINATION PLANS EXAMINER | | (561) 805-6714 | | [email protected] | | | | DENIED BY BUILDING | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | 1) SPECIFY THE MEAN ROOF HEIGHT OF THE BUILDING ON THE | | PLANS. FBC 107.2 |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2020-10-06 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2020-10-06 |
Time |
14:25 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2020-09-30 |
Time |
07:48 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2020-09-29 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2020-09-29 |
Time |
11:23 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2020-09-17 |
Time |
09:17 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
3 |
Status |
P |
Date |
2020-11-16 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2020-11-16 |
Time |
10:28 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2020-11-16 |
Time |
10:23 |
Sent To |
|
|
Notes |
2020-11-16 10:29:54 | DESIGN PRESSURES CALCULATIONS CALCULATIONS SUBMITTED | | WITH EMBOSSED SEAL AND ENGINEER'S ORIGINAL SIGNATURE | | MATCHES APPROVED ONE. JG. |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
2 |
Status |
F |
Date |
2020-10-06 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2020-10-06 |
Time |
14:25 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2020-10-06 |
Time |
14:25 |
Sent To |
|
|
Notes |
2020-10-06 14:25:36 | THE WIND LOAD CHART FROM THE ENGINEER IS NOT DIGITALLY | | SIGNED. ELECTRONICALLY SUBMITTED DRAWINGS ARE REQUIRED | | TO HAVE THE ENGINEER'S DIGITAL SIGNATURE ON THEM. YOU | | ALSO HAVE THE OPTION TO SUBMIT THE SIGNED AND SEALED | | PAPER VERSION OF DRAWINGS. AFTER THE ELECTRONIC PLANS | | HAVE BEEN APPROVED, YOU CAN SUBMIT THE CORRESPONDING | | PAPER DRAWINGS AT THE BUILDING DEPARTMENT TO BE | | VERIFIED. THE ENGINEER'S ORIGINAL HANDWRITTEN SIGNATURE | | AND SEAL IS REQUIRED TO BE ON THE DRAWINGS. NO | | PHOTOCOPY OR OTHER FACSIMILES OF THE SIGNATURE ARE | | ACCEPTABLE. FS 471 & 61G15 |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
F |
Date |
2020-09-29 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2020-09-29 |
Time |
11:18 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2020-09-29 |
Time |
10:32 |
Sent To |
|
|
Notes |
2020-09-29 11:20:43 | THE WIND LOAD CHART FROM THE ENGINEER IS NOT DIGITALLY | | SIGNED. ELECTRONICALLY SUBMITTED DRAWINGS ARE REQUIRED | | TO HAVE THE ENGINEER'S DIGITAL SIGNATURE ON THEM. YOU | | ALSO HAVE THE OPTION TO SUBMIT THE SIGNED AND SEALED | | PAPER VERSION OF DRAWINGS. AFTER THE ELECTRONIC PLANS | | HAVE BEEN APPROVED, YOU CAN SUBMIT THE CORRESPONDING | | PAPER DRAWINGS AT THE BUILDING DEPARTMENT TO BE | | VERIFIED. THE ENGINEER'S ORIGINAL HANDWRITTEN SIGNATURE | | AND SEAL IS REQUIRED TO BE ON THE DRAWINGS. NO | | PHOTOCOPY OR OTHER FACSIMILES OF THE SIGNATURE ARE | | ACCEPTABLE. FS 471 & 61G15 |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |