Plan Review Details - Permit 20090114
Plan Review Stops For Permit 20090114
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2020-09-23 Cont ID  
Sent By rmcdouga Date 2020-09-23 Time 16:07 Rev Time 0.00
Received By rmcdouga Date 2020-09-23 Time 16:02 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2020-09-15 Cont ID  
Sent By jleahy Date 2020-09-15 Time 17:34 Rev Time 0.00
Received By jleahy Date 2020-09-15 Time 17:30 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2020-09-03 Cont ID  
Sent By lcrespo Date 2020-09-03 Time 08:34 Rev Time 0.00
Received By lcrespo Date 2020-09-03 Time 08:09 Sent To  
Notes
2020-09-03 08:20:03THE PLANS SUBMITTED STATE THAT THERE IS AN EXISTING
 HEATER BUT THE CITY OF WEST PALM BEACH DOES NOT HAVE
 ANY RECORD OF PERMIT OR INSPECTIONS ON THE POOL HEATER.
 THIS IS UP TO THE HOME OWNER TO MAKE APPLICATION TO THE
 BUILDING OFFICIAL AND OBTAIN THE REQUIRED PERMIT.
  
 GAS PLAN REVIEW, A GAS PLAN HAS NOT BEEN INCLUDED IN
 THIS SUBMITTAL PACKAGE. A GAS PLAN REVIEW HAS NOT BEEN
 PERFORMED AT THIS TIME. A SEPARATE GAS PERMIT AND PLANS
 WILL BE REQUIRED FOR A CONTRACTOR TO PERFORM THE
 RELATED WORK. PROVIDE COMPLETE PLANS AND GAS RISER THAT
 REFLECTS THE ENTIRE SCOPE OF GAS WORK TO BE DONE PER
 THE WPB AMENDMENTS TO FBC SEC. 107.2.1.
  
 A SUB GAS PERMIT IS REQUIRED BY A LICENSED CONTRACTOR
 FOR THE SCOPE OF WORK PER THE WPB AMENDMENTS TO THE FBC
 SEC. 105.1.
  

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-09-23 Cont ID  
Sent By rmcdouga Date 2020-09-23 Time 16:07 Rev Time 0.00
Received By rmcdouga Date 2020-09-02 Time 19:34 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2020-09-03 Cont ID  
Sent By lcrespo Date 2020-09-03 Time 08:34 Rev Time 0.00
Received By lcrespo Date 2020-09-03 Time 08:02 Sent To  
Notes
2020-09-03 08:35:0109/03/20 REVIEWED FOR CODE COMPLIANCE (PLUMBING/POOL)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS OR THEIR REPRESENTATIVES FROM
 THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, STATE AND
 NATIONAL CODES AND STANDARDS IN EFFECT AT THE TIME OF
 PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK OF EVERY
 ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2020-09-23 Cont ID  
Sent By rmcdouga Date 2020-09-23 Time 16:07 Rev Time 0.00
Received By rmcdouga Date 2020-09-23 Time 16:02 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2020-09-22 Cont ID  
Sent By kalexand Date 2020-09-22 Time 23:32 Rev Time 0.00
Received By kalexand Date 2020-09-22 Time 23:32 Sent To I
Notes
2020-09-22 23:35:52ZONING PLAN REVIEW
 ________________________________________
  
 DATE OF REVIEW:
 ________________________________________
  
 REVIEW STATUS: PASSED WITH PROVISOS
 ________________________________________
  
 THIS REVIEW HAS BEEN PASSED SUBJECT TO THE FOLLOWING
 PROVISOS:
  
 1. AS STAMPED ON SURVEY, PLEASE PROVIDE SETBACK
 DIMENSIONS FROM PROPERTY LINES.
 ________________________________________
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 ________________________________________
  
 QUESTIONS/COMMENTS, PLEASE CONTACT THE FOLLOWING:
  
 KIZZI ALEXANDRE, ASSOCIATE PLANNER
 CITY OF WEST PALM BEACH
 DEVELOPMENT SERVICES DEPARTMENT ? PLANNING DIVISION
 401 CLEMATIS STREET - P.O. BOX 3147
 WEST PALM BEACH, FLORIDA 33402
  
 P: 561.822.1442
 TTY: 800.955.8771
 E: [email protected]
  
 W: WPB.ORG
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved