Plan Review Details - Permit 20090223
Plan Review Stops For Permit 20090223
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2020-10-26 Cont ID  
Sent By rmcdouga Date 2020-10-26 Time 16:09 Rev Time 0.00
Received By rmcdouga Date 2020-10-26 Time 15:31 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2020-09-17 Cont ID  
Sent By rmcdouga Date 2020-09-17 Time 13:40 Rev Time 0.00
Received By rmcdouga Date 2020-09-17 Time 13:40 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-12-23 Cont ID  
Sent By jleahy Date 2020-12-23 Time 12:00 Rev Time 0.00
Received By jleahy Date 2020-10-21 Time 13:11 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-10-02 Cont ID  
Sent By shill Date 2020-10-02 Time 07:15 Rev Time 0.00
Received By shill Date 2020-09-04 Time 09:58 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2020-10-26 Cont ID  
Sent By rmcdouga Date 2020-10-26 Time 16:09 Rev Time 0.00
Received By rmcdouga Date 2020-10-26 Time 15:31 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2020-09-17 Cont ID  
Sent By rmcdouga Date 2020-09-17 Time 13:02 Rev Time 0.00
Received By rmcdouga Date 2020-09-17 Time 13:02 Sent To  
Notes
2020-09-17 13:02:57ELECTRONICALLY SUBMITTED DRAWINGS ARE REQUIRED TO HAVE
 THE ENGINEER'S DIGITAL SIGNATURE ON THEM. YOU ALSO HAVE
 THE OPTION TO SUBMIT THE SIGNED AND SEALED PAPER
 VERSION OF DRAWINGS. AFTER THE ELECTRONIC PLANS HAVE
 BEEN APPROVED, YOU CAN SUBMIT THE CORRESPONDING PAPER
 DRAWINGS AT THE BUILDING DEPARTMENT TO BE VERIFIED. THE
 ENGINEER'S ORIGINAL HANDWRITTEN SIGNATURE AND SEAL IS
 REQUIRED TO BE ON THE DRAWINGS. NO PHOTOCOPY OR OTHER
 FACSIMILES OF THE SIGNATURE ARE ACCEPTABLE. FS 471 &
 61G15

Review Stop Z ZONING
Rev No 2 Status P Date 2020-12-21 Cont ID  
Sent By ajones Date 2020-12-21 Time 15:56 Rev Time 0.00
Received By ajones Date 2020-12-21 Time 15:56 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2020-09-29 Cont ID  
Sent By ajones Date 2020-09-29 Time 17:01 Rev Time 0.00
Received By ajones Date 2020-09-29 Time 17:01 Sent To  
Notes
2020-09-29 17:02:489/29/20- FAILED. ARE THE PROPOSED CANPOYS SHOWN ON THE
 APPROVED SITE PLAN?


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved