Plan Review Stops For Permit 20090509 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
P |
Date |
2020-11-20 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2020-11-20 |
Time |
15:20 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2020-11-20 |
Time |
14:08 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
F |
Date |
2020-11-06 |
|
|
Cont ID |
|
Sent By |
mcdouga |
Date |
2020-11-06 |
Time |
08:16 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2020-11-06 |
Time |
07:41 |
Sent To |
|
|
Notes |
2020-11-06 08:30:46 | PLAN | | REVIEW COMMENTS | | | | 1ST REVIEW: FBC SIXTH EDITION (2017) | | ROBERT MCDOUGAL, CBO | | COMMERCIAL COMBINATION PLANS EXAMINER | | (561) 805-6714 | | [email protected] | | | | DENIED BY BUILDING | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | 1) I HAVE NO IDEA WHAT YOU ARE GOING TO BE INSTALLING. | | THERE ARE MULTIPLE PRODUCT APPROVALS FROM DIFFERENT | | MANUFACTURERS FOR THE (1) DOOR AND FOR THE SAME WINDOW | | TYPE. YOU WILL NEED TO PUT THE PRODUCT APPROVAL NUMBER | | IN THE INSTALLATION SCHEDULE FOR EACH WINDOW OPENING TO | | CLARIFY. FBC 107.2 | | | | 2) THERE IS NO PRODUCT APPROVALS FOR THE ROLL DOWN | | SHUTTERS. I WILL ALSO NEED AN INSTALLATION SCHEDULE FOR | | THE ROLL DOWN SHUTTERS WITH REQUIRED GLASS SEPARATION, | | SHUTTER SPAN, ANCHOR TYPE, ANCHOR SPACING AND ANY OTHER | | DETAILS NEEDED TO DETERMINE IF THEY WILL MEET THE | | REQUIRED WIND LOADS. FBC 107.2 AND FBC-R301.2.1.2 | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2020-09-28 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2020-09-28 |
Time |
14:56 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2020-09-28 |
Time |
13:53 |
Sent To |
|
|
Notes |
2020-09-28 14:58:11 | PLAN | | REVIEW COMMENTS | | | | 1ST REVIEW: FBC SIXTH EDITION (2017) | | ROBERT MCDOUGAL, CBO | | COMMERCIAL COMBINATION PLANS EXAMINER | | (561) 805-6714 | | [email protected] | | | | DENIED BY BUILDING | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | 1) FBC - R 301.2.1.2 SUBMIT AN INSTALLATION SCHEDULE | | FOR THE STORM PANELS. SPECIFY THE OPENING SIZE, THE | | WIND PRESSURES, TYPE OF ANCHOR, ANCHOR SPACING, EDGE | | DISTANCE, PANEL LENGTH, PANEL SPAN, SEPARATION DISTANCE | | FROM PANEL TO GLASS AND THE APPLICABLE SECTION NUMBER | | FROM THE INSTALLATION DRAWINGS. |
|
|
Review Stop |
HIST |
HISTORICAL |
Rev No |
3 |
Status |
P |
Date |
2020-11-25 |
|
|
Cont ID |
|
Sent By |
fmittner |
Date |
2020-11-25 |
Time |
13:46 |
Rev Time |
0.00 |
Received By |
fmittner |
Date |
2020-11-25 |
Time |
13:46 |
Sent To |
|
|
Notes |
|
|
Review Stop |
HIST |
HISTORICAL |
Rev No |
2 |
Status |
P |
Date |
2020-11-05 |
|
|
Cont ID |
|
Sent By |
fmittner |
Date |
2020-11-05 |
Time |
17:00 |
Rev Time |
0.00 |
Received By |
fmittner |
Date |
2020-11-05 |
Time |
17:00 |
Sent To |
|
|
Notes |
|
|
Review Stop |
HIST |
HISTORICAL |
Rev No |
1 |
Status |
F |
Date |
2020-09-24 |
|
|
Cont ID |
|
Sent By |
fmittner |
Date |
2020-09-24 |
Time |
15:15 |
Rev Time |
0.00 |
Received By |
fmittner |
Date |
2020-09-24 |
Time |
15:15 |
Sent To |
|
|
Notes |
2020-09-24 15:15:22 | HISOTRIC HOUSE, NO HR WINDOWS. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
4 |
Status |
N |
Date |
2020-12-07 |
|
|
Cont ID |
|
Sent By |
lmarchan |
Date |
2020-12-07 |
Time |
11:13 |
Rev Time |
0.00 |
Received By |
lmarchan |
Date |
2020-11-13 |
Time |
15:21 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2020-11-06 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2020-11-06 |
Time |
08:30 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2020-11-04 |
Time |
09:55 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2020-11-02 |
|
|
Cont ID |
|
Sent By |
lmarchan |
Date |
2020-11-02 |
Time |
15:57 |
Rev Time |
0.00 |
Received By |
lmarchan |
Date |
2020-10-30 |
Time |
17:07 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2020-09-28 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2020-09-28 |
Time |
14:58 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2020-09-16 |
Time |
16:55 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
2 |
Status |
N |
Date |
2020-11-06 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2020-11-06 |
Time |
08:30 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2020-11-06 |
Time |
07:41 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
F |
Date |
2020-09-28 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2020-09-28 |
Time |
14:58 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2020-09-28 |
Time |
13:53 |
Sent To |
|
|
Notes |
2020-09-28 15:14:40 | THE WIND LOAD DESIGN PRESSURE CHART FROM THE ENGINEER | | THAT WAS SUBMITTED HAS NOT BEEN DIGITALLY SIGNED BY THE | | ENGINEER. DOCUMENTS THAT ARE SUBMITTED FOR PUBLIC | | RECORD FROM AN ENGINEER ARE REQUIRED TO BE SIGNED AND | | SEALED. ELECTRONICALLY SUBMITTED DRAWINGS ARE REQUIRED | | TO HAVE THE ENGINEER'S DIGITAL SIGNATURE ON THEM. YOU | | ALSO HAVE THE OPTION TO SUBMIT THE SIGNED AND SEALED | | PAPER VERSION OF DRAWINGS. AFTER THE ELECTRONIC PLANS | | HAVE BEEN APPROVED, YOU CAN SUBMIT THE CORRESPONDING | | PAPER DRAWINGS AT THE BUILDING DEPARTMENT TO BE | | VERIFIED. THE ENGINEER'S ORIGINAL HANDWRITTEN SIGNATURE | | AND SEAL IS REQUIRED TO BE ON THE DRAWINGS. NO | | PHOTOCOPY OR OTHER FACSIMILES OF THE SIGNATURE ARE | | ACCEPTABLE. FS 471 & 61G15 |
|
|