Plan Review Details - Permit 20080906
Plan Review Stops For Permit 20080906
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2020-11-12 Cont ID  
Sent By rmcdouga Date 2020-11-12 Time 13:47 Rev Time 0.00
Received By rmcdouga Date 2020-11-12 Time 13:25 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2020-09-11 Cont ID  
Sent By rmcdouga Date 2020-09-11 Time 07:21 Rev Time 0.00
Received By rmcdouga Date 2020-09-11 Time 07:10 Sent To  
Notes
2020-09-11 07:28:22PLAN
 REVIEW COMMENTS
 FLOORING SOUND INSULATION
 1ST REVIEW: FBC SIXTH EDITION (2017)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) THE DOCUMENTS THAT WERE SUBMITTED ONLY HAVE THE
 FLAME SPREAD AND SMOKE DEVELOPED TEST REPORT. SUBMIT
 THE ACTUAL TEST REPORTS FROM AN APPROVED TESTING
 FACILITY FOR THE AIR BORNE AND STRUCTURE BORNE SOUND
 TRANSMISSION FOR THE PROPOSED FLOORING SYSTEM.
  
 FBC 1207.2 AIR-BORNE SOUND. ASTM E 90-04
 WALLS, PARTITIONS AND FLOOR/CEILING ASSEMBLIES
 SEPARATING DWELLING UNITS FROM EACH OTHER OR FROM
 PUBLIC OR SERVICE AREAS SHALL HAVE A SOUND TRANSMISSION
 CLASS (STC) OF NOT LESS THAN 50 (45 IF FIELD TESTED)
 FOR AIR-BORNE NOISE WHEN TESTED IN ACCORDANCE WITH ASTM
 E 90.
  
 FBC 1207.3 STRUCTURE-BORNE SOUND. ASTM E 492-09
 FLOOR/CEILING ASSEMBLIES BETWEEN DWELLING UNITS OR
 BETWEEN A DWELLING UNIT AND A PUBLIC OR SERVICE AREA
 WITHIN THE STRUCTURE SHALL HAVE AN IMPACT INSULATION
 CLASS (IIC) RATING OF NOT LESS THAN 50 (45 IF FIELD
 TESTED) WHEN TESTED IN ACCORDANCE WITH ASTM E 492.
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2020-08-26 Cont ID  
Sent By rmcdouga Date 2020-08-26 Time 08:14 Rev Time 0.00
Received By rmcdouga Date 2020-08-26 Time 08:14 Sent To  
Notes
2020-08-26 08:17:36THERE WERE NO CONSTRUCTION DOCUMENTS UPLOADED TO
 REVIEW. ONLY THE SUBMITTAL FORM WAS UPLOADED.

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2020-11-12 Cont ID  
Sent By rmcdouga Date 2020-11-12 Time 13:47 Rev Time 0.00
Received By rmcdouga Date 2020-11-06 Time 11:05 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-09-11 Cont ID  
Sent By rmcdouga Date 2020-09-11 Time 07:28 Rev Time 0.00
Received By rmcdouga Date 2020-08-26 Time 16:15 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2020-08-26 Cont ID  
Sent By rmcdouga Date 2020-08-26 Time 08:14 Rev Time 0.00
Received By rmcdouga Date 2020-08-19 Time 16:10 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status N Date 2020-11-12 Cont ID  
Sent By rmcdouga Date 2020-11-12 Time 13:27 Rev Time 0.00
Received By rmcdouga Date 2020-11-12 Time 13:25 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status N Date 2020-09-11 Cont ID  
Sent By rmcdouga Date 2020-09-11 Time 07:28 Rev Time 0.00
Received By rmcdouga Date 2020-09-11 Time 07:10 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2020-08-26 Cont ID  
Sent By rmcdouga Date 2020-08-26 Time 08:14 Rev Time 0.00
Received By rmcdouga Date 2020-08-26 Time 08:14 Sent To  
Notes
2020-08-26 08:18:48WILL NEED TO DETERMINE IF SIGNATURE IS REQUIRED WHEN
 DOCUMENTS ARE UPLOADED.


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved