|
 |
 |
 |
 |
 |
Plan Review Details - Permit 20080811
Plan Review Stops For Permit 20080811 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
P |
Date |
2020-08-31 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2020-08-31 |
Time |
15:17 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2020-08-31 |
Time |
15:16 |
Sent To |
|
|
Notes |
2020-08-31 15:19:30 | SPOKE TO ROGER WHO WORKS FOR THE CONTRACTOR AND AGREED | | TO SELECT A DIFFERENT ROOFING ASSEMBLY IN THE SAME NOA | | THAT WAS SUBMITTED. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
F |
Date |
2020-08-31 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2020-08-31 |
Time |
09:39 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2020-08-31 |
Time |
09:39 |
Sent To |
|
|
Notes |
2020-08-31 09:40:41 | PLAN | | REVIEW COMMENTS | | | | 1ST REVIEW: FBC SIXTH EDITION (2017) | | ROBERT MCDOUGAL, CBO | | COMMERCIAL COMBINATION PLANS EXAMINER | | (561) 805-6714 | | [email protected] | | | | DENIED BY BUILDING | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | 1) THE PRODUCT APPROVAL FOR THE FLAT DECK DOES NOT | | CORRESPOND WITH THE APPLICATION. FBC 107.1.2 |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2020-08-20 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2020-08-20 |
Time |
14:28 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2020-08-20 |
Time |
14:24 |
Sent To |
|
|
Notes |
2020-08-20 14:30:04 | ****CORRECTIONS**** | | | | SAMANTHA HILL | | BUILDING PLANS EXAMINER | | [email protected] | | 561-805-6724 | | | | FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) | | FBC B = FBC BUILDING | | FBC EB = FBC EXISTING BUILDING | | FBC A = FBC ACCESSIBILITY | | FBC EC = FBC ENERGY CONSERVATION | | FBC R = FBC RESIDENTIAL | | | | 1. FBC R 301, FOR THE FLAT DECK INDICATE WHICH APPROVED | | ASSEMBLY IS PROPOSED. SOME COMPONENTS WERE HIGHLIGHTED | | BUT IT IS NOT CLEAR WHICH ASSEMBLY WILL BE INSTALLED. | | IF THE PROPOSED ASSEMBLY DOES NOT MEET THE DESIGN | | PRESSURES FOR ZONES 2 AND 3 (PERIMETER AND CORNER, | | ENGINEERING WILL BE REQUIRED). | | | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2020-08-31 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2020-08-31 |
Time |
09:41 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2020-08-24 |
Time |
14:22 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2020-08-20 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2020-08-20 |
Time |
14:30 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2020-08-19 |
Time |
10:09 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
3 |
Status |
N |
Date |
2020-08-31 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2020-08-31 |
Time |
15:19 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2020-08-31 |
Time |
15:19 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
2 |
Status |
F |
Date |
2020-08-31 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2020-08-31 |
Time |
09:40 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2020-08-31 |
Time |
09:40 |
Sent To |
|
|
Notes |
2020-08-31 09:41:19 | ENGINEERING MAY BE REQUIRED | | IF ENGINEERING IS NOT DIGITALLY SIGNED, A PAPER | | ORIGINAL WILL BE REQUIRED (DROPPED OFF OR MAILED) | | | | |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
F |
Date |
2020-08-20 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2020-08-20 |
Time |
14:30 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2020-08-20 |
Time |
14:30 |
Sent To |
|
|
Notes |
2020-08-20 14:31:14 | ENGINEERING MAY BE REQUIRED | | IF ENGINEERING IS NOT DIGITALLY SIGNED, A PAPER | | ORIGINAL WILL BE REQUIRED (DROPPED OFF OR MAILED) | | | | |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |