Plan Review Details - Permit 20081429
Plan Review Stops For Permit 20081429
Review Stop AD ADDRESSING
Rev No 1 Status P Date 2020-09-14 Cont ID  
Sent By cpuell Date 2020-09-14 Time 12:47 Rev Time 0.00
Received By cpuell Date 2020-09-14 Time 12:42 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2020-11-10 Cont ID  
Sent By mcphers Date 2020-11-10 Time 12:19 Rev Time 0.00
Received By rmcphers Date 2020-11-10 Time 12:19 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2020-10-21 Cont ID  
Sent By rmcphers Date 2020-10-21 Time 13:03 Rev Time 0.00
Received By rmcphers Date 2020-10-21 Time 13:03 Sent To  
Notes
2020-10-21 13:11:18NEW SFR
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2017 FBC WITH WPB CHAPTER 1
 AMENDMENTS
  
 CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107
 1) ONE BATHROOM NEEDS TO HAVE A 29" DOOR OPENING
 CLEARANCE AT TOILET ROOM. FBC R320.1.1 - PLEASE SHOW
 HOW THE 2'6" DOOR WILL ALLOW A CLEAR WIDTH OF 29" - FBC
 ACCESSIBILITY 404.2.3 CLEAR OPENINGS OF DOORWAYS WITH
 SWINGING DOORS SHALL BE MEASURED BETWEEN THE FACE OF
 THE DOOR AND THE STOP, WITH THE DOOR OPEN 90 DEGREES.
  
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2020-09-28 Cont ID  
Sent By rmcphers Date 2020-09-28 Time 12:02 Rev Time 0.00
Received By rmcphers Date 2020-09-28 Time 10:18 Sent To  
Notes
2020-09-28 12:10:29NEW SFR
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2017 FBC WITH WPB CHAPTER 1
 AMENDMENTS
  
 CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107
 1) ONE BATHROOM NEEDS TO HAVE A 29" DOOR OPENING
 CLEARANCE AT TOILET ROOM. FBC R320.1.1
 2) PLEASE PROVIDE A SIGNED AND SEALED SOIL REPORT PER
 NOTES ON THE DRAWINGS.
 3) PLEASE PROVIDE THE FRONT PAGES FOR THE FL20468
 FLORIDA STATE PRODUCT APPROVAL.
 4) PLEASE PROVIDE A COMPLETE MIAMI DADE OR FLORIDA
 STATE PRODUCT APPROVAL FOR THE GARAGE OVERHEAD DOOR
 (FRONT PAGES AND THE INSTALLATION INSTRUCTIONS).
  
  

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2020-12-02 Cont ID  
Sent By equinone Date 2020-12-02 Time 11:15 Rev Time 0.00
Received By equinone Date 2020-12-02 Time 11:15 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status F Date 2020-11-12 Cont ID  
Sent By equinone Date 2020-11-12 Time 09:19 Rev Time 0.00
Received By equinone Date 2020-11-12 Time 09:17 Sent To  
Notes
2020-11-12 09:27:03CODES IN EFFECT
 CODES IN EFFECT:
 FBC = FLORIDA BUILDING CODE 2017 6TH EDITION
 WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2017
 6TH ED, CHAPTER 1.
 FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017
 6TH EDITION
 FBC EX = FLORIDA BUILDING CODE EXISTING BUILDING 2017
 6TH EDITION
 FBC RE = FLORIDA RESIDENTIAL CODE 2017 6TH EDITION
 NEC = NFPA 70 2014 EDITION, NATIONAL ELECTRICAL CODE
 FS = FLORIDA STATUTES
 FAC = FLORIDA ADMINISTRATIVE CODE
  
 REVIEW STATUS: FAILED
  
 1) NEW ELECTRICAL RISER DIAGRAM SHOWS SEPARATE SERVICE
 DISCONNECT FOR PANEL A. PLEASE SHOW LOCATION OF SERVICE
 DISCONNECT. NEC 230.70
 2) PLEASE SPECIFY OVERCURRENT PROTECTION FOR SERVICE
 DISCONNECT TO COMPLY WITH NEC 230.90 AND NEC 230.91
  
 END OF COMMENTS.
  
 PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN
 RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RESUBMITTAL FORM.
  
 SINCERELY,
  
 ENRIQUE QUINONEZ
 ELECTRICAL PLANS EXAMINER
 561-805-6746
 [email protected]
  
  

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2020-09-23 Cont ID  
Sent By jleahy Date 2020-09-23 Time 14:49 Rev Time 0.00
Received By jleahy Date 2020-09-23 Time 14:19 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2021-02-01 Cont ID  
Sent By medwards Date 2021-02-01 Time 16:08 Rev Time 0.00
Received By medwards Date 2020-11-17 Time 16:56 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2020-11-12 Cont ID  
Sent By equinone Date 2020-11-12 Time 09:27 Rev Time 0.00
Received By equinone Date 2020-10-30 Time 00:32 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-10-21 Cont ID  
Sent By rmcphers Date 2020-10-21 Time 13:13 Rev Time 0.00
Received By rmcphers Date 2020-10-13 Time 14:13 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-09-28 Cont ID  
Sent By rmcphers Date 2020-09-28 Time 12:13 Rev Time 0.00
Received By rmcphers Date 2020-09-11 Time 14:55 Sent To  
Notes
***NONE***

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 3 Status P Date 2021-07-22 Cont ID  
Sent By lmarchan Date 2021-07-22 Time 11:54 Rev Time 0.00
Received By lmarchan Date 2020-11-17 Time 16:56 Sent To  
Notes
2021-07-21 11:51:03RECEIPT MU-2020-038094 - $11623.07 PAID
2020-11-17 16:56:5911/17/20 EMAILED IMPACT OFFICE FOR REVIEW. LEM

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 2 Status F Date 2020-11-10 Cont ID  
Sent By rmcphers Date 2020-11-10 Time 12:20 Rev Time 0.00
Received By rmcphers Date 2020-11-10 Time 12:20 Sent To  
Notes
2020-11-10 12:21:37PLANS WILL BE REVIEWED BY THE PBC IMPACT FEE OFFICE
 DIGITALLY VIA PROJECTDOX UPON NOTIFICATION BY THIS
 OFFICE. NOTIFICATION MAY OCCUR WHEN PLANS ARE NEAREST
 FINAL FORM. YOU MAY COORDINATE WITH THE IMPACT FEE
 OFFICE AT (561) 233-5025 OR SIMPLY UPLOAD THE MUNICIPAL
 IMPACT FEE QUESTIONNAIRE FORM TO YOUR PROJECT AND NAME
 THE FILE MUNICIPAL IMPACT FEE QUESTIONNAIRE. THE FORM
 CAN BE FOUND AT: HTTP://DISCOVER.PBCGOV.ORG/PZB/ADMINIS
 TRATION/PDF/IMPACTFEES/FORMS/QUESTIONNAIRE.PDF
  
 UPON APPROVAL AND FEE PAYMENT, PLEASE UPLOAD THE
 RECEIPT TO YOUR PROJECT OR EMAIL IT TO
 [email protected] .
  

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 1 Status F Date 2020-09-28 Cont ID  
Sent By rmcphers Date 2020-09-28 Time 12:11 Rev Time 0.00
Received By rmcphers Date 2020-09-28 Time 12:11 Sent To  
Notes
2020-09-28 12:12:14PLANS WILL BE REVIEWED BY THE PBC IMPACT FEE OFFICE
 DIGITALLY VIA PROJECTDOX UPON NOTIFICATION BY THIS
 OFFICE. NOTIFICATION MAY OCCUR WHEN PLANS ARE NEAREST
 FINAL FORM. YOU MAY COORDINATE WITH THE IMPACT FEE
 OFFICE AT (561) 233-5025 OR SIMPLY UPLOAD THE MUNICIPAL
 IMPACT FEE QUESTIONNAIRE FORM TO YOUR PROJECT AND NAME
 THE FILE MUNICIPAL IMPACT FEE QUESTIONNAIRE. THE FORM
 CAN BE FOUND AT: HTTP://DISCOVER.PBCGOV.ORG/PZB/ADMINIS
 TRATION/PDF/IMPACTFEES/FORMS/QUESTIONNAIRE.PDF
  
 UPON APPROVAL AND FEE PAYMENT, PLEASE UPLOAD THE
 RECEIPT TO YOUR PROJECT OR EMAIL IT TO
 [email protected] .
  

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2020-09-18 Cont ID  
Sent By medwards Date 2020-09-18 Time 14:29 Rev Time 0.00
Received By medwards Date 2020-09-18 Time 14:29 Sent To  
Notes
2020-09-18 14:29:54PROVISO: FBC EC R4.3.3.6 AIR HANDLING UNITS
 AIR HANDLER MAY BE INSTALLED IN THE ATTIC ONLY IF THE
 FOLLOWING CONDITIONS ARE MET.
 1) THE SERVICE PANEL OF THE EQUIPMENT IS LOCATED WITHIN
 6 FEET OF AN ATTIC ACCESS.
 2) A DEVICE IS INSTALLED TO ALERT THE OWNER OR SHUT
 DOWN THE UNIT WHEN THE CONDENSATION DRAIN IS NOT
 WORKING PROPERLY.
 3) THE ATTIC ACCESS OPENING IS OF SUFFICIENT SIZE TO
 REPLACE THE AIR HANDLER.
 4) A NOTICE IS POSTED ON THE ELECTRIC SERVICE PANEL
 INDICATING TO THE HOME OWNER THAT THE AIR HANDLER IS
 LOCATED IN THE ATTIC. SAID NOTICE SHALL BE IN ALL
 CAPITALS, IN 16-POINT TYPE WITH THE TITLE AND FIRST
 PARAGRAPH IN BOLD:
 NOTICE TO HOMEOWNER
  
 A PART OF YOUR AIR-CONDITIONING SYSTEM, THE AIR
 HANDLER, IS LOCATED IN THE ATTIC. FOR PROPER, EFFICIENT
 AND ECONOMIC OPERATION OF THE AIR CONDITIONING SYSTEM,
 YOU MUST ENSURE THAT REGULAR MAINTENANCE IS PERFORMED.
 YOUR AIR CONDITIONING SYSTEM IS EQUIPED WITH ONE OR
 BOTH OF THE FOLLOWING: (1) A DEVICE THAT WILL ALERT YOU
 WHEN THE CONDENSATION DRAIN IS NOT WORKING PROPERLY OR
 (2) A DEVICE THAT WILL SHUT DOWN THE SYSTEM WHEN THE
 CONDENSATION DRAIN IS NOT WORKING. TO LIMIT POTENTIAL
 DAMAGE TO YOUR HOME, AND TO AVOID DISRUPTION OF
 SERVICE, IT IS RECOMMENDED THAT YOU ENSURE PROPER
 WORKING ORDER OF THESE DEVICES BEFORE EACH SEASON OF
 PEAK OPERATION.
  

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2020-09-18 Cont ID  
Sent By medwards Date 2020-09-18 Time 13:41 Rev Time 0.00
Received By medwards Date 2020-09-18 Time 13:26 Sent To  
Notes
2020-09-18 13:41:551ST REVIEW FBC-2017 MECHANICAL
 PERMIT-20081429
  
 CODES IN EFFECT:
  
 FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017
 FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION
 2017
 FBC RES- FLORIDA RESIDENTIAL BUILDING CODE SIXTH
 EDITION 2017
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH
 EDITION 2017
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) PLEASE SHOW THAT THE AHU LOCATED IN THE ATTIC MEETS
 SECTION R403.3.6 OF FBC EC
  
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT
 CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE OLD
 SHEETS FROM THE PLAN SETS, BIND THEM TOGETHER
 SEPARATELY AND MARK VOID OR OLD ON THEM. PLEASE RETAIN
 THEM FOR REFERENCE WITH THE NEW SUBMITTED PLANS. THIS
 PROCESS WILL ALSO APPLY TO ANY DOCUMENTS SUCH AS
 PRODUCT APPROVALS OR CALCULATIONS BEING REPLACED OR
 UPDATED.
  
  
 MICHAEL EDWARDS
 MECHANICAL EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL. 33401
 561-805-6728
 [email protected]
  

Review Stop P PLUMBING
Rev No 1 Status P Date 2020-09-15 Cont ID  
Sent By lcrespo Date 2020-09-15 Time 16:56 Rev Time 0.00
Received By lcrespo Date 2020-09-15 Time 16:56 Sent To  
Notes
2020-09-15 16:56:5609/15/20 REVIEWED FOR CODE COMPLIANCE (PLUMBING)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS, OR THEIR REPRESENTATIVES
 FROM THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL,
 STATE, AND NATIONAL CODES AND STANDARDS IN EFFECT AT
 THE TIME OF PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK
 OF EVERY ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status P Date 2020-09-28 Cont ID  
Sent By rmcphers Date 2020-09-28 Time 12:12 Rev Time 0.00
Received By rmcphers Date 2020-09-28 Time 12:12 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 4 Status P Date 2021-02-01 Cont ID  
Sent By medwards Date 2021-02-01 Time 16:07 Rev Time 0.00
Received By medwards Date 2021-02-01 Time 16:06 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status P Date 2020-11-10 Cont ID  
Sent By rmcphers Date 2020-11-10 Time 12:21 Rev Time 0.00
Received By rmcphers Date 2020-11-10 Time 12:21 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2020-10-21 Cont ID  
Sent By rmcphers Date 2020-10-21 Time 13:12 Rev Time 0.00
Received By rmcphers Date 2020-10-21 Time 13:12 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2020-09-28 Cont ID  
Sent By rmcphers Date 2020-09-28 Time 12:13 Rev Time 0.00
Received By rmcphers Date 2020-09-28 Time 12:12 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2020-09-21 Cont ID  
Sent By kalexand Date 2020-09-21 Time 11:05 Rev Time 0.00
Received By kalexand Date 2020-09-21 Time 11:05 Sent To I
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved